Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-02809
StatusFinaled
Name WHITE PINE TRAVEL MART (CONCOURSE B)
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(WHITE PINES TRAVEL MART - BOISE AIR TERMINAL - ORIGINAL CONCOURSE B) This building is fire sprinklered to substitute for 1-hr fire-resistance rated construction. To combine two existing tenant spaces into one 1,280 square foot retail sales tenant space. This tenant space is located in "Original Concourse B". Work is to include interior nonbearing walls, a suspended ceiling, a gypsum board soffit, horizontal sliding security grilles, millwork, and finishes all per the approved drawings and the plan review report on file. The fire sprinkler system shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/20/200512/14/2005 DONE
singed off 2004 permit per Jenifer & Rita
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice 3/16/20054/26/2005 DONE
Permanent occupancy  3/16/2005  
Perm. Occ. Cert. E 10478 issued 3-16-05 to White Pine Travel Mart in Concourse B of the airport.
FIRE-Final Inspection3/15/20053/15/20053/15/2005PPASS
DetailsTroy Cobbley
Fire life safety finaled
Permanent Occupancy 3/15/20053/15/2005 DONE
Details
FIRE-Final Inspection3/10/20053/10/20053/10/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given with Renn Ross's permission. Fire alarm has been pretested and just needs to be witnessed by the fire inspector. Fire life safety is ok to final when the fire alarm is approved.
FIRE-Final Inspection3/8/20053/8/20053/8/2005PFAIL
DetailsTroy Cobbley
rod; Phone #: ###-#### Life safety will be ok to final when alarms and fire sprinkler permits are finaled. 3/8/2005 4:41:02 PM
BLD-Final3/8/20053/8/20053/8/2005PPART
DetailsJim Storey
rod; Phone #: ###-#### Internet Inspection Request from: Barbara Moore final ok pending others. 3/8/2005 4:00:10 PM
FIRE-Conference3/7/20053/7/20053/7/2005PDONE
DetailsTroy Cobbley
Contractor wanted to go over notes and show me the status/location of the project 3/7/2005 1:56:31 PM
BLD-Framing/Rough-in2/1/20052/1/20052/2/2005PPASS
DetailsJim Storey
grid inspection please///rod; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok
BLD-Framing/Rough-in1/20/20051/21/20051/21/2005APASS
DetailsJim Storey
rod; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue & PRINT permit  12/28/2004 DONE
(F) Reprint permit  12/28/2004 DONE
Inspection Record Card- Bld  12/22/2004  
Inspection Record Card- Bld  12/22/2004 DONE
Print Occupancy Form  12/22/2004 DONE
Permit Ready to Issue  12/22/2004  
Telephone call  12/22/2004  
left mess for jim alexander at ###-#### permit is ready
PLANS/APPL TAKEN TO FRONT DESK  12/21/2004 DONE
Plan assigned to (CJW)12/7/2004 12/21/2004 PASS
12/21/2004 16:17:47 CJW - activity updated through activity BLDA022 from case BLD04-02809.
Routing - FIRE12/17/2004 12/21/2004 PASS
1st review completed  12/21/2004 PASS
Routing - PLAN CHECK12/9/2004 12/17/2004 PASS
The IBC plan review was started on December 16, 2004 and was finished the next day. The drawings were approved with clarifications. See the plan review report.
Routing - PUBLIC WORKS12/7/2004 12/9/2004 PASS
Pending Assignment by MYS12/2/2004 12/7/2004 DONE
12/7/2004 10:11:51 MYS - activity updated through activity BLDA172 from case BLD04-02809.
Plans ACCEPTED BY PLAN TECH  12/2/2004 DONE
Application received  12/1/2004  
Recd Pcfee & Taken To Pln CK  12/1/2004 DONE
Fee Review-notes12/1/200412/1/2004   
Routing - PLAN CHECK12/21/2004