Second Notice BLD | 12/22/2005 | 12/22/2005 | 1/20/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 12/8/2005 | 12/8/2005 | 12/22/2005 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 12/6/2005 | 12/8/2005 | 12/8/2005 | P | PASS |
Jim Sly
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa C/C issued
|
DOC - Permit Finaled | 12/8/2005 | 12/8/2005 | 12/8/2005 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 12/8/2005 | 12/8/2005 | 12/8/2005 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 12/8/2005 | 12/8/2005 | 12/8/2005 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 12/8/2005 | 12/8/2005 | 12/8/2005 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 11/8/2005 | 11/9/2005 | 11/9/2005 | A | FAIL |
Troy Cobbley
|
|
|
need to final fire alarm and fire sprinkler, need to test exit signs and emergency lights, need to provide "Fire Door-Do Not Block" signs on both sides of both fire doors, provide door and exit hardware from the new storage area to the exterior as discussed.
|
FIRE-Final Inspection | 11/3/2005 | 11/8/2005 | 11/8/2005 | A | FAIL |
Troy Cobbley
|
|
|
Need fire alarm and fire sprinkler finaled. No items looked except the roll down doors which operated correctly.
|
FIRE-Final Inspection | 10/10/2005 | 10/10/2005 | 10/10/2005 | P | FAIL |
Troy Cobbley
|
|
|
fire sprinkler plans are still in review and fire alarm failed. No life safety inspection performed.
|
FIRE-Final Inspection | 10/7/2005 | 10/10/2005 | 10/10/2005 | A | FAIL |
Troy Cobbley
|
|
|
fire sprinkler plans are still in review and fire alarm failed. No life safety inspection performed.
|
BLD-Foundation | 9/7/2005 | 9/8/2005 | 9/8/2005 | A | PASS |
Jim Sly
|
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Letter from Eng. 2500 psi design No special insp Req. Wall taller than what shows on appr plan.......Eng letter OK'd change...... Need to add additional horiz bar.....inspected and Ok'd as instructed by Eng. Found wall OK.
|
BLD-Foundation | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | FAIL |
Jim Sly
|
|
|
foundation wall insp///don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Footing poured W/O special insp 3000psi C/N Need (stamped) letter from Eng of record reducing design strength of conc to 2500psi or less, or special insp required. Not accepting (unstamped) letter from Architect waiving special insp because project was simple and as no significance. Verts (#4) lapped less than 40 dia. (approx 12" or less).
|
BLD-Footing | 8/31/2005 | 8/31/2005 | 8/31/2005 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 9:12:34 AM. Contact: ###-####. Footing for new canopy at sw end of bldg. Approved plans call for special inspections. Informed contractor that special insp. was required.
|
FIRE-Sprinkler Rough-in | 8/16/2005 | 8/17/2005 | 8/17/2005 | P | CANC |
Troy Cobbley
|
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Conference | 8/10/2005 | 8/11/2005 | 8/11/2005 | A | DONE |
Troy Cobbley
|
|
|
Per sam rogers a temp would be acceptable if the existing fire alarm system provided adequate sound levels in the remodeled area. All other life safety items would need to be provided prior to the temporary occupancy being given
|
BLD-Conference | 8/8/2005 | 8/9/2005 | 8/9/2005 | A | CANC |
Jim Sly
|
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Canc by Contr.
|
BLD-Footing | 8/5/2005 | 8/8/2005 | 8/8/2005 | P | NR |
Jim Sly
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 7/5/2005 | 7/7/2005 | 7/7/2005 | A | PART |
Jim Sly
|
|
|
fire wall inspection///don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Moved 3"abs out of 1hr wall....the remaining one needs framing perpendicular to wall and Firestopping device. Need UL listing for firestop (device). Call for insp of 1hr wall after all firestopping.
|
BLD-Framing/Rough-in | 6/27/2005 | 6/28/2005 | 6/28/2005 | A | FAIL |
Jim Sly
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa C/N...... Contractor to supply UL listed assembly for top connection of 3hr wall and plastic pipe penitration.
|
Plan resubmittals received | | | 4/21/2005 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of sheets A1.1,G1.3 Taken to Ron H. ( Plans issued 4-5-05 )
|
Inspection Record Card- Bld | | | 3/29/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 3/29/2005 | | |
|
|
|
|
Telephone call | | | 3/29/2005 | | DONE |
|
|
|
left mess for nick barnard at ###-#### is ready
|
Telephone call | | | 3/29/2005 | | DONE |
|
|
|
nick barnard at ###-#### permit is ready
|
Plan Modification Accepted | | | 3/28/2005 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 3/28/2005 | | 3/28/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/28/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/14/2005 | | DONE |
|
|
|
Received Transmittal Letter,& 2 Copys of sheets G1.2,G1.3 Taken to Ron H.
|
Inspection Record Card- Bld | | | 3/11/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/11/2005 | | |
|
|
|
|
CHANGE ISSUED DATE | | | 3/11/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/24/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 2/24/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/24/2005 | | DONE |
|
|
|
tlk to james ###-#### that permit and fees are ready to be picked up
|
Case Summary (BLD) | | | 2/23/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/13/2005 | | 2/23/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2005 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 12/23/2004 | | 2/23/2005 | | PASS |
|
|
|
2/23/2005 14:47:13 RMH - activity updated through activity BLDA022 from case BLD04-02934.
|
Plan resubmittals received | | | 2/22/2005 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of sheets G1.3,G1.4,A3.1 Taken to Ron H.
|
Routing - PLAN CHECK | 1/13/2005 | | 2/15/2005 | | FAIL |
|
|
|
Faxed and mailed requirements to architect on 2/15/05.
|
Plan resubmittals received | | | 2/11/2005 | | DONE |
|
|
|
Received Transmittal, & 2 Copys of sheets G1.2, G1.3 Taken to Ron H.
|
Routing - FIRE | 1/10/2005 | | 1/13/2005 | | PASS |
|
|
|
|
1st review completed | | | 1/13/2005 | | FAIL |
|
|
|
failed plan check
|
Routing - PLAN CHECK | 1/4/2005 | | 1/10/2005 | | FAIL |
|
|
|
Faxed and mailed requirements to the architect on 1/10/05, Routed plans to the fire department same day.
|
Routing - PLANNING | 12/28/2004 | | 1/4/2005 | | PASS |
|
|
|
Tempra Wilson DRH04-00282 - Approved per DRH04-00282.
|
Routing - PUBLIC WORKS | 12/23/2004 | | 12/28/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 12/28/2004 | | 12/28/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plans ACCEPTED BY PLAN TECH | | | 12/20/2004 | | DONE |
|
|
|
|
Application received | | | 12/17/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/17/2004 | | DONE |
|
|
|
|
Third Notice BLD | 1/20/2006 | 1/20/2006 | | | |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 12/17/2004 | 12/17/2004 | | | |
|
|
|
|