Permit Information
Permit NumberBLD04-02937
StatusFinaled
Name BENCHMARK CONSTRUCTION INC
Site Address 11655 W MCMILLAN RD
Project NameCross of Christ Church
Customer Number 
ePlanReviewNo
Description
*Cross of Christ Evangelical Lutheran Church* To construct a 20,506 sq. ft one story addition to an existing 6, 010 sq. ft. church building. Construction will be masonry and wood framing with a 3 hr fire wall separating the two construction types. A 5100 sq. ft. portion of the masonry building addition will be framed for a future second floor but will be unoccupied attic space only under this permit. Other work includes some demo and remodeling to the existing structure, all site improvements and landscaping per approved plans and attachments, *CUP04-00116 Mod. 3. The entire building new and existing will be fully fire sprinklered and used for area and equipped with a fire alarm system.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes12/17/200412/17/20044/6/2007 DONE
Telephone call  4/5/2007 DONE
call to Carrie w/ Benchmark, she stated she will check on the cert of fv and call back.
Third Notice BLD1/8/20071/8/20071/30/2007 DONE
Second Notice has not been responded to.
Second Notice BLD9/25/20069/25/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 8/9/20069/25/2006 DONE
BLD-Final8/8/20068/9/20068/9/2006APASS
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
OK for Perm Occ. :)
Permanent occupancy  8/9/2006 DONE
Perm. Occ. Cert. # 11167 issued 8-9-06 to Cross of Christ Evangelical Lutheran Church (addn.)
Code Occupancy Approval8/8/20068/8/20068/8/2006PPASS
DetailsCarol Montgomery
Permanent Occupancy 8/8/20068/8/2006 DONE
Details
BLD-Final4/4/20064/5/20064/5/2006APART
DetailsJim Sly
scott ; Phone #: ###-#### Internet Inspection Request from: Marsha
Still OK for Temp.... OK for Perm Occ when Code Enforc Perms.
FIRE-Final Inspection4/3/20064/4/20064/4/2006APASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection3/29/20063/31/20063/31/2006AFAIL
DetailsTroy Cobbley
Sprinkler heads need to be added in the large storage room due to a ceiling being added. Also separations have been added around the riser room that may affect sprinkler coverage.
FIRE-Final Inspection3/17/20063/20/20063/20/2006PFAIL
DetailsTroy Cobbley
The fire alarm permit needs finaled but when that happens the lfie safety can be finaled for this building permit.
FIRE-Sprinkler Rough-in3/10/20063/13/20063/13/2006APASS
DetailsTroy Cobbley
Inspection was for the final for the fire sprinkler permit. See FIR05-00571 for entry
FIRE-Conference3/1/20063/2/20063/2/2006ADONE
DetailsTroy Cobbley
I had a conference with the superintendant and Treasure Valley Fire. Heads will not be required under the beam since it is only 10.5" wide but the sidewall head sprinkler deflectors exceed 6" from the beam/wall and will need to be relocated along both sides of the beams.
BLD-Conference2/24/20062/27/20062/27/2006APASS
DetailsJim Sly
Terry; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
Bldg Constr type changed from V1hr to type Vb and IIIb.
FIRE-Conference2/6/20062/7/20062/7/2006ADONE
DetailsTroy Cobbley
Went over life safety notes that apply to the existing church area.
BLD-Final1/13/20061/13/20061/13/2006PPART
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
OK for Temp Occ Need perm from Fire and Code Enf.... Need re-insp of struct. after completion of selected areas.
Temporary occupancy  1/13/2006 DONE
Temp. Occ. Cert. # 5355 issued 1-13-06 to Cross of Christ Church (addn.)
BLD-Final1/6/20061/9/20061/10/2006PNR
DetailsJim Sly
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection1/6/20061/9/20061/9/2006APART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hanneman's permission for the church to occupy the new addition so that work can be completed in the existing area.
BLD-Final1/5/20061/6/20061/6/2006PFAIL
DetailsJim Sly
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
C/N Need to fire block comunication from vert to horiz in Mech and Storage rooms.
FIRE-Final Inspection1/5/20061/6/20061/6/2006AFAIL
DetailsTroy Cobbley
Need signage or painting of the curb when the final happens. Knox key box and occupant load signs need installed for the new addition. Per Dave Hanneman a temp is ok when fire alarm and fire sprinkler is complete in the new addition.
FIRE-Final Inspection1/4/20061/5/20061/5/2006PPART
DetailsTroy Cobbley
The only life safety items looked at so far are the exit signs and emergency lights in the new areas which passed except for the east corridor exit discharge light.
BLD-Framing/Rough-in12/27/200512/28/200512/28/2005APASS
DetailsMike Jordan
ceiling grid inspection//Terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. hallways, classrooms, kithcen, and offices.
BLD-Energy code compliance10/17/200510/18/200510/18/2005APASS
DetailsMike Jordan
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Also reviewed UL listings for penetrations in 3hr. cmu wall.
BLD-Framing/Rough-in10/11/200510/12/200510/12/2005APASS
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
OK to Insul....See previous notes
BLD-Framing/Rough-in10/4/200510/5/200510/5/2005APART
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Walk thru......Fireblock all dropped ceiling areas.. seal plate penitrations.... firestop all Penitrations and Constr joints in 3hr wall... Provide listed assemblies. OK to insulate.
BLD-Framing/Rough-in9/16/20059/16/20059/16/2005PNR
DetailsTom Arcoraci
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Conference9/13/20059/13/20059/13/2005PPASS
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Walk thru with Contr
BLD-Conference9/12/20059/12/20059/12/2005PCANC
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Conference8/15/20058/16/20058/16/2005ADONE
DetailsTroy Cobbley
Spoke to contractor about options for relocating the underground supply stub-in
BLD-Foundation5/20/20055/23/20055/23/2005APART
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore W. Wall next to existing bldg OK. 5/23/2005 9:50:57 AM
BLD-Footing5/19/20055/20/20055/20/2005APASS
DetailsJim Sly
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie W. Wall by existing bldg. Epoxy dowels OKd by special insp. 5/20/2005 11:37:36 AM
BLD-Foundation5/19/20055/20/20055/20/2005APASS
DetailsJim Sly
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie E. wall... next to existing. Epoxy dowels appr by special insp. 5/20/2005 11:38:39 AM
BLD-Foundation5/18/20055/18/20055/18/2005PPART
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Footing at East wall next to existing bldg and completion of North wall new bldg ok. 5/18/2005 5:06:32 PM
BLD-Foundation5/16/20055/17/20055/17/2005PPART
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa East, West and part of North and center walls OK. Stapley Engineering provided fix....and Terricon completed special inspection for epoxy dowels (verts) 5/17/2005 3:32:46 PM
BLD-Foundation5/13/20055/16/20055/16/2005ANR
DetailsJim Sly
terry ###-#### Still waiting for Engineering Contr to fix, and special insp for any epoxy doweling. 5/16/2005 10:54:01 AM
BLD-Footing5/13/20055/13/20055/13/2005PFAIL
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa #5 verticals not exposed enough above top of footing to allow for 40 diameter lap (16 to 22".... most 17") Engineer to provide fix...Do not pour. 5/16/2005 10:51:16 AM 5/16/2005 10:52:17 AM
BLD-Foundation5/12/20055/13/20055/13/2005PCANC
DetailsJim Sly
TERRY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles--cancel & reschedule
BLD-Footing5/10/20055/10/20055/10/2005PPASS
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Issue PAID IN FULL permit  5/9/2005 DONE
Plan assigned to (MLO)12/17/2004 5/5/2005 PASS
5/5/2005 09:10:20 MLO - activity updated through activity BLDA022 from case BLD04-02937.
PLANS/APPL TAKEN TO FRONT DESK  5/5/2005 DONE
Inspection Record Card- Bld  5/5/2005 DONE
Print Occupancy Form  5/5/2005 DONE
Permit Ready to Issue  5/5/2005 DONE
Telephone call  5/5/2005 DONE
tlk to clinton yaka ###-#### that permit and fees are ready to be picked up
Routing - FIRE5/2/2005 5/4/2005 PASS
resubmittal acceptable; revised comments faxed to architect.
Plan resubmittals received  5/2/2005  
Received two copies of plan sheets C-4.0, A-1.1, one copy of United Water Letter and cover letter.
Routing - FIRE4/25/2005 4/28/2005 FAIL
DetailsBill Alexander
1. Underground water supply lines with a single point of connection to supply both fire hydrants and fire suppression systems are not allowed. (IFC 508.6, BMC 7-01-046)

2. The Architect of Record for the construction phase of this project shall provide documentation of the hydrant water flow available at this site. Hydrant flow shall meet the requirements of IFC B105.1.

3. The Architect of Record for the construction phase of this project the architect shall submit written documentation from United Water Company, of the water pressure and flow available for automatic fire sprinkler system design.

4. Provide location of Fire extinguishers (Refer to IFC 906 and NFPA 10 for details).
Routing - PLAN CHECK4/28/2005 4/28/2005 PEND
fire dept. approval
Routing - PLANNING4/21/2005 4/25/2005 PASS
Susan Riggs
Routing - PUBLIC WORKS4/14/2005 4/21/2005 PASS
Routing - PLAN CHECK4/25/2005 4/14/2005 PASS
Routing Off Site - STRUCTURAL4/14/2005 4/14/2005 PASS
Plan resubmittals received  4/13/2005 DONE
Received Transmittal Letter, & 2 Copys of sheets A-1.2,A-6.1,A-7.1,P-2.0,P-3.0,E2.1F,E2.1L,E2.1P,E2.1S,E2.1T Taken to Mike O.
Plan resubmittals received  3/23/2005 DONE
Resubmittals received and forwarded to Mike Otto: 1 cover letter with architects responses; 2 heat load calculations; 2 copies of metal Speck Bldg. engineered plans sheets S-1, S-2, S-3, S-4, S-5, S-6; 2 copies of metal bldg. calculations; 2 copies of plan sheets G-1, SD-1, C-1.0, C-2, C-3, C-4, C-5, C-6, C-7, L-1, S0.1, S1.1, S2.1, S2.2, S5.1, S7.1, S7.2, S7.3, A-1.1, A-1.2, A-1.3, A-2.1, A-3.1, A-3.2, A-4.1, A-5.1, A-5.2, A-5.3, A-5.4, A-6.1, A-6.2, A-7.1, A-7.2, A-7.3, P-1.0, P-2.0, P-3.0, P-4.0, M-1, M-2, M-3, M-4, M-5, E1.0, E2.0D, E2.0E, E2.1F, E2.1L, E2.1P, E2.1S, E2.1T, E2.2E, E3.0, E4.0; and 1 copy of as built plans (stamped by Russ Phillips).
Plan resubmittals requested  1/25/2005 DONE
structural corrections sent to architect
Routing Off Site - STRUCTURAL1/19/2005 1/25/2005 FAIL
Contacted PDQ to take steel building plans received on 1/18/04 to outside eng.
Routing Off Site - STRUCTURAL12/20/2004 1/25/2005 FAIL
Contacted PDQ for outside pickup. 1/12/2005 - waiting for metal building plans to continue with review. Corrections sent to architect
Routing - FIRE1/13/2005 1/21/2005 FAIL
Review comments faxed to archtect. Water supply, hydrant, and fire extinguisher issues.
1st review completed  1/21/2005 FAIL
failed public works, plan check and fire.
Routing - PLAN CHECK1/21/2005 1/21/2005 PEND
waiting for resubs
Plan resubmittals received  1/18/2005 DONE
Received three copies of 11 x 17 Butler Manufacturing plans and three copies of struct. calcs and one copy of letter of certification for loading. Routed to Mike O. kmm Contacted BRS requesting 18 x 24 size plans. kmm
Plan resubmittals requested  1/13/2005 DONE
IBC corrections
Plan resubmittals received  1/13/2005 DONE
Per Susan Riggs she received two sets of sheets L-1 taken to Mike Otto.
Routing - PLAN CHECK1/6/2005 1/12/2005 FAIL
corrections sent to architect
Routing - PLANNING12/30/2004 1/6/2005 PASS
cup04-00116 Susan Riggs
Routing - Erosion and Sediment12/29/2004 12/30/2004 PASS
ESC plan approved with attached conditions.
Routing - PLUMBING12/30/2004 12/30/2004 PASS
1. sht p-4 detail A/p-1 extend four inch to cleanout not reduce to three inch 2. sht p-1 vent for grease interceptor should be on downstream side 3. see attached grease interceptor drawing approved by the city of boise 4. two inch water service needs double check backflow 5. need expansion protection 6. water heater needs unions within twelve inches 7. grease line needs cleanout two feet outside building
Routing - PUBLIC WORKS12/20/2004 12/29/2004 FAIL
Revisions required. Contact Brian Murphy at ###-####
Routing - PLANNING Land Div12/20/2004 12/20/2004 PASS
Lot 12, Block 1, Big Sky Subdivision
Application received  12/17/2004  
Recd Pcfee & Taken To Pln CK  12/17/2004 DONE
Plans ACCEPTED BY PLAN TECH  12/17/2004 DONE
Plan routing begun/NEW & ADDTN  12/17/2004 DONE
Routing - PLAN CHECK5/4/2005