Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-02920
StatusFinaled
Name AVISION LLC
Site Address 4500 N ARROW CREST WAY
Project NameHillside
Customer Number 
ePlanReviewNo
Description
To construct a six bedroom, three and one quarter bathroom 3722 sq. ft. two story single family dwelling (1724 sq. ft. first floor/439 sq. ft. second floor/1559 sq. ft. FINISHED basement) with a attached 1011 sq. ft. three car garage, a 235 sq. ft. covered porch off the basement, a 235 sq. ft. deck off the back of the residence and a 80 sq. ft. covered entry porch. Per approved plans, engineering and requirement list. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible space will be required. PC# 710 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/8/20059/8/20059/8/2005PPASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Titus Gilliam
DOC - Permit Finaled9/8/20059/8/20059/8/2005PPASS
DetailsTony Young
c of o issued
BLD-Final9/6/20059/7/20059/7/2005PFAIL
DetailsTony Young
maybe confirm w/ titus before arriving to make sure everything ready; Phone #: ###-#### Internet Inspection Request from: Titus Gilliam
c/n posted
BLD-Grading Inspection9/7/20059/7/20059/7/2005 BOND
Rough grading is complete however fine grading and installation of a roof drain pipe are not complete. For this a $2,000.00 bond is required. Upon receipt of this bond the grading and drainage is conditionally approved.
BLD-Energy code compliance5/3/20055/4/20055/4/2005ANR
DetailsTony Young
Internet Inspection Request from: Titus Gilliam
need trades 5/4/2005 10:45:07 AM
BLD-Energy code compliance5/4/20055/4/20055/4/2005PPASS
DetailsTony Young
Internet Inspection Request from: Titus Gilliam
BLD-Framing/Rough-in5/2/20055/2/20055/2/2005PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Titus Gilliam
frame ok, ok to insulate pending mech. rough 5/2/2005 2:02:00 PM
BLD-Framing/Rough-in4/29/20054/29/20054/29/2005PNR
DetailsTony Young
Tony, HVAC should be done AM. Framers will be on job at noon to pick up details from Thursday. If possible and in area try to catch them around one PM in the afternoon Friday. thanks; Phone #: ###-#### Internet Inspection Request from: Titus Gilliam
BLD-Framing/Rough-in4/28/20054/28/20054/28/2005PNR
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Titus Gilliam
BLD-Framing/Rough-in4/20/20054/20/20054/20/2005PPART
DetailsTony Young
titus --shear ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ext. shear ok 4/20/2005 4:04:29 PM
BLD-Framing/Rough-in4/18/20054/19/20054/19/2005AFAIL
DetailsTony Young
titis - Note: shear only; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
need approved plans 4/19/2005 11:47:24 AM
BLD-Foundation1/25/20051/26/20051/26/2005APART
DetailsTony Young
jed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
basement wall 1/26/2005 12:57:16 PM
BLD-Footing1/19/20051/20/20051/20/2005PPART
DetailsTony Young
JED; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Grading Inspection1/19/20051/19/20051/19/2005 DONE
Footing subgrade approved by the geotechnical engineer
PubWorks Subgrade Approval12/22/200412/22/20041/19/2005 DONE
A LETTER FROM THE APPLICANTS GEOTECHNICAL ENGINEER INDICATING THAT THE FOOTING SUBGRADE IS ACCEPTABLE MUST BE APPROVED BY PUBLIC WORKS PRIOR TO SCHEDULING A FOOTING INSPECTION. ALL TERRY RECORDS AT ###-#### OR FAX AT ###-####
Override - Activity Holds  1/12/2005  
Issue PAID IN FULL permit  1/12/2005  
Pending Assignment by DJO12/16/2004 1/7/2005 DONE
1/7/2005 08:31:17 SAM - activity updated through activity BLDA183 from case BLD04-02920.
Routing - PLAN CHECK12/27/2004 1/7/2005 PASS
Plan assigned to (SAM)1/6/2005 1/7/2005 PASS
1/7/2005 09:31:47 SAM - activity updated through activity BLDA022 from case BLD04-02920.
Case Summary (BLD)  1/7/2005  
Plan Review Report  1/7/2005  
PLANS/APPL TAKEN TO FRONT DESK  1/7/2005 DONE
Override - Activity Holds  1/7/2005  
Permit Ready to Issue  1/7/2005 DONE
Override - Activity Holds  1/7/2005  
Inspection Record Card- Bld  1/7/2005 DONE
Print Occupancy Form  1/7/2005 DONE
Telephone call  1/7/2005 DONE
Left message that permit is ready & fees///1/7/05 2:30pm BAS
Routing - Erosion and Sediment12/29/2004 12/30/2004 PASS
ESC plan approved with attached conditions.
Routing - FIRE12/30/2004 12/30/2004 PASS
No fire sprinklers required. (Arrowhead Ridge sub)
Routing - PLANNING12/22/2004 12/27/2004 PASS
holiday
Routing - PUBLIC WORKS12/22/2004 12/22/2004 PASS
Routing - PUBLIC WORKS GRADING12/22/2004 12/22/2004 PASS
APPROVED AS CATEGORY 3
Routing - PUBLIC WORKS GRADING12/16/2004 12/17/2004 FAIL
Geotechnical report must be revised. Contacted engineer and contractor.
Application received  12/16/2004