Permit Information
Permit NumberBLD04-02470
StatusFinaled
Name TED MASON COMMERCIAL INC
Site Address 1803 N WILDWOOD AVE
Project NameSTEELWOOD FLEX CONDOS
Customer Number 
ePlanReviewNo
Description
(STEELWOOD FLEXIBLE COMMERCIAL CONDOMINIUMS)Building #1 This building is fire sprinklered for building area increase. To divide an existing 27,300 square foot building into 20 separate tenant spaces. This building is divided into separate condominiums to allow each unit to be separately owned. Work is to include interior walls, restrooms accessible to the disabled, exterior canopies, overhead doors, man doors, windows, masonry shear walls, and brick veneer all per the approved drawings, engineering, and plan review report on file. This permit does NOT establish a Certificate of Occupancy for any tenant space. Before occupancy, each tenant shall acquire a Certificate of Occupancy for the specific individual tenant space. No unit shall be sold as an individual unit until the condominium plat is recorded with Ada County. The fire sprinkler system shall comply with NFPA 13-2002 as regulated by the Fire Department. DRH04-00214 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Inspection Record Card- Bld  7/17/2006 DONE
BLD-Final7/12/20067/13/20067/13/2006ANR
DetailsTom Arcoraci
vern; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection7/12/20067/12/20067/12/2006PPASS
DetailsTroy Cobbley
Life safety finaled. Vern is in the process of installing the individual tenant addresses.
Code Occupancy Approval Temp  7/12/2006 FAIL
MUST BOND FOR $28,200 INCOMPLETE LANDSCAPE
FIRE-Final Inspection7/6/20067/6/20067/6/2006PCANC
DetailsTroy Cobbley
To be rescheduled for tomorrow
Case Summary (BLD)  6/22/2006  
FIRE-Conference2/16/20062/17/20062/17/2006ADONE
DetailsTroy Cobbley
I went over the life safety comments with Vern. Issues will be fire dept access, addressing and the fire sprinklers getting finaled. Door hardware will be addressed in the T.I. stage.
BLD-Energy code compliance2/1/20062/2/20062/2/2006APART
DetailsJim Sly
Clint; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
Frame and Energy OK......1st 2 office spaces....starting from S end of Bldg
BLD-Conference1/24/20061/25/20061/25/2006ADONE
DetailsJim Sly
Vern ; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
Met with Vern.
BLD-Other8/4/20058/4/20058/4/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/4/2005 at 9:47:20 AM. Contact: ###-####.
C/N....Eng of record to approve mortar at CMU walls which failed to meet specified PSI strength......OR...... Contractor to remove and replace deficient mortar. Special insp tests and approvals req. for new mortar replacement.
BLD-Foundation6/8/20056/8/20056/8/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/8/2005 at 7:18:48 AM.
Column pads at entrys OK
BLD-Footing6/7/20056/7/20056/7/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/7/2005 at 7:25:22 AM.
6 footing pads at exterior doors OK.
BLD-Framing/Rough-in6/2/20056/3/20056/3/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/2/2005 at 1:13:39 PM. Contact: ###-####.
over build inspections,, ok to cover,, 2 areas
BLD-Other5/10/20055/11/20055/11/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/10/2005 at 12:54:52 PM. Contact: ###-####. Advised for special inspection CMU shear/grout fill required. 5/11/2005 1:00:30 PM
BLD-Footing4/14/20054/14/20054/14/2005PPART
DetailsJim Sly
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Footing piers for columns at ext..OK (approx 20) 4/14/2005 2:21:19 PM
BLD-Footing4/13/20054/13/20054/13/2005PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/13/2005 at 7:27:33 AM.
BLD-Framing/Rough-in4/12/20054/12/20054/12/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/12/2005 at 9:10:13 AM. Contact: ###-####. NW office and hall OK. 4/12/2005 3:28:53 PM
BLD-Foundation4/4/20054/4/20054/4/2005PPASS
DetailsJim Sly
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Foot OK for small bldg at S. side. 4/4/2005 2:31:22 PM
BLD-Footing3/30/20053/31/20053/31/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/30/2005 at 8:59:55 PM. Contact: ###-####. Footing for small S. Bldg section approx 20x25' and Pads for porches. OK 3/31/2005 10:40:21 AM
BLD-Footing3/22/20053/22/20053/22/2005PCANC
DetailsJim Sly
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Canc by Contr. 3/22/2005 3:43:20 PM
Override - Parcel Holds1/1/19001/1/19003/22/2005  
BLD-Footing3/17/20053/18/20053/18/2005PNR
DetailsJim Sly
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing3/17/20053/18/20053/18/2005PNR
DetailsJim Sly
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Override - Parcel Holds1/1/19001/1/19003/17/2005  
BLD-Final3/14/20053/15/20053/15/2005APART
DetailsJim Sly
clint; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Should be frame.....Offices at W. end OK. 3/15/2005 2:38:14 PM
FIRE-Final Inspection3/14/20053/15/20053/15/2005ANR
DetailsTroy Cobbley
clint; Phone #: ###-#### Job is not ready for inspection. 3/15/2005 11:23:25 AM
Override - Parcel Holds1/1/19001/1/19003/14/2005  
Override - Parcel Holds1/1/19001/1/19003/14/2005  
BLD-Framing/Rough-in3/7/20053/8/20053/8/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/7/2005 at 9:10:43 AM. Contact: ###-####. Shear wall foundations poured (for Main BLDG) ....Need special insp reports or approval from Engineer of record. Framing OK for 3 small offices located at West end. 3/8/2005 1:44:06 PM
BLD-Foundation2/22/20052/22/20052/22/2005PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/22/2005 at 10:15:21 AM.
strata to do 2/22/2005 2:41:01 PM special insp. 2/22/2005 2:41:11 PM
BLD-Footing2/22/20052/22/20052/22/2005PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/22/2005 at 10:16:56 AM.
epoxied dowels, and piers ok.
Strata to do special insp. 2/22/2005 2:40:22 PM
Issue PAID IN FULL permit  1/18/2005 DONE
Routing - PLAN CHECK1/7/2005 1/10/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/10/2005 DONE
Permit Ready to Issue  1/10/2005 DONE
Print Occupancy Form  1/10/2005 DONE
Telephone call  1/10/2005 DONE
talked to elizabeth cooper at ###-#### that permit is ready
Plan assigned to (CJW)10/20/2004 1/10/2005 PASS
1/10/2005 08:29:55 CJW - activity updated through activity BLDA022 from case BLD04-02470.
Routing - PLANNING12/29/2004 1/7/2005 PASS
Approved for Design Review per DRH04-214 and as noted on plans.
Routing - PLAN CHECK12/23/2004 12/29/2004  
Held at Carl J. Westfall's desk untill resubmittals are received. (12-29-04) Sent back to Planning after resubmittals were inserted in the drawings.
Plan resubmittals received  12/27/2004 DONE
Received transmittal letter with three copies of A1.0 taken to Carl W.
Routing - PLANNING12/17/2004 12/23/2004 FAIL
Landscape plan must be revised per conditions, particularly along Wildwood, and Public Works must be contacted regarding solid waste requirements.
Routing - PLAN CHECK12/1/2004 12/17/2004 PASS
(12-1-04) Waiting for resubmittals. (12-13-04) All items resolved except one. Waiting for Architect's response. (12-17-04) The drawings were approved with clarifications after the 3rd resubmittal review.
Plan resubmittals received  12/15/2004 DONE
Received Transmittal Letter, & 2 Copys of sheet A6.0 Taken to Carl W.
Routing - PLANNING Land Div12/13/2004 12/13/2004 PASS
Approved for tenant improvement. Prior to signature of City Engineer, must verify that interior partitions match unit spaces on Steelwood Condominiums.
Plan resubmittals received  12/8/2004 DONE
Received Transmittal Letter, 2- Sturctural Calcs & 2 Copys of sheets S1.0,S2.1,S2.2,S3.0 Taken to Carl Westfall.
Routing - FIRE11/24/2004 12/1/2004 PASS
resubmittal acceptable.
Routing - PLANNING11/22/2004 11/24/2004 FAIL
Design Review conditions not met.
Routing - Erosion and Sediment11/24/2004 11/24/2004 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK11/8/2004 11/22/2004 FAIL
Failed 2nd plan review.
Routing - PLANNING Land Div11/22/2004 11/22/2004 FAIL
Must record final plat of Steelwood Condominiums. Final plat scheduled for City Council on December 14, 2004.
Plan resubmittals received  11/15/2004 DONE
Received transmittal with two A1.0 sheets taken to Carl W.
Plan resubmittals received  11/12/2004 DONE
Received Transmittal Letter, & 2 Sets of A0.0,A0.2,A2.1,A2.2,A6.0,A9.0 Taken to Carl W.
Routing - FIRE11/3/2004 11/8/2004 FAIL
lacks FD access, hydrant access and sprinkler information. Review faxed to architect.
1st review completed  11/8/2004 FAIL
failed Planning, ESC, plan check and Fire.
Routing - PLAN CHECK10/28/2004 11/3/2004 FAIL
Failed 1st IBC plan review. IBC plan review was started November 1, 2004 and finished November 3, 2004. Resubmitted drawings were required from the architect. See the plan review report.
Plan resubmittals received  11/2/2004 DONE
Received ESC application two narratives and two esc plans taken to Carl W.
Plan resubmittals received  11/2/2004 DONE
Received Transmittal Letter, 2 Copys of sheet L1.0 Taken to Carl Westfall...
Routing - PLANNING10/25/2004 10/28/2004 FAIL
Failed due to plans not complying with conditions of approval as set forth in DRH04-00214; 10/25/04; Martin Santoyo.
Failed, called applicant and told him he needed a variance for bldg. A which requires a 20' street yard setback and or revise the plans to meet the 20' setback.
Routing - Erosion and Sediment10/25/2004 10/25/2004 FAIL
No ESC application, waiver request or esc plan. Informed contact that a esc permit will be required. Also, informed contact person to either submit a waiver request or plan for review along with the application.
Routing - PUBLIC WORKS10/20/2004 10/25/2004 PASS
Application received  10/19/2004  
Recd Pcfee & Taken To Pln CK  10/19/2004  
Plans ACCEPTED BY PLAN TECH  10/19/2004 DONE
Fee Review-notes10/19/200410/19/2004