BLD-Energy code compliance | 4/8/2005 | 4/11/2005 | 4/11/2005 | A | PASS |
Troy James
|
|
|
or 5618///bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 3/28/2005 | 3/29/2005 | 3/29/2005 | P | PART |
Dave Hannah
|
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate still need truss fix 3/29/2005 1:56:15 PM
|
BLD-Framing/Rough-in | 3/17/2005 | 3/18/2005 | 3/18/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/17/2005 at 4:19:43 PM. Contact: ###-####. framing ok all but for two trusses under back porch are short of wall need truss engineer to provide fix ok to insulate after seal package is installed and inspected 3/18/2005 1:56:22 PM
|
BLD-Foundation | 12/22/2004 | 12/22/2004 | 12/22/2004 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/22/2004 at 7:19:47 AM. Contact: ###-####. Need retaining wall at existing footing where footing has been undermined 12/22/2004 10:37:05 AM
|
BLD-Footing | 12/20/2004 | 12/20/2004 | 12/20/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 11:01:34 AM. Contact: ###-####.
footings and piers only ok 12/20/2004 3:06:23 PM
|
BLD-Grading Inspection | 12/16/2004 | 12/16/2004 | 12/16/2004 | | DONE |
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|
PubWorks Subgrade Approval | 11/29/2004 | 11/29/2004 | 12/16/2004 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to calling for a footing inspection. Call Terry
Records at ###-####
|
Plan assigned to (PEP) | 11/26/2004 | 11/26/2004 | 12/6/2004 | | PASS |
|
|
|
12/6/2004 14:49:43 PEP - activity updated through activity BLDA022 from case BLD04-02783.
|
Routing - Erosion and Sediment | 12/6/2004 | | 12/6/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/6/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/6/2004 | | |
|
|
|
|
Plan Review Report | | | 12/6/2004 | | |
|
|
|
|
Override - Activity Holds | | | 12/6/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/6/2004 | | |
|
|
|
|
Override - Activity Holds | | | 12/6/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/6/2004 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 11/26/2004 | | 11/29/2004 | | PASS |
|
|
|
Footing subgrade must be approved by the geotechnical engineer prior to calling for a footing inspection. No grading proposed so no final grding inspection is required.
|
Routing - PLANNING | 11/29/2004 | | 11/29/2004 | | PASS |
|
|
|
Floor plans only indicated a portion of the existing home. Approval is for the addition of living space to an existing single family home with one kitchen.
|
Routing - Erosion and Sediment | 11/29/2004 | | 11/29/2004 | | FAIL |
|
|
|
Need ESC plan, informed contractor.
|
Application received | | | 11/26/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 12/6/2004 | | | | |
|
|
|
Perry Paine
|