BLD-Final | 4/14/2005 | 4/15/2005 | 4/15/2005 | P | PASS |
Jim Storey
|
|
|
###-####
|
DOC - Permit Finaled | 4/15/2005 | 4/15/2005 | 4/15/2005 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Energy code compliance | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | PASS |
Jim Storey
|
|
|
###-#### troy
|
BLD-Framing/Rough-in | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | PASS |
Jim Storey
|
|
|
###-#### troy made ok
|
BLD-Framing/Rough-in | 2/10/2005 | 2/11/2005 | 2/11/2005 | A | CANC |
Lane Manuel
|
|
|
troy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 2/10/2005 | 2/11/2005 | 2/11/2005 | P | PART |
Lane Manuel
|
|
|
###-#### - troy
|
BLD-Framing/Rough-in | 2/10/2005 | 2/10/2005 | 2/10/2005 | P | CANC |
Jim Storey
|
|
|
troy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 11/29/2004 | 11/29/2004 | 11/29/2004 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 8:19:41 AM. Contact: ###-####.
|
BLD-Footing | 11/24/2004 | 11/24/2004 | 11/24/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/24/2004 at 7:36:03 AM. Contact: ###-####. every thing ok called contractor told his message mec that they looked close on the east side prop line to check befor pouring 11/24/2004 12:35:23 PM
|
Issue PAID IN FULL permit | | | 11/10/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/27/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/27/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/27/2004 | | DONE |
|
|
|
Left message that permit is ready & fees///10/27/04 1:40pm BAS
|
Pending Assignment by DJO | 10/19/2004 | | 10/26/2004 | | DONE |
|
|
|
10/26/2004 13:10:36 SAM - activity updated through activity BLDA183 from case BLD04-02473.
|
Routing - PLAN CHECK | 10/21/2004 | | 10/26/2004 | | PASS |
|
|
|
Dan O.
|
Plan assigned to (SAM) | 10/26/2004 | | 10/26/2004 | | PASS |
|
|
|
10/26/2004 15:15:48 SAM - activity updated through activity BLDA022 from case BLD04-02473.
|
Case Summary (BLD) | | | 10/26/2004 | | |
|
|
|
|
Plan Review Report | | | 10/26/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2004 | | DONE |
|
|
|
|
Routing - PLANNING | 10/20/2004 | | 10/20/2004 | | PASS |
|
|
|
O.K. as redlined at the direction of the applicant. Front steps/landing shall not encroach into the side setback unless under 1' in height as measured from adjacent grade. Window seat at garage shall be removed, as it cannot encroach into the side setback.
|
Routing - PLANNING | 10/19/2004 | | 10/20/2004 | | FAIL |
|
|
|
Left message w/ applicant at 8:00a.m. on 10/20/2004. Bump-out at garage, and column at entry cannot encroach into side setbacks.
|
Routing - PUBLIC WORKS | 10/20/2004 | | 10/20/2004 | | PASS |
|
|
|
|
Application received | | | 10/19/2004 | | |
|
|
|
|