Case Summary (BLD) | | | 8/18/2006 | | DONE |
|
|
|
|
BLD-Final | 5/24/2005 | 5/25/2005 | 5/25/2005 | A | PASS |
Dave Hannah
|
|
|
harry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
|
Letter of compliance | | | 5/25/2005 | | DONE |
|
|
|
Letter of Compliaince issued 5-25-05.
|
FIRE-Final Inspection | 5/23/2005 | 5/24/2005 | 5/24/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 5/3/2005 | 5/4/2005 | 5/4/2005 | A | CANC |
Forrest France
|
|
|
Cancel inspection per. general contractor, not ready.
|
BLD-Final | 4/18/2005 | 4/19/2005 | 4/19/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/18/2005 at 3:33:23 PM. Contact: ###-####. Need fire approval and mechanical permit and approval for dust collection. 4/19/2005 1:43:56 PM
|
BLD-Final | 4/19/2005 | 4/19/2005 | 4/19/2005 | A | PART |
Forrest France
|
|
|
Temp. occupancy given per. Dave Lokker, pending fire alarm and fire sprinkler modifications.
|
FIRE-Final Inspection | 4/19/2005 | 4/19/2005 | 4/19/2005 | A | PART |
Forrest France
|
|
|
Temp. occupancy given per. Dave Lokker, pending fire sprinkler modifications in spray booth and compressor room.
|
FIRE-Alarm Testing | 4/19/2005 | 4/19/2005 | 4/19/2005 | A | PART |
Forrest France
|
|
|
Temp. occupancy given per. Dave Lokker, pending fire alarm modifications to include addition of three tamper switches and one flow switch addressed to 2990 Wise Way.
|
Telephone call | | | 3/23/2005 | | DONE |
|
|
|
Telcon with Randy Sycamora, ADT who is to provide the alarm monitoring for Bledsoe and Rick Jackson, Allied General (3.24) who provides monitoring for Shakespeare and the site fire pump. Bledsoe shall provide their own FACP monitoring the outside PIV on Wise, which serves their building and all other sprinkler valves and flow switches required for the sprinkler system to be installed in Bledsoe, and including any HVAC duct smoke detectors, etc. The Shakespeare FACP provides pump monitoring and will need to remove the exisitng flow switch at the discharge of the fire pump and be sure the "pump running" signal is a supervisory, not an alarm signal. This will allow Bledsoe to test their system without creating an alarm signal at Shakespeare which would result in rolling the FD. It will also preserve the required fire pump monitoring and all related contral valve monitoring per 72 and 20 which will be done solely by Shakespeare's FACP. The fire pump arrangement was initially approved by the county when both buildings were part of the same facility. It has since been divided into two separate properties creating this problem of how to divide responsibility for FP monitoring and avoid duplicate alarm signals to the FD.
|
BLD-Conference | 3/9/2005 | 3/10/2005 | 3/10/2005 | A | DONE |
Troy James
|
|
|
###-#### steven
|
FIRE-Final Inspection | 3/9/2005 | 3/9/2005 | 3/9/2005 | P | FAIL |
Troy Cobbley
|
|
|
See fire dept review notes for my comments on items needing verified. 3/9/2005 12:39:53 PM
|
Issue PAID IN FULL permit | | | 2/22/2005 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 12/10/2004 | | 2/18/2005 | | PASS |
|
|
|
2/18/2005 10:28:48 RMH - activity updated through activity BLDA022 from case BLD04-02877.
|
Routing - PLAN CHECK | 2/17/2005 | | 2/18/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 2/18/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/18/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/18/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/18/2005 | | DONE |
|
|
|
lft vm with chad slister ###-#### that permit and fees are ready to be picked up
|
Routing - FIRE | 2/11/2005 | | 2/17/2005 | | PASS |
|
|
|
resubmittal acceptable. revised review comments faxed to archtiect.
|
Plan resubmittals received | | | 2/8/2005 | | DONE |
|
|
|
Received 2 Letters,2 Review Letters, 2 HVAC Letters,2 Material Safty Data Sheets, 2 Hazard Communications, & 2 Copys of sheets A2.0, A2.2, M-2 Taken to Ron H.
|
1st review completed | | | 12/30/2004 | | FAIL |
|
|
|
failed Fire.
|
Routing - FIRE | 12/22/2004 | | 12/30/2004 | | FAIL |
|
|
|
Spray room design not in compliance with codes; submittal lacks significant information. Review faxed to architect.
|
Routing - PLAN CHECK | 12/21/2004 | | 12/22/2004 | | PEND |
|
|
|
No corrections required by building department plan review, Routed plans to fire for review on 12/22/04 Permit pending fires review
|
Case Summary (BLD) | | | 12/22/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/22/2004 | | DONE |
|
|
|
|
Routing - PLANNING | 12/13/2004 | | 12/21/2004 | | PASS |
|
|
|
Routed to Scotts desk on 12/13/04
|
Routing - PUBLIC WORKS | 12/10/2004 | | 12/13/2004 | | PASS |
|
|
|
|
Application received | | | 12/9/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/9/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/9/2004 | | |
|
|
|
|
Fee Review-notes | 12/9/2004 | 12/9/2004 | | | |
|
|
|
|
Routing - PLAN CHECK | 12/30/2004 | | | | |
|
|
|
|