Case Summary (BLD) | | | 4/7/2016 | | DONE |
|
|
|
|
Letter of compliance | | | 6/29/2007 | | DONE |
|
|
|
Letter of Compliance issued 6-29-07
|
BLD-Final | 2/2/2007 | 2/5/2007 | 2/5/2007 | P | NR |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs other trades finaled
|
FIRE-Final Inspection | 2/2/2007 | 2/5/2007 | 2/5/2007 | A | PART |
Forrest France
|
|
|
Final fire life safety pending completion of correction notice items for the permit attatched fire alarm and sprinkler permits, see c/n dated 2/2/07.
|
Inspection Record Card- Bld | | | 3/2/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/2/2006 | | DONE |
|
|
|
|
BLD-Other | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | DONE |
Dave Hannah
|
|
|
Dave: Please call Dennis -###-#### for garage walk-though and hotel fire proofing detail (small) discussion. Internet Inspection Request from: Alex Monge
|
BLD-Conference | 2/1/2006 | 2/2/2006 | 2/2/2006 | A | PASS |
Dave Hannah
|
|
|
Bulding 8 conference...call dennis. Internet Inspection Request from: Alex Monge
|
BLD-Other | 1/20/2006 | 1/20/2006 | 1/23/2006 | P | PASS |
Dave Hannah
|
|
|
Contact Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
|
BLD-Conference | 1/13/2006 | 1/16/2006 | 1/17/2006 | P | DONE |
Dave Hannah
|
|
|
Dennis Harter Request; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Conference | 1/10/2006 | 1/11/2006 | 1/12/2006 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Other | 1/9/2006 | 1/10/2006 | 1/11/2006 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Framing/Rough-in | 12/19/2005 | 12/20/2005 | 12/21/2005 | A | PART |
Dave Hannah
|
|
|
Lombac Requested Framing Inspection; Phone #: ###-#### Internet Inspection Request from: Alex Monge walked garage area every thing looking good
|
BLD-Framing/Rough-in | 12/8/2005 | 12/8/2005 | 12/8/2005 | P | PART |
Dave Hannah
|
|
|
Please call John with Lombac; Phone #: ###-#### Internet Inspection Request from: Ben Kos
|
BLD-Framing/Rough-in | 12/7/2005 | 12/8/2005 | 12/8/2005 | A | PART |
Dave Hannah
|
|
|
Please call John with Lombac; Phone #: ###-#### Internet Inspection Request from: Ben Kos shafts stair towers walls ground floor to third floor looking good to this point
|
BLD-Framing/Rough-in | 11/11/2005 | 11/15/2005 | 11/16/2005 | A | PART |
Dave Hannah
|
|
|
John Woods w/Lombac; Phone #: ###-#### Internet Inspection Request from: Alex tenent seperation between garage gruond floor ok for second layer
|
BLD-Framing/Rough-in | 10/21/2005 | 10/24/2005 | 10/24/2005 | A | PART |
Dave Hannah
|
|
|
John Woods is contact number provided; Phone #: ###-#### Internet Inspection Request from: Alex Monge walked stairs for garage ok to proceed
|
BLD-Framing/Rough-in | 10/12/2005 | 10/12/2005 | 10/13/2005 | P | PART |
Dave Hannah
|
|
|
Building #8 Exterior Framing; Phone #: ###-#### Internet Inspection Request from: Alex Monge looked at ext framing roof to 4th floor
|
BLD-Conference | 10/11/2005 | 10/12/2005 | 10/13/2005 | A | DONE |
Dave Hannah
|
|
|
Building #8 Exterior Framing; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
Plan resubmittals received | | | 9/23/2005 | | |
|
|
|
Received (2) copies of sheet S3.5. Routed to John M.
|
BLD-Framing/Rough-in | 9/16/2005 | 9/16/2005 | 9/19/2005 | P | PART |
Dave Hannah
|
|
|
Call John with Lombac; Phone #: ###-#### Internet Inspection Request from: Ben Kos walled floors 5 to roof looking at ext wall framing everything ok to date
|
BLD-Framing/Rough-in | 9/13/2005 | 9/15/2005 | 9/16/2005 | P | PART |
Dave Hannah
|
|
|
Call John with Lombac; Phone #: ###-#### Internet Inspection Request from: Ben Kos walked project to look at ext framing
|
FIRE-Conference | 8/2/2005 | 8/2/2005 | 8/2/2005 | A | DONE |
Forrest France
|
|
|
On site discussion with Wil Northup and Bill Alexander regarding the installation of an above ground water storage tank for supplemental fire sprinkler supply. The tank was installed without an FIR permit and thus not reviewed or approved for code compliance. The general and subcontractors involved were made aware of the situation.
|
BLD-Conference | 5/4/2005 | 5/5/2005 | 5/5/2005 | A | DONE |
Dave Hannah
|
|
|
pre construction meeting
|
Voucher Form | | | 4/28/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/18/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/12/2005 | | DONE |
|
|
|
left mess for james woodbury at ###-#### permit is ready & need something from achd
|
Plan assigned to (JCM) | 12/10/2004 | 12/10/2004 | 4/11/2005 | | PASS |
|
|
|
4/11/2005 14:06:17 JCM - activity updated through activity BLDA022 from case BLD04-02876.
|
Routing - PLUMBING | 4/11/2005 | | 4/11/2005 | | PASS |
|
|
|
the plumbing for this project has not been reviewed for this shell permit. plumbing plans must be submitted with the tenant improvement plans for review.
|
Routing - PLAN CHECK | 4/11/2005 | | 4/11/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/11/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/11/2005 | | DONE |
|
|
|
|
Routing - PLANNING | 4/8/2005 | | 4/8/2005 | | PASS |
|
|
|
Approved per DRH03-187 and as noted on sheet A3.4 for decorative concrete at pilaster bases.
|
Routing - FIRE | 3/29/2005 | | 4/7/2005 | | PASS |
|
|
|
resubmittal acceptable subject to conditions noted in revised plan review comments, comments faxed to architect.
|
Plan resubmittals received | | | 3/30/2005 | | DONE |
|
|
|
Resubmittals received and forwarded to John M.: 4 copies of plan sheets A3.1, A3.2, A3.3 and A3.4.
|
Routing - PLAN CHECK | 3/28/2005 | | 3/29/2005 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 3/29/2005 | | PASS |
|
|
|
Reviewed and approved resubmitted plans sheets for shell permit. JCM
|
Routing - PUBLIC WORKS | 3/25/2005 | | 3/28/2005 | | PASS |
|
|
|
Plans taken to Kent Johnson on 3-25-05
|
Routing - PUBLIC WORKS | 3/9/2005 | | 3/23/2005 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/15/2005 | | 3/18/2005 | | PASS |
|
|
|
Called PDQ for pick up. - Received an e-mailed letter from the consulting structural engineer approving the 3rd and final review for this project. JCM
|
Plan resubmittals received | | | 3/11/2005 | | DONE |
|
|
|
Received 2 Letters/Building Code Review ,4 Copys of sheets A0.1,A1.2,A2.12,A7.1,A7.5 & 3 Copys of sheet S1.1 Taken to John M.
|
Routing - PLAN CHECK | 1/19/2005 | | 3/9/2005 | | |
|
|
|
|
Plan resubmittals received | | | 3/2/2005 | | DONE |
|
|
|
1 ESC sheets C1.2A and C1.2B with updated comments reflecting ACHD requirements received and forwarded to John M.
|
Plan resubmittals received | | | 2/10/2005 | | DONE |
|
|
|
Recvd 1 transmillat letter; 4 copies of C1.1, A1.1, A1.2, A2.12, A7.5; 3 copies of Structrual calc for plan check response 2nd submittal taken to John Menard///2/10/05 BAS
|
Plan resubmittals requested | | | 2/4/2005 | | DONE |
|
|
|
E-mailed the applicant with a copy of the structural review comments requesting additional revisions. JCM
|
Routing Off Site - STRUCTURAL | 1/31/2005 | | 2/3/2005 | | FAIL |
|
|
|
Called PDQ for pick up --- Received comment list from constulting structural engineer requesting additional revisions. JCM
|
Plan resubmittals received | | | 1/28/2005 | | DONE |
|
|
|
Received Transmittal, 1 Letter, 4 Structural Calcs & 4 Copys of sheets S1.1, S1.2, S2.1, S3.5, S3.6 . Taken to John M.
|
1st review completed | | | 1/19/2005 | | FAIL |
|
|
|
failed planning, plan check, plumbing, structural, ESC, and fire.
|
Routing - FIRE | 1/10/2005 | | 1/19/2005 | | FAIL |
|
|
|
Failed due to insufficient information regarding all aspects of fire protection requirements. Review faxed to architect.
|
Routing - PLAN CHECK | 12/29/2004 | | 1/10/2005 | | FAIL |
|
|
|
John M.
|
Plan resubmittals requested | | | 1/10/2005 | | DONE |
|
|
|
E-mailed the applicant with a copy of the plan review comment list requesting revisions. JCM
|
Plan resubmittals requested | | | 1/3/2005 | | |
|
|
|
E-mailed the applicant a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 12/16/2004 | | 1/3/2005 | | FAIL |
|
|
|
contacted PDQ for outside delivery of soils report.rad - Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 12/22/2004 | | 12/29/2004 | | FAIL |
|
|
|
Plans do not comply with the most recent Design Review Committee action or per the original Design Review conditions. DRH03-00187
|
Routing - PLUMBING | 12/16/2004 | | 12/22/2004 | | FAIL |
|
|
|
7.General note 4- 1/4" per foot grade min. on 3" and smaller, 1/8" per foot 4" and larger. 8. Provide calculations for water pipe sizing, gpms for pipe sizes 4"thru 1/2". 9.provide fixture schedule. 10. A4.3 shows 6 lavs in the public restrooms P1.4 shows 4. 11.Provide information on pool equipment connections. 12. Use boise city approved flammable liquids interceptor detail, attached. , 1. H.E.2 must be double wall with leak detection. 2. waste main is undersized. 3.locate riser diagrams on plan.4.suds relief, no connections to a waste stack within 8' verticaly or horizontaly, 5. tub trap arms 2" limited to 5'. 6. detail 10 page A8.2 wet venting limited to 1 and 2 fixture unit fixtures.
|
Plan resubmittals received | | | 12/22/2004 | | |
|
|
|
|
Routing - Erosion and Sediment | 12/22/2004 | | 12/22/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan Reviewer's activity | | | 12/22/2004 | | DONE |
|
|
|
E-mailed Sylvester to request clarification on the extent of construction this permit was intended to cover. JCM
|
Plan resubmittals received | | | 12/21/2004 | | DONE |
|
|
|
Received fire flow information from Sylvester Ramirez and inserted info into plans currently routing.
|
Routing - PUBLIC WORKS | 12/10/2004 | | 12/16/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 12/16/2004 | | 12/16/2004 | | FAIL |
|
|
|
ESC plan, waiver or refer to Master plan under another ESC permit number is needed. Discussed with RP Dave Anderson, will address and get back to me.
|
Plan resubmittals received | | | 12/16/2004 | | DONE |
|
|
|
Received four copies of sheet EN-1 and four copies of sheet A2.1.
Sheet A2.1 is not signed by the Arch. but is for CDH signature only. Received two copies of Geotech. report. Routed to John M. kmm
|
Routing - PLANNING Land Div | 12/10/2004 | | 12/10/2004 | | PASS |
|
|
|
Block 8 of Davis Addition and vacated alley.
|
Plan routing begun/NEW & ADDTN | | | 12/10/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/10/2004 | | PEND |
|
|
|
Plan is missing ESC plan and narrative, United water fire flow, Soils report.rad
|
Application received | | | 12/9/2004 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/10/2004 | | | | |
|
|
|
Contacted PDQ for outside delivery.
|