Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD04-02808
StatusFinaled
Name PATERSON APARTMENTS
Site Address 510 N 12TH ST
Project NamePaterson Apartments
Customer Number 
ePlanReviewNo
Description
Paterson Apartments * Repair fire and smoke damage in units 13, 14, 15, 16, roof damage to units 11 & 12. Repair water damage in units 7, 8, 9,10,11,12, 17. Misc. clean up and smoke damage repair to units 1, 2, 3 & 4. All construction per the approved set of plans and the attached insurance company's scope of work. Valuation $ 263,912.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Occupancy Form  9/27/2006 DONE
Letter of compliance  9/27/2006 DONE
Letter of Compliance issued 9-27-06.
BLD-Final9/22/20069/26/20069/26/2006APASS
DetailsMike Jordan
sherry - ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Handrails have been repaired. final ok.
FIRE-Final Inspection9/22/20069/25/20069/25/2006PPASS
DetailsForrest France
Corrections have been verified for completion, PFE's are provided as required, permit finaled.
BLD-Final9/22/20069/22/20069/22/2006PCANC
DetailsJim Storey
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Aging Inspection9/6/20069/6/20069/7/2006 PASS
DetailsTony Young
BLD-Final7/5/20067/6/20067/6/2006AFAIL
DetailsDave Hannah
JIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs to fix hand rails
FIRE-Final Inspection6/27/20066/28/20066/28/2006APART
DetailsForrest France
Inspected units 9-17, smoke alarms are okay, need to provide portable fire extinguishers per requirements of IFC 2003 906.1 and per review comment #10.
BLD-Final6/27/20066/28/20066/28/2006ANR
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs elec and fire life saftey finals
BLD-Aging Inspection4/24/20064/24/20064/28/2006 PASS
DetailsTony Young
BLD-Aging Inspection2/20/20062/20/20062/22/2006 PASS
DetailsTony Young
FIRE-Final Inspection12/19/200512/19/200512/19/2005PPART
DetailsForrest France
Inspected apts. 512 and 510 1st and 2nd floors, fire ext. are okay, smoke detectors at two locations on the 2nd floor apt. 510 are below 12" from the ceiling on the wall, relocate as discussed.
BLD-Framing/Rough-in10/7/200510/10/200510/10/2005APASS
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
ok to cover all units
BLD-Energy code compliance10/3/200510/3/200510/3/2005PFAIL
DetailsMike Jordan
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. No comm. check on site. No insulation has been installrd at this time. Reviewed approved plans and requirements with contractor. Also needs to complete airseal package.
BLD-Framing/Rough-in10/3/200510/3/200510/3/2005PPART
DetailsMike Jordan
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Framing ok. Reamainder of fireblocking has been installed.
BLD-Framing/Rough-in9/27/20059/27/20059/27/2005PPART
DetailsTony Young
jim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
frame issues resolved on units13, 14, 15, 16,, ok to insulate
BLD-Framing/Rough-in9/26/20059/27/20059/27/2005ACANC
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
out of time,,, re-scheduled
BLD-Framing/Rough-in9/26/20059/26/20059/26/2005PNH
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
property is locked up,,, called contractor,,
BLD-Framing/Rough-in9/12/20059/12/20059/12/2005PFAIL
DetailsJim Storey
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c/n engineer to justify load path of plm wall and floor joist in bathroom/ roof diaphram not per plan instalation is at ceilling joist. justify design.
BLD-Wall cover9/8/20059/8/20059/8/2005PFAIL
DetailsMike Jordan
jim///apts 13,14,15,16 only; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Need to complete nailing on simpson hangars. Complete fire blocking between units. engineer review required on holdowns at 2nd floor. Need to verify microlam ledger at roof and connection method.
BLD-Conference2/10/20052/11/20052/11/2005PFAIL
DetailsTroy James
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need engineer report of damaged lumber to be removed. 2/11/2005 2:54:54 PM
Issue PAID IN FULL permit  1/26/2005  
Inspection Record Card- Bld  1/3/2005  
Permit Ready to Issue  1/3/2005 DONE
Telephone call  1/3/2005 DONE
left mess with john price at ###-#### that permit is ready
PLANS/APPL TAKEN TO FRONT DESK  12/30/2004 DONE
Print Pending Permit.LaserJet4  12/30/2004 DONE
Case Summary (BLD)  12/30/2004 DONE
Routing - PLAN CHECK12/16/2004 12/30/2004 PASS
Plan assigned to (M_P)12/2/2004 12/30/2004 PASS
12/30/2004 13:08:22 M_P - activity updated through activity BLDA022 from case BLD04-02808.
Plan resubmittals received  12/17/2004 DONE
Received letter of transmittal with two copies of sheets A2.0,A2.3 Taken to Mike P.
1st review completed  12/16/2004 FAIL
failed plan check
Routing - FIRE12/13/2004 12/16/2004 PASS
approved with conditions; review faxed to architect.
Routing - PLAN CHECK12/9/2004 12/13/2004 FAIL
Plan review completed called architect to request additional information about bearing wall to the foundation, roof framing details, walls separating dwelling units, fire stopping in attic areas, repairing and replacing paraper wall on north side. basement unit egress requirements.
Case Summary (BLD)  12/13/2004  
Routing - PLANNING12/6/2004 12/9/2004 PASS
Tempra Wilson - Approved - SMS
Routing - PLAN CHECK12/2/2004 12/6/2004  
Routing to planning
Plans ACCEPTED BY PLAN TECH  12/2/2004 DONE
Plan routing begun/TENANTS  12/2/2004 DONE
Application received  12/1/2004  
Recd Pcfee & Taken To Pln CK  12/1/2004  
Fee Review-notes12/1/200412/1/2004