Second Notice BLD | 9/25/2006 | 9/25/2006 | 9/25/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 8/2/2006 | 8/2/2006 | 9/25/2006 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/28/2006 | 7/28/2006 | 8/2/2006 | | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 8/2/2006 | 8/2/2006 | 8/2/2006 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/12/2006 | 4/12/2006 | 4/13/2006 | | FAIL |
Tony Young
|
|
|
|
BLD-Aging Inspection | 2/9/2006 | 2/9/2006 | 2/13/2006 | | PASS |
Tony Young
|
|
|
|
BLD-Final | 5/6/2005 | 5/6/2005 | 5/6/2005 | P | PASS |
Tony Young
|
|
|
Kent; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
will drop me off final paperwork from special inspection agency,,, perm. c of o ok 5/6/2005 1:43:02 PM
|
Code Occupancy Approval | | | 5/6/2005 | | DONE |
|
|
|
Final per Michael Garner for Code Enforcement.
|
BLD-Final | 4/14/2005 | 4/15/2005 | 4/15/2005 | A | PART |
Tony Young
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
need final special inspection affidavid, temp occ. ok pending cdhd signoff 4/15/2005 11:42:27 AM
|
FIRE-Final Inspection | 4/14/2005 | 4/14/2005 | 4/14/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Conference | 4/7/2005 | 4/8/2005 | 4/8/2005 | P | DONE |
Troy Cobbley
|
|
|
kent; Phone #: ###-#### Went over life safety note with contractor. Looks like he'll need fire extinguishers on main level and in basement, provide occupant load sign and test the exit sign/emergency lights. No type one hood is being installed.
|
BLD-Conference | 4/7/2005 | 4/8/2005 | 4/8/2005 | P | PART |
Tony Young
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
conf on final issues 4/8/2005 4:16:10 PM
|
BLD-Framing/Rough-in | 2/17/2005 | 2/18/2005 | 2/18/2005 | P | PART |
Tony Young
|
|
|
###-#### Kent
ok to cover cooler floor area 2/18/2005 12:39:44 PM
|
BLD-Conference | 2/2/2005 | 2/3/2005 | 2/3/2005 | A | PART |
Tony Young
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
conf. on general project,,, need structural eng. to address some issues 2/3/2005 12:20:29 PM
|
BLD-Foundation | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PART |
Tony Young
|
|
|
perimeter foundation inspection only////tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
10am ,, met w/ contractor, s. i . inspector,, structural eng..,,, basement work to be done,,, will need paperwork on changes,,, si reports 1/26/2005 1:00:15 PM
|
Issue PAID IN FULL permit | | | 1/21/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2005 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 1/19/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/19/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/19/2005 | | DONE |
|
|
|
|
Telephone call | | | 1/19/2005 | | DONE |
|
|
|
lft vm tom phillips - ###-#### that permit is ready t be picked up
|
Routing - PLAN CHECK | 1/13/2005 | | 1/19/2005 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
Plan assigned to (JCB) | 10/27/2004 | | 1/19/2005 | | PASS |
|
|
|
1/19/2005 11:37:52 JCB - activity updated through activity BLDA022 from case BLD04-02503.
|
Plan resubmittals received | | | 1/18/2005 | | DONE |
|
|
|
Received two copies of revised sheets E1.0 two copies of 8 1/2 x 11 sheet A-1 and one copy of response letter. Routed to Jason B. kmm
|
Routing - Erosion and Sediment | 1/13/2005 | | 1/13/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 12/7/2004 | | 1/13/2005 | | FAIL |
|
|
|
Called architect explaining last few items to be clarified or provided. Waiting for response. Plans to route to Erosion/Sediment Control for third review.
|
Telephone call | | | 1/12/2005 | | |
|
|
|
Talked with architect James Murray concerning a plan view ramp framing plan still required with all details and connections noted. Told him this would be accepted in 81/2"x11" addendum form and attached to plans. Also new Certificate of Value required.
|
Telephone call | | | 1/11/2005 | | |
|
|
|
Called Michael Brown, structural engineer, to clarify special inspections. He will fax over a clarification sheet.
|
Telephone call | | | 1/11/2005 | | |
|
|
|
Called Walt Romero, of CSHQA, concerning the lighting plan, sheet E1.0. He said he would get back to me.
|
Plan resubmittals received | | | 1/6/2005 | | |
|
|
|
Received Transmittal Letter, 1 Walk in Specification , 2 Structural Calcs, 2 Copys of sheets A1.0,A2.0,A3.0,S1.1,E1.0 Taken to Jason B.
|
Plan resubmittals received | | | 1/6/2005 | | DONE |
|
|
|
Received two sets of sheets P1.1 taken to Jason.
|
Routing - PLANNING | 12/6/2004 | | 12/7/2004 | | PASS |
|
|
|
Sarah.
Approved per DRH04-00284, per revised plans submitted December 1, 2004 in the building set, and as noted on sheet C1.0.
|
Plan resubmittals requested | | | 12/6/2004 | | |
|
|
|
Plan resubmittals and written response required for further review.
|
Routing - Erosion and Sediment | 12/6/2004 | | 12/6/2004 | | FAIL |
|
|
|
ESC plan ok, but RP listed on application is not certified by Boise City as required by BMC 8-17. Informed PD.
|
Routing - PLAN CHECK | 11/15/2004 | | 12/6/2004 | | FAIL |
|
|
|
Second plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Erosion/Sediment Control and to Sarah in Planning.
|
Plan resubmittals received | | | 12/1/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of sheets A0.1,A1.0,A2.0,A9.0,C1.0,S1.0,E1.0 Taken to Jason B.
|
1st review completed | | | 11/15/2004 | | FAIL |
|
|
|
failed planning, ESC and Plan check.
|
Routing - FIRE | 11/10/2004 | | 11/15/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 11/9/2004 | | 11/10/2004 | | FAIL |
|
|
|
Need a zoning certificate or certificate of appropriatness for parking. Handicap ramp needs to be accessible. Currently have to go through existing parking spaces. I will contact Jim Murray with CSHQA regarding these concerns.
|
Plan resubmittals requested | | | 11/9/2004 | | |
|
|
|
Plan resubmittals and written response required for further review.
|
Routing - PLAN CHECK | 11/2/2004 | | 11/9/2004 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Plan resubmittals and written response are required for further review. Plans to route to Planning and then to the Fire Dept.
|
Routing - PLUMBING | 11/1/2004 | | 11/2/2004 | | PASS |
|
|
|
approved per plan, notes and 2003 UPC: change hub drains to floor sinks and install in full view or with half grates in full view.
|
Routing - Erosion and Sediment | 10/28/2004 | | 11/1/2004 | | FAIL |
|
|
|
RP listed on ESC is not certified, contacted PD.
|
Routing - PUBLIC WORKS | 10/27/2004 | | 10/28/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/26/2004 | | |
|
|
|
|
Application received | | | 10/25/2004 | | |
|
|
|
|