BLD-Conference | 5/23/2006 | 5/24/2006 | 5/24/2006 | A | PASS |
Tony Young
|
|
|
verify for plumbing if final is done this should have all been passed before,, ok
|
DOC - Permit Finaled | 5/24/2006 | 5/24/2006 | 5/24/2006 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 6/6/2005 | 6/7/2005 | 6/8/2005 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 4:20:25 PM. Contact: ###-####.
|
BLD-Conference | 6/1/2005 | 6/2/2005 | 6/2/2005 | P | PASS |
Tony Young
|
|
|
please call 30 min prior to meet///chris; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa reciever coach,,, GO B S U !!!!!,,, CONF ON FINAL
|
BLD-Framing/Rough-in | 2/23/2005 | 2/24/2005 | 2/24/2005 | P | PASS |
Troy James
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 2/23/2005 | 2/24/2005 | 2/24/2005 | A | CANC |
Troy James
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 2/24/2005 | 2/24/2005 | 2/24/2005 | P | PASS |
Troy James
|
|
|
|
BLD-Framing/Rough-in | 2/21/2005 | 2/22/2005 | 2/22/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 12:16:10 PM. Contact: ###-####. c/n posted 2/22/2005 11:33:59 AM
|
BLD-Energy code compliance | 2/21/2005 | 2/22/2005 | 2/22/2005 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 12:16:47 PM. Contact: ###-####.
|
BLD-Foundation | 12/17/2004 | 12/20/2004 | 12/20/2004 | A | PASS |
Troy James
|
|
|
Gordon - late morning; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Footing | 12/17/2004 | 12/17/2004 | 12/17/2004 | P | PART |
Troy James
|
|
|
gordon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
wip setbacks ok rebar laying in forms 12/17/2004 1:20:17 PM
|
BLD-Grading Inspection | 12/16/2004 | 12/16/2004 | 12/16/2004 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
PubWorks Subgrade Approval | 11/9/2004 | 11/9/2004 | 12/16/2004 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling the footing inspection. Call Terry Records at ###-####.
|
Override - Activity Holds | | | 12/2/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/2/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 12/1/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 12/1/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 12/1/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/1/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/1/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/1/2004 | | DONE |
|
|
|
lft vm with chris lombardo ###-#### that fees and permit is ready to be picked up
|
Plan assigned to (DJO) | 11/30/2004 | 11/30/2004 | 11/30/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/30/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 11/30/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2004 | | DONE |
|
|
|
|
Pending Assignment by DJO | 11/8/2004 | | 11/30/2004 | | DONE |
|
|
|
11/30/2004 08:04:43 DJO - activity updated through activity BLDA169 from case BLD04-02654.
|
Plans ACCEPTED BY PLAN CHECK | | | 11/30/2004 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/10/2004 | | 11/12/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 11/12/2004 | | 11/12/2004 | | PASS |
|
|
|
No fire sprinklers are required (Highlands Hackberry #4 sub)
|
Routing - PLANNING | 11/10/2004 | | 11/10/2004 | | PASS |
|
|
|
O.K. per redlines. Arbor and associated columns not to be included. Driveway to be installed as redlined, which matches the grading plan.
|
Routing - PLANNING | 11/10/2004 | | 11/10/2004 | | FAIL |
|
|
|
Fail: Trellis and associated columns cannot encroach into the front setback. Left message w/ applicant at 11:50 a.m. on 11/10/04. CER
|
Routing - PUBLIC WORKS | 11/9/2004 | | 11/9/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 11/8/2004 | | 11/9/2004 | | PASS |
|
|
|
Approved as category 3
|
Application received | | | 11/8/2004 | | |
|
|
|
|
BLD-Grading Inspection | 6/7/2005 | 6/7/2005 | | | |
|
|
|
Final grading and drainage approved. However when the storm drain connection was checked it took nearly 35 minutes for the water to make it to the street storm drain. Advised Chris Lombardo that this indicates there may be a problem
|
Routing - PLAN CHECK | 11/15/2004 | | | | |
|
|
|
|