Case Summary (BLD) | | | 6/16/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/16/2011 | | DONE |
|
|
|
|
Third Notice BLD | 5/20/2005 | 5/20/2005 | 10/31/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/14/2005 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/14/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10529 issued 4-14-05 to the Federal Defender's Ofc.
|
FIRE-Final Inspection | 4/13/2005 | 4/13/2005 | 4/13/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety passed inspection.
|
FIRE-Final Inspection | 4/12/2005 | 4/13/2005 | 4/13/2005 | A | FAIL |
Forrest France
|
|
|
Fire extinguisher needs current inspection tag.
|
BLD-Final | 4/12/2005 | 4/13/2005 | 4/13/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/11/2005 at 3:45:48 PM. Contact: ###-####.ok for perm occ 4/13/2005 1:57:54 PM
|
Permanent Occupancy | | 4/13/2005 | 4/13/2005 | | DONE |
|
|
|
|
BLD-Final | 4/11/2005 | 4/12/2005 | 4/12/2005 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/11/2005 at 3:45:48 PM. Contact: ###-####.
|
FIRE-Final Inspection | 3/24/2005 | 3/25/2005 | 3/25/2005 | A | FAIL |
Troy Cobbley
|
|
|
dave; Phone #: ###-#### The emergency light at the north side of the elevator lobby has not been installed yet. 3/25/2005 10:44:26 AM
|
BLD-Final | 3/14/2005 | 3/14/2005 | 3/14/2005 | P | NR |
Dave Hannah
|
|
|
dave- ###-####
|
FIRE-Final Inspection | 3/14/2005 | 3/14/2005 | 3/14/2005 | P | FAIL |
Troy Cobbley
|
|
|
dave ###-#### Provide fire extinguisher per review comment #4, Provide additional exit signs as per drawing sheet #A2.3 and provide emergency lighting in north side of elevator lobby and in both exit corridors. 3/14/2005 2:19:27 PM
|
BLD-Framing/Rough-in | 2/21/2005 | 2/22/2005 | 2/22/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 1:07:00 PM. Contact: ###-####. ph 2 int walls ok to cover 2/22/2005 11:00:02 AM
|
BLD-Conference | 1/20/2005 | 1/21/2005 | 1/21/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/20/2005 at 2:07:22 PM. Contact: ###-####. went over 1hr ceiling sytem 1/21/2005 1:17:08 PM
|
BLD-Conference | 1/21/2005 | 1/21/2005 | 1/21/2005 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/20/2005 at 2:07:22 PM. Contact: ###-####.
|
BLD-Conference | 12/29/2004 | 12/30/2004 | 12/30/2004 | A | DONE |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles talked with carel westfall about arcetect using a one hr suspended ceiling system in tenent space his ok with that met with contractor he will get instulation instructions and install 12/30/2004 10:12:23 AM
|
BLD-Framing/Rough-in | 12/23/2004 | 12/27/2004 | 12/27/2004 | P | PART |
Dave Hannah
|
|
|
needs to ext walls to under side of 4th floor along corrodor 12/27/2004 2:48:58 PM
|
BLD-Framing/Rough-in | 12/23/2004 | 12/23/2004 | 12/23/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/23/2004 at 8:34:59 AM. Contact: ###-####. ok to cover int walls but need to rework 1 hr corrodor walls 12/23/2004 7:35:05 PM
|
Issue PAID IN FULL permit | | | 12/14/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 12/10/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/10/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/10/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/10/2004 | | DONE |
|
|
|
left mess for john price at ###-#### that permit is ready-& doug storey at ###-#### that permit is ready
|
Plan assigned to (CJW) | 11/17/2004 | | 12/9/2004 | | PASS |
|
|
|
12/9/2004 14:24:42 CJW - activity updated through activity BLDA022 from case BLD04-02708.
|
Routing - FIRE | 12/2/2004 | | 12/9/2004 | | PASS |
|
|
|
|
1st review completed | | | 12/9/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/9/2004 | | 12/9/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/9/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/17/2004 | | 12/2/2004 | | PASS |
|
|
|
The IBC plan review was started December 1, 2004 and was finished the next day. The drawings were approved with clarifications. See the plan review report.
|
Application received | | | 11/16/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/16/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/16/2004 | | DONE |
|
|
|
|
Fee Review-notes | 11/16/2004 | 11/16/2004 | | | |
|
|
|
|