Third Notice BLD | 3/5/2008 | 3/5/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 2/6/2008 | 2/6/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 1/14/2008 | 1/14/2008 | 2/6/2008 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/14/2008 | 1/14/2008 | 1/14/2008 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 1/14/2008 | 1/14/2008 | 1/14/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/12/2007 | 11/12/2007 | 11/13/2007 | | CANC |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/11/2007 | 9/11/2007 | 9/11/2007 | | DONE |
Tom Arcoraci
|
|
|
on temp
|
BLD-Aging Inspection | 7/12/2007 | 7/12/2007 | 7/12/2007 | | DONE |
Tom Arcoraci
|
|
|
on temp
|
BLD-Aging Inspection | 5/7/2007 | 5/7/2007 | 5/7/2007 | | PASS |
Tom Arcoraci
|
|
|
on temp
|
BLD-Aging Inspection | 3/6/2007 | 3/6/2007 | 3/7/2007 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/3/2007 | 1/3/2007 | 1/3/2007 | | PASS |
Tom Arcoraci
|
|
|
on temp
|
BLD-Aging Inspection | 10/23/2006 | 10/23/2006 | 10/23/2006 | | PASS |
Tom Arcoraci
|
|
|
|
Override - Activity Holds | | | 8/24/2006 | | |
|
|
|
|
Code Occupancy Approval | | | 8/24/2006 | | PASS |
Wm. Michael Meloy
|
|
|
Inspection on 8/23/2006, at 15:45, found compliance with Planner Josh Logan's approved plans dated 8/22/2006
|
Permanent Occupancy | | 8/23/2006 | 8/23/2006 | | DONE |
|
|
|
|
Permanent Occupancy | | 8/23/2006 | 8/23/2006 | | DONE |
|
|
|
|
Code Occupancy Approval | 8/22/2006 | 8/22/2006 | 8/22/2006 | P | CANC |
Dena Gambrel
|
|
|
|
Code Occupancy Approval | 8/22/2006 | 8/22/2006 | 8/22/2006 | A | FAIL |
Dena Gambrel
|
|
|
08-22-06 Site inspection shows that the landscaping is not per the plan modification. Correction notice given and reinspection fee needs to be paid before inspection.
|
COD-Stop Work/Reinspection DR | 8/22/2006 | 8/22/2006 | 8/22/2006 | P | FAIL |
Dena Gambrel
|
|
|
08-22-06 Landscape not to plans
|
Code Occupancy Approval Temp | 7/24/2006 | 7/24/2006 | 7/24/2006 | A | PASS |
Dena Gambrel
|
|
|
07-24-06 Temp Occupancy Approval signed. Modification of Lanscape plan has been turned into City for approval.
|
Temporary occupancy | | | 7/24/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5419 issued 7-24-06 to the Eagleson Apts.
|
BLD-Final | 7/20/2006 | 7/20/2006 | 7/20/2006 | P | PASS |
Tom Arcoraci
|
|
|
rob ok pending cod
|
BLD-Final | 7/19/2006 | 7/20/2006 | 7/20/2006 | A | NR |
Tom Arcoraci
|
|
|
rob ###-####
|
Code Occupancy Approval | 7/20/2006 | 7/20/2006 | 7/20/2006 | A | FAIL |
Dena Gambrel
|
|
|
07-20-06 No gate on trash enclosure, curbing not completed, landscape plants used and placement of plants are not what was approved per plans. Rob stated that they replaced plants that would be more drought resistant. I told him that he needed to either make the landscape like the plans or obtain a modification to the landscape design.
|
FIRE-Final Inspection | 7/18/2006 | 7/19/2006 | 7/19/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 7/14/2006 | 7/17/2006 | 7/17/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans and notes. Also the fire extinguishers are mounted too high, the doors require spring hinges and smoke detectors are required in the first floor egress corridor from the bedrooms. This was only a partial inspection since there were no plans.
|
Print Occupancy Form | | | 7/17/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/17/2006 | | DONE |
|
|
|
|
BLD-Final | 7/13/2006 | 7/14/2006 | 7/14/2006 | P | NR |
Mike Jordan
|
|
|
rob ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Needs code enforcement, public works and life/safety finals.
|
BLD-Conference | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | NH |
Jim Sly
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Called rob .......Left message No one on site...re-call for PM.
|
BLD-Aging Inspection | 3/27/2006 | 3/27/2006 | 3/27/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 1/23/2006 | 1/24/2006 | 1/24/2006 | A | PASS |
Tom Arcoraci
|
|
|
Rob -- framing to cover -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 1/20/2006 | 1/23/2006 | 1/23/2006 | A | PART |
Tom Arcoraci
|
|
|
Rob -- for a cover; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong upper floor fire stop ok for cover
|
BLD-Wall cover | 1/19/2006 | 1/20/2006 | 1/20/2006 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/19/2006 at 5:32:47 PM. Contact: ###-####. C/N Provide 1hr listing for all ABS
|
BLD-Framing/Rough-in | 1/17/2006 | 1/18/2006 | 1/18/2006 | P | PASS |
Tom Arcoraci
|
|
|
robert --ok to cover ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Conference | 12/13/2005 | 12/13/2005 | 12/13/2005 | P | PASS |
Tom Arcoraci
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover ext
|
BLD-Conference | 12/6/2005 | 12/7/2005 | 12/7/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/6/2005 at 12:14:56 PM. Contact: ###-####.
|
BLD-Aging Inspection | 10/21/2005 | 10/21/2005 | 10/21/2005 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 8/17/2005 | 8/17/2005 | 8/17/2005 | P | PASS |
Tom Arcoraci
|
|
|
stem wall inspection//logan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 8/15/2005 | 8/16/2005 | 8/16/2005 | P | PASS |
Tom Arcoraci
|
|
|
logan ###-####
|
BLD-Footing | 8/15/2005 | 8/15/2005 | 8/15/2005 | P | CANC |
Tom Arcoraci
|
|
|
logan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Aging Inspection | 7/29/2005 | 7/29/2005 | 7/29/2005 | | NR |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 4/29/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2005 | | DONE |
|
|
|
called talked to Mark Sanders permit is ready, he said in process of getting money. Told him expires 5/18/05. 4/20/05 2:44pm
|
Inspection Record Card- Bld | | | 3/8/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/8/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/8/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2005 | | DONE |
|
|
|
lft vm with doug that permit and fees are ready to be picked up and fee
|
Plan assigned to (M_P) | 11/19/2004 | 11/19/2004 | 3/7/2005 | | PASS |
|
|
|
3/7/2005 09:41:20 M_P - activity updated through activity BLDA022 from case BLD04-02740.
|
Routing - PLAN CHECK | 3/4/2005 | | 3/7/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2005 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/7/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/7/2005 | | DONE |
|
|
|
|
Routing - PLUMBING | 2/25/2005 | | 3/4/2005 | | PASS |
|
|
|
Provide heat if dcva in storage room.
|
Routing - PLAN CHECK | 2/3/2005 | | 2/25/2005 | | |
|
|
|
Routing to Plumbing.
|
Plan resubmittals received | | | 2/24/2005 | | DONE |
|
|
|
Received Transmittal & 2 Copys of sheets P1.0,P2.0 Taken to Mike P.
|
Routing - FIRE | 1/28/2005 | | 2/3/2005 | | PASS |
|
|
|
resubmittal acceptable
|
Routing - PLAN CHECK | 12/29/2004 | | 1/28/2005 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Routing - PLAN CHECK | 1/28/2005 | | 1/28/2005 | | |
|
|
|
Routing to fire.
|
Plan resubmittals received | | | 1/28/2005 | | DONE |
|
|
|
Received fire flow information.
|
Plan resubmittals received | | | 1/20/2005 | | DONE |
|
|
|
Received one copy of response letter, one copy of calculations and two copies of revised sheets A0.0, A1.0, A2.0, A3.0, A4.1, A4.2, A4.3, A5.1, A8.0, A9.0, A10.0. Routed to Mike P. kmm
|
Routing - PLUMBING | 12/28/2004 | | 12/29/2004 | | FAIL |
|
|
|
see bld04-02740 for review comments.
|
Routing - PLAN CHECK | 12/23/2004 | | 12/28/2004 | | |
|
|
|
Routing to Plumbing.
|
1st review completed | | | 12/23/2004 | | FAIL |
|
|
|
failed plumbing, planning, plan check and fire.
|
Routing - PLAN CHECK | 12/23/2004 | | 12/23/2004 | | |
|
|
|
Routing to planning.
|
Routing - FIRE | 12/20/2004 | | 12/23/2004 | | FAIL |
|
|
|
lacks hydrant flow. Faxed review to architect.
|
Routing - PLANNING | 12/23/2004 | | 12/23/2004 | | PASS |
|
|
|
Sarah Schafer Approved per DRH03-00226 and per CUp03-00108. Carl Miller signed off on the plans for Susan Riggs per the conditions in the CUP file.
|
Case Summary (BLD) | | | 12/20/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 12/3/2004 | | 12/20/2004 | | FAIL |
|
|
|
Plan review complete, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Plan resubmittals received | | | 12/3/2004 | | DONE |
|
|
|
Received transmittal letter with two sets of sheets P1.0,P2.0 taken to Mike P.
|
Routing - PLANNING | 11/30/2004 | | 12/3/2004 | | FAIL |
|
|
|
Sara S. DRH03-00226
Cross access/egress agreement has not been sent over. I contacted the applicant on 12/1/04 and have not heard back from them so I am forwarding the plans on.
Susan R. CUP03-00108
SMS- I have checked the plans per Susan's requirements as well.
|
Routing - PLUMBING | 11/29/2004 | | 11/30/2004 | | FAIL |
|
|
|
fixture schedule- P-9 is too small, size water system oer UPC, united water no longer accepts premise protection outside in a vault, show new location on plans.
|
Routing - Erosion and Sediment | 11/29/2004 | | 11/29/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 11/22/2004 | | 11/29/2004 | | PASS |
|
|
|
.
|
Routing - PLANNING Land Div | 11/19/2004 | | 11/22/2004 | | PASS |
|
|
|
Parcel approved as division of one-time lot split of Lot 1, Block 2 of Country Club No. 1 Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 11/19/2004 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 11/19/2004 | | |
|
|
|
|
(F) Reprint permit | | | 11/19/2004 | | DONE |
|
|
|
|
Application received | | | 11/18/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/18/2004 | | |
|
|
|
|
Fee Review-notes | 11/18/2004 | 11/18/2004 | | | |
|
|
|
|