Case Summary (BLD) | | | 4/9/2012 | | |
|
|
|
|
Case Summary (BLD) | | | 9/23/2010 | | |
|
|
|
|
(F) Reprint permit | | | 12/5/2008 | | DONE |
|
|
|
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | 1/31/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 9/25/2006 | 9/25/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/11/2006 | 9/25/2006 | | DONE |
|
|
|
|
BLD-Final | 8/8/2006 | 8/11/2006 | 8/11/2006 | A | PASS |
Tom Arcoraci
|
|
|
shawn Note: please call 1/2 hr prior; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for occ
|
Permanent occupancy | | | 8/11/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11170 issued 8-11-06 to the Early Learning Center daycare.
|
FIRE-Final Inspection | 8/9/2006 | 8/10/2006 | 8/10/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 8/8/2006 | 8/9/2006 | 8/9/2006 | P | FAIL |
Troy Cobbley
|
|
|
Need fire alarm permit finaled then life safety can be finaled.
|
PubWorks Occupancy Approval | 8/7/2006 | 8/7/2006 | 8/7/2006 | | DONE |
|
|
|
|
Code Occupancy Approval | 7/28/2006 | 7/28/2006 | 7/28/2006 | P | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF
|
FIRE-Final Inspection | 7/27/2006 | 7/28/2006 | 7/28/2006 | A | FAIL |
Forrest France
|
|
|
The project related fire alarm permit must be inspected, approved and finaled prior to BLD life safety final, need to provide building street address numbers per review note #7, repair exit signs at two locations, install knox box. Noted three defficiencies to GC related to FA while on site.
|
Permanent Occupancy | | 7/28/2006 | 7/28/2006 | | DONE |
|
|
|
|
BLD-Aging Inspection | 7/24/2006 | 7/24/2006 | 7/24/2006 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Other | 5/24/2006 | 5/24/2006 | 5/24/2006 | P | PASS |
Dave Hannah
|
|
|
shaun Note: stairs; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 5/19/2006 | 5/22/2006 | 5/23/2006 | P | PASS |
Dave Hannah
|
|
|
shawn Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 4/11/2006 | 4/11/2006 | 4/11/2006 | P | PASS |
Jim Sly
|
|
|
Sean -- footing and foundation; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Footing | 4/11/2006 | 4/11/2006 | 4/11/2006 | P | PASS |
Jim Sly
|
|
|
Sean -- footing and foundation; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Previously passed by Tom A.
|
BLD-Footing | 4/4/2006 | 4/5/2006 | 4/5/2006 | P | PASS |
Tom Arcoraci
|
|
|
Shawn; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Footing | 4/4/2006 | 4/5/2006 | 4/4/2006 | A | CANC |
Tom Arcoraci
|
|
|
Shawn -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong /// Cancel and reschedule for 4-5 PM 4-4-06 eus
|
BLD-Aging Inspection | 3/22/2006 | 3/22/2006 | 3/22/2006 | | PASS |
Tom Arcoraci
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/21/2006 | | DONE |
|
|
|
changed to issued status-previoulsy issued
|
(F) Reprint permit | | | 3/21/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/20/2006 | | DONE |
|
|
|
called ###-#### and left message for Don w/Margie that permit is ready and fee
|
Plan resubmittals received | | | 3/16/2006 | | DONE |
|
|
|
two copies of sheet A5.0 proccessed by MLO
|
Routing - PLAN CHECK | 3/15/2006 | | 3/16/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/16/2006 | | |
|
|
|
|
Plan assigned to (MLO) | 1/24/2006 | | 3/16/2006 | | PASS |
|
|
|
3/16/2006 13:50:13 MLO - activity updated through activity BLDA022 from case BLD04-02856.
|
Plan resubmittals received | | | 3/15/2006 | | |
|
|
|
Received 1 copy of cover transmittal, 2 copies of the following sheets- A0.0, C-1, C-2, C-3, A1.0, A2.0, A3.0, A4.0, L1.0, L1.1, L1.2 which are for the plan mod. Taken to Mike Otto
|
Routing - PLAN CHECK | 1/27/2006 | | 1/31/2006 | | FAIL |
|
|
|
corrections sent to architect. MLO
|
Plan resubmittals requested | | | 1/31/2006 | | DONE |
|
|
|
IBC corrections
|
CHANGE STATUS TO (REV) | | | 1/24/2006 | | |
|
|
|
changed back to review thought permit was expired ( it was not )
|
Plan Modification Accepted | | | 1/24/2006 | | |
|
|
|
|
CHANGE STATUS TO (REV) | | | 1/19/2006 | | DONE |
|
|
|
plan mod. submitted
|
Issue PAID IN FULL permit | | | 10/26/2005 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 6/6/2005 | | DONE |
|
|
|
per mike otto approved per jenifer gilliand to extend for 180 days will expire on 12/6/2005/mls
|
Telephone call | | | 5/18/2005 | | DONE |
|
|
|
called and left message for don permit is ready and fees and will expire next month.
|
Telephone call | | | 4/21/2005 | | DONE |
|
|
|
talked to margie at ###-#### told her the permit expires on 6/7/05
|
Telephone call | | | 4/20/2005 | | |
|
|
|
called and left message for Dan with Margie permit is ready 4/20/05 3:30pm
|
Inspection Record Card- Bld | | | 1/7/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/7/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/7/2005 | | DONE |
|
|
|
|
1st review completed | | | 1/6/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/6/2005 | | 1/6/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2005 | | DONE |
|
|
|
|
Routing - FIRE | 12/30/2004 | | 1/6/2005 | | PASS |
|
|
|
|
Plan assigned to (MLO) | 12/7/2004 | | 1/6/2005 | | PASS |
|
|
|
1/6/2005 11:41:34 MLO - activity updated through activity BLDA022 from case BLD04-02856.
|
Routing - PLAN CHECK | 12/30/2004 | | 12/30/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 12/30/2004 | | 12/30/2004 | | PASS |
|
|
|
Parcel is two lots that have been combined into one by warranty deed 101164070 recorded on 12/28/04.
|
Routing - PLUMBING | 12/20/2004 | | 12/28/2004 | | PASS |
|
|
|
provide mixing valve for public lavs, if an automatic soap dispensor is installed at the mop sink provide a water supply for it.
|
Routing - PLANNING | 12/16/2004 | | 12/20/2004 | | PASS |
|
|
|
DRH04-00175 Mod #1 MGS
CUP04-00081 Mod #1 Carl Miller
Applicant will need to comply with 5' landscape setback to east property line (current plans show 4.5')
|
Routing - Erosion and Sediment | 12/20/2004 | | 12/20/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 12/10/2004 | | 12/16/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 12/7/2004 | | 12/10/2004 | | FAIL |
|
|
|
Two lots that need to be combined with a metes and bounds description which must be recorded on a new deed. Called Russ Holloway of Hutchinson Smith at ###-#### on December 10, 2004
|
Plan routing begun/NEW & ADDTN | | | 12/7/2004 | | DONE |
|
|
|
|
Application received | | | 12/7/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/7/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/7/2004 | | DONE |
|
|
|
|