Fee Review-notes | 12/17/2004 | 12/17/2004 | 4/6/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/5/2007 | | DONE |
|
|
|
call to Carrie w/ Benchmark, she stated she will check on the cert of fv and call back.
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | 1/30/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 9/25/2006 | 9/25/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/9/2006 | 9/25/2006 | | DONE |
|
|
|
|
BLD-Final | 8/8/2006 | 8/9/2006 | 8/9/2006 | A | PASS |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles OK for Perm Occ. :)
|
Permanent occupancy | | | 8/9/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11167 issued 8-9-06 to Cross of Christ Evangelical Lutheran Church (addn.)
|
Code Occupancy Approval | 8/8/2006 | 8/8/2006 | 8/8/2006 | P | PASS |
Carol Montgomery
|
|
|
|
Permanent Occupancy | | 8/8/2006 | 8/8/2006 | | DONE |
|
|
|
|
BLD-Final | 4/4/2006 | 4/5/2006 | 4/5/2006 | A | PART |
Jim Sly
|
|
|
scott ; Phone #: ###-#### Internet Inspection Request from: Marsha Still OK for Temp.... OK for Perm Occ when Code Enforc Perms.
|
FIRE-Final Inspection | 4/3/2006 | 4/4/2006 | 4/4/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 3/29/2006 | 3/31/2006 | 3/31/2006 | A | FAIL |
Troy Cobbley
|
|
|
Sprinkler heads need to be added in the large storage room due to a ceiling being added. Also separations have been added around the riser room that may affect sprinkler coverage.
|
FIRE-Final Inspection | 3/17/2006 | 3/20/2006 | 3/20/2006 | P | FAIL |
Troy Cobbley
|
|
|
The fire alarm permit needs finaled but when that happens the lfie safety can be finaled for this building permit.
|
FIRE-Sprinkler Rough-in | 3/10/2006 | 3/13/2006 | 3/13/2006 | A | PASS |
Troy Cobbley
|
|
|
Inspection was for the final for the fire sprinkler permit. See FIR05-00571 for entry
|
FIRE-Conference | 3/1/2006 | 3/2/2006 | 3/2/2006 | A | DONE |
Troy Cobbley
|
|
|
I had a conference with the superintendant and Treasure Valley Fire. Heads will not be required under the beam since it is only 10.5" wide but the sidewall head sprinkler deflectors exceed 6" from the beam/wall and will need to be relocated along both sides of the beams.
|
BLD-Conference | 2/24/2006 | 2/27/2006 | 2/27/2006 | A | PASS |
Jim Sly
|
|
|
Terry; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Bldg Constr type changed from V1hr to type Vb and IIIb.
|
FIRE-Conference | 2/6/2006 | 2/7/2006 | 2/7/2006 | A | DONE |
Troy Cobbley
|
|
|
Went over life safety notes that apply to the existing church area.
|
BLD-Final | 1/13/2006 | 1/13/2006 | 1/13/2006 | P | PART |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa OK for Temp Occ Need perm from Fire and Code Enf.... Need re-insp of struct. after completion of selected areas.
|
Temporary occupancy | | | 1/13/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5355 issued 1-13-06 to Cross of Christ Church (addn.)
|
BLD-Final | 1/6/2006 | 1/9/2006 | 1/10/2006 | P | NR |
Jim Sly
|
|
|
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 1/6/2006 | 1/9/2006 | 1/9/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Hanneman's permission for the church to occupy the new addition so that work can be completed in the existing area.
|
BLD-Final | 1/5/2006 | 1/6/2006 | 1/6/2006 | P | FAIL |
Jim Sly
|
|
|
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N Need to fire block comunication from vert to horiz in Mech and Storage rooms.
|
FIRE-Final Inspection | 1/5/2006 | 1/6/2006 | 1/6/2006 | A | FAIL |
Troy Cobbley
|
|
|
Need signage or painting of the curb when the final happens. Knox key box and occupant load signs need installed for the new addition. Per Dave Hanneman a temp is ok when fire alarm and fire sprinkler is complete in the new addition.
|
FIRE-Final Inspection | 1/4/2006 | 1/5/2006 | 1/5/2006 | P | PART |
Troy Cobbley
|
|
|
The only life safety items looked at so far are the exit signs and emergency lights in the new areas which passed except for the east corridor exit discharge light.
|
BLD-Framing/Rough-in | 12/27/2005 | 12/28/2005 | 12/28/2005 | A | PASS |
Mike Jordan
|
|
|
ceiling grid inspection//Terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. hallways, classrooms, kithcen, and offices.
|
BLD-Energy code compliance | 10/17/2005 | 10/18/2005 | 10/18/2005 | A | PASS |
Mike Jordan
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Also reviewed UL listings for penetrations in 3hr. cmu wall.
|
BLD-Framing/Rough-in | 10/11/2005 | 10/12/2005 | 10/12/2005 | A | PASS |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK to Insul....See previous notes
|
BLD-Framing/Rough-in | 10/4/2005 | 10/5/2005 | 10/5/2005 | A | PART |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Walk thru......Fireblock all dropped ceiling areas.. seal plate penitrations.... firestop all Penitrations and Constr joints in 3hr wall... Provide listed assemblies. OK to insulate.
|
BLD-Framing/Rough-in | 9/16/2005 | 9/16/2005 | 9/16/2005 | P | NR |
Tom Arcoraci
|
|
|
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Conference | 9/13/2005 | 9/13/2005 | 9/13/2005 | P | PASS |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Walk thru with Contr
|
BLD-Conference | 9/12/2005 | 9/12/2005 | 9/12/2005 | P | CANC |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 8/15/2005 | 8/16/2005 | 8/16/2005 | A | DONE |
Troy Cobbley
|
|
|
Spoke to contractor about options for relocating the underground supply stub-in
|
BLD-Foundation | 5/20/2005 | 5/23/2005 | 5/23/2005 | A | PART |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore W. Wall next to existing bldg OK. 5/23/2005 9:50:57 AM
|
BLD-Footing | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | PASS |
Jim Sly
|
|
|
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie W. Wall by existing bldg. Epoxy dowels OKd by special insp. 5/20/2005 11:37:36 AM
|
BLD-Foundation | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | PASS |
Jim Sly
|
|
|
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie E. wall... next to existing. Epoxy dowels appr by special insp. 5/20/2005 11:38:39 AM
|
BLD-Foundation | 5/18/2005 | 5/18/2005 | 5/18/2005 | P | PART |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Footing at East wall next to existing bldg and completion of North wall new bldg ok. 5/18/2005 5:06:32 PM
|
BLD-Foundation | 5/16/2005 | 5/17/2005 | 5/17/2005 | P | PART |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa East, West and part of North and center walls OK. Stapley Engineering provided fix....and Terricon completed special inspection for epoxy dowels (verts) 5/17/2005 3:32:46 PM
|
BLD-Foundation | 5/13/2005 | 5/16/2005 | 5/16/2005 | A | NR |
Jim Sly
|
|
|
terry ###-#### Still waiting for Engineering Contr to fix, and special insp for any epoxy doweling. 5/16/2005 10:54:01 AM
|
BLD-Footing | 5/13/2005 | 5/13/2005 | 5/13/2005 | P | FAIL |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa #5 verticals not exposed enough above top of footing to allow for 40 diameter lap (16 to 22".... most 17") Engineer to provide fix...Do not pour. 5/16/2005 10:51:16 AM 5/16/2005 10:52:17 AM
|
BLD-Foundation | 5/12/2005 | 5/13/2005 | 5/13/2005 | P | CANC |
Jim Sly
|
|
|
TERRY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles--cancel & reschedule
|
BLD-Footing | 5/10/2005 | 5/10/2005 | 5/10/2005 | P | PASS |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Issue PAID IN FULL permit | | | 5/9/2005 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 12/17/2004 | | 5/5/2005 | | PASS |
|
|
|
5/5/2005 09:10:20 MLO - activity updated through activity BLDA022 from case BLD04-02937.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/5/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/5/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/5/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/5/2005 | | DONE |
|
|
|
tlk to clinton yaka ###-#### that permit and fees are ready to be picked up
|
Routing - FIRE | 5/2/2005 | | 5/4/2005 | | PASS |
|
|
|
resubmittal acceptable; revised comments faxed to architect.
|
Plan resubmittals received | | | 5/2/2005 | | |
|
|
|
Received two copies of plan sheets C-4.0, A-1.1, one copy of United Water Letter and cover letter.
|
Routing - FIRE | 4/25/2005 | | 4/28/2005 | | FAIL |
Bill Alexander
|
|
|
1. Underground water supply lines with a single point of connection to supply both fire hydrants and fire suppression systems are not allowed. (IFC 508.6, BMC 7-01-046)
2. The Architect of Record for the construction phase of this project shall provide documentation of the hydrant water flow available at this site. Hydrant flow shall meet the requirements of IFC B105.1.
3. The Architect of Record for the construction phase of this project the architect shall submit written documentation from United Water Company, of the water pressure and flow available for automatic fire sprinkler system design.
4. Provide location of Fire extinguishers (Refer to IFC 906 and NFPA 10 for details).
|
Routing - PLAN CHECK | 4/28/2005 | | 4/28/2005 | | PEND |
|
|
|
fire dept. approval
|
Routing - PLANNING | 4/21/2005 | | 4/25/2005 | | PASS |
|
|
|
Susan Riggs
|
Routing - PUBLIC WORKS | 4/14/2005 | | 4/21/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/25/2005 | | 4/14/2005 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/14/2005 | | 4/14/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/13/2005 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of sheets A-1.2,A-6.1,A-7.1,P-2.0,P-3.0,E2.1F,E2.1L,E2.1P,E2.1S,E2.1T Taken to Mike O.
|
Plan resubmittals received | | | 3/23/2005 | | DONE |
|
|
|
Resubmittals received and forwarded to Mike Otto: 1 cover letter with architects responses; 2 heat load calculations; 2 copies of metal Speck Bldg. engineered plans sheets S-1, S-2, S-3, S-4, S-5, S-6; 2 copies of metal bldg. calculations; 2 copies of plan sheets G-1, SD-1, C-1.0, C-2, C-3, C-4, C-5, C-6, C-7, L-1, S0.1, S1.1, S2.1, S2.2, S5.1, S7.1, S7.2, S7.3, A-1.1, A-1.2, A-1.3, A-2.1, A-3.1, A-3.2, A-4.1, A-5.1, A-5.2, A-5.3, A-5.4, A-6.1, A-6.2, A-7.1, A-7.2, A-7.3, P-1.0, P-2.0, P-3.0, P-4.0, M-1, M-2, M-3, M-4, M-5, E1.0, E2.0D, E2.0E, E2.1F, E2.1L, E2.1P, E2.1S, E2.1T, E2.2E, E3.0, E4.0; and 1 copy of as built plans (stamped by Russ Phillips).
|
Plan resubmittals requested | | | 1/25/2005 | | DONE |
|
|
|
structural corrections sent to architect
|
Routing Off Site - STRUCTURAL | 1/19/2005 | | 1/25/2005 | | FAIL |
|
|
|
Contacted PDQ to take steel building plans received on 1/18/04 to outside eng.
|
Routing Off Site - STRUCTURAL | 12/20/2004 | | 1/25/2005 | | FAIL |
|
|
|
Contacted PDQ for outside pickup. 1/12/2005 - waiting for metal building plans to continue with review. Corrections sent to architect
|
Routing - FIRE | 1/13/2005 | | 1/21/2005 | | FAIL |
|
|
|
Review comments faxed to archtect. Water supply, hydrant, and fire extinguisher issues.
|
1st review completed | | | 1/21/2005 | | FAIL |
|
|
|
failed public works, plan check and fire.
|
Routing - PLAN CHECK | 1/21/2005 | | 1/21/2005 | | PEND |
|
|
|
waiting for resubs
|
Plan resubmittals received | | | 1/18/2005 | | DONE |
|
|
|
Received three copies of 11 x 17 Butler Manufacturing plans and three copies of struct. calcs and one copy of letter of certification for loading. Routed to Mike O. kmm Contacted BRS requesting 18 x 24 size plans. kmm
|
Plan resubmittals requested | | | 1/13/2005 | | DONE |
|
|
|
IBC corrections
|
Plan resubmittals received | | | 1/13/2005 | | DONE |
|
|
|
Per Susan Riggs she received two sets of sheets L-1 taken to Mike Otto.
|
Routing - PLAN CHECK | 1/6/2005 | | 1/12/2005 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLANNING | 12/30/2004 | | 1/6/2005 | | PASS |
|
|
|
cup04-00116 Susan Riggs
|
Routing - Erosion and Sediment | 12/29/2004 | | 12/30/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLUMBING | 12/30/2004 | | 12/30/2004 | | PASS |
|
|
|
1. sht p-4 detail A/p-1 extend four inch to cleanout not reduce to three inch 2. sht p-1 vent for grease interceptor should be on downstream side 3. see attached grease interceptor drawing approved by the city of boise 4. two inch water service needs double check backflow 5. need expansion protection 6. water heater needs unions within twelve inches 7. grease line needs cleanout two feet outside building
|
Routing - PUBLIC WORKS | 12/20/2004 | | 12/29/2004 | | FAIL |
|
|
|
Revisions required. Contact Brian Murphy at ###-####
|
Routing - PLANNING Land Div | 12/20/2004 | | 12/20/2004 | | PASS |
|
|
|
Lot 12, Block 1, Big Sky Subdivision
|
Application received | | | 12/17/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/17/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/17/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/17/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/4/2005 | | | | |
|
|
|
|