Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-02571
StatusFinaled
Name COREY BARTON HOMES
Site Address 2438 N HIGHWOOD AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
"THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a four bedroom, two and half bathroom 1934 sq. ft. two story single family dwelling (866 sq. ft. first floor/1068 sq. ft. second floor) with a attached 734 sq. ft. three car garage and a 84 sq. ft. covered front porch. Per approved plans and requirement list. PC#586 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  4/17/2007  
(F) Reprint permit  4/17/2007  
BLD-Final3/7/20053/7/20053/7/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/7/2005 at 7:13:40 AM. C/C issued. 3/7/2005 9:49:37 AM
DOC - Permit Finaled3/7/20053/7/20053/7/2005APASS
DetailsJim Sly
Finaled by inspector at 3/7/2005 9:49:43 AM
BLD-Final3/4/20053/4/20053/4/2005PNH
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/4/2005 at 7:17:16 AM. No access. 3/4/2005 4:15:13 PM
BLD-Energy code compliance1/31/20051/31/20051/31/2005PPASS
DetailsJim Sly
Todd; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in1/25/20051/28/20051/28/2005PFAIL
DetailsJim Sly
todd; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N posted. 1/28/2005 2:35:03 PM
BLD-Footing1/3/20051/3/20051/3/2005PPASS
DetailsJim Sly
tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Issue PAID IN FULL permit  12/29/2004 DONE
Permit Ready to Issue  11/9/2004  
Inspection Record Card- Bld  11/9/2004 DONE
Telephone call  11/9/2004 DONE
Left message for Michelle that permit is ready & fees///11/09/04 8:15am BAS
Routing - PLAN CHECK11/2/2004 11/8/2004 PASS
Plan assigned to (SAM)11/8/2004 11/8/2004 PASS
11/8/2004 15:31:57 SAM - activity updated through activity BLDA022 from case BLD04-02571.
Case Summary (BLD)  11/8/2004  
Plan Review Report  11/8/2004  
PLANS/APPL TAKEN TO FRONT DESK  11/8/2004 DONE
Routing - PUBLIC WORKS11/1/2004 11/1/2004 PASS
Routing - PLANNING11/1/2004 11/1/2004 PASS
O.K. per redlines at the direction of applicant. Driveway must be 50' away from intersection.
Routing - PLANNING10/29/2004 10/29/2004 FAIL
Driveway needs to be a minimum of 50' away from the intersection. Left message w/ applicant regarding issues.
Application received  10/29/2004