Case Summary (BLD) | | | 9/9/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Aging Inspection | 2/5/2008 | 2/5/2008 | 2/6/2008 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Expired | 2/6/2008 | 2/6/2008 | 2/6/2008 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Conference | 2/17/2005 | 2/18/2005 | 2/18/2005 | A | CANC |
Troy Cobbley
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 2/17/2005 | 2/18/2005 | 2/18/2005 | A | CANC |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Telephone call | | | 2/2/2005 | | DONE |
|
|
|
lft vm with john price ###-#### that his permit and fees are ready to be picked up
|
Issue PAID IN FULL permit | | | 2/2/2005 | | DONE |
|
|
|
|
Routing - PLANNING | 1/31/2005 | | 2/1/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/1/2005 | | 2/1/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/1/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/1/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/1/2005 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/3/2004 | | 2/1/2005 | | PASS |
|
|
|
2/1/2005 14:14:09 CJW - activity updated through activity BLDA022 from case BLD04-02583.
|
Routing - PLANNING | 1/26/2005 | | 1/31/2005 | | FAIL |
|
|
|
exterior landing does not reflect proposed exterior changes cited by property owner (Clat Carley) in phone conversion 1/26/05. Applicant is resubmitting plans.
|
Routing - PLAN CHECK | 1/31/2005 | | 1/31/2005 | | PASS |
|
|
|
Drawings approved.
|
Plan resubmittals received | | | 1/27/2005 | | DONE |
|
|
|
Received two copies of revised sheet A2.1. Routed to Carl Westfall. kmm
|
Telephone call | | | 1/26/2005 | | |
|
|
|
Called the architect. Left a message asking for a copy of the license agreement with ACHD to allow work in the public way.
|
Routing - PLAN CHECK | 12/1/2004 | | 1/26/2005 | | |
|
|
|
Sent to Planning to consider casement windows.
|
Plan resubmittals received | | | 1/25/2005 | | DONE |
|
|
|
Received Transmittal , 1 Letter,& 2 Copys of sheet A2.0 Taken to Carl W.
|
Telephone call | | | 1/24/2005 | | |
|
|
|
Called the architect. Told him that full sized resubmitted drawings are required. Also told him that a permit cannot be issued until the ventilation issue is resolved. The replacement of historic windows must be approved through Planning before the permit can be issued.
|
Plan resubmittals received | | | 1/24/2005 | | |
|
|
|
Received Transmittal, & 2 Copys of sheets A2.0, A2.1 Taken to Carl W.
|
Plan resubmittals received | | | 1/21/2005 | | DONE |
|
|
|
Received Transmittal & 2 sheets of revised entry door,landing,& stair on 6th st. Taken to Carl W.
|
Meeting | | | 12/17/2004 | | DONE |
|
|
|
Had a meeting with the tenant owner and the building owner. Talked about at least 4 ways that their stairway/door could be made to comply. Waiting to hear what they plan to do.
|
Telephone call | | | 12/8/2004 | | DONE |
|
|
|
Called the Architect. Left a message. The owner has no intention of doing what the resubmitted drawings show unless he has no other option. Waiting for call from the Architect before reviewing the resubmitted drawings.
|
Plan resubmittals received | | | 12/7/2004 | | DONE |
|
|
|
Received two copies of revised sheets A2.0, A2.1, two copies of structural calcs, one copy of response letter and one copy of letter from Bob Tikker. Routed to Carl W. kmm
|
Routing - FIRE | 11/26/2004 | | 12/1/2004 | | PASS |
|
|
|
|
1st review completed | | | 12/1/2004 | | FAIL |
|
|
|
failed plan check
|
Routing - PLAN CHECK | 11/8/2004 | | 11/26/2004 | | FAIL |
|
|
|
Failed 1st IBC plan review. IBC plan review started November 12, 2004 and finished November 26, 2004. The review time-frame was prolonged due to plans examiner being ill. Resubmitted drawings were required from the Architect. See the plan review report.
|
Routing - PUBLIC WORKS | 11/3/2004 | | 11/8/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 11/8/2004 | | 11/8/2004 | | PASS |
|
|
|
Per plans no work distrubing exterior, no plan or permit required. Keep all debris contained in dumpster and exterior street and sidewalk swept up.
|
Plans ACCEPTED BY PLAN TECH | | | 11/2/2004 | | DONE |
|
|
|
Plans not dimensioned. They are creating a new vacant tenant space adjacent to the new game room. kmm
|
Application received | | | 11/1/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/1/2004 | | |
|
|
|
|