Second Notice BLD | 5/25/2006 | 5/25/2006 | 5/25/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/6/2006 | 5/25/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/6/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10967 issued 4-6-06 to Wells Fargo on the 5th floor.
|
BLD-Final | 6/1/2005 | 6/2/2005 | 6/2/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/1/2005 at 8:06:27 AM. Contact: ###-####.ok for perm occ
|
FIRE-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 | P | FAIL |
Forrest France
|
|
|
Door at east exit to corridor must have code approved hardware. All remaining life safety issues are satisfactory.
|
FIRE-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Permanent Occupancy | | 6/1/2005 | 6/1/2005 | | DONE |
|
|
|
|
BLD-Final | 4/13/2005 | 4/13/2005 | 4/13/2005 | P | PART |
Dave Hannah
|
|
|
###-#### - paul Note: please call 1/2 hr prior to inspection ok for temp occ needs other trades to go perm and fire safe corr wall above exit door 4/13/2005 2:35:50 PM
|
FIRE-Final Inspection | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | PART |
Forrest France
|
|
|
Temporary occupancy given per Dave Lokker, pending installation and testing of emergency lighting, and verification of door hardware.
|
FIRE-Final Inspection | 4/8/2005 | 4/11/2005 | 4/11/2005 | A | FAIL |
Troy Cobbley
|
|
|
Fail, install and test emergency lights as marked on plans, verify door hardware.
|
BLD-Final | 4/8/2005 | 4/11/2005 | 4/11/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 4:27:21 PM. Contact: ###-####. needs fire sign off 4/12/2005 8:03:35 AM
|
BLD-Other | 4/1/2005 | 4/4/2005 | 4/4/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/1/2005 at 11:29:27 AM. Contact: ###-####.ceiling grid conf room ok all other grid is exst 4/4/2005 9:48:39 AM
|
BLD-Framing/Rough-in | 3/7/2005 | 3/8/2005 | 3/8/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/7/2005 at 12:47:20 PM. Contact: ###-####.this finishs int wall framing 3/8/2005 9:54:07 AM
|
BLD-Framing/Rough-in | 3/2/2005 | 3/3/2005 | 3/3/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 1:11:21 PM. Contact: ###-####. 3/3/2005 2:23:11 PM
|
Issue PAID IN FULL permit | | | 2/11/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/8/2005 | | DONE |
|
|
|
left mess for arron randall at ###-#### is ready
|
Routing - PLAN CHECK | 1/4/2005 | | 1/5/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/5/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/5/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/5/2005 | | DONE |
|
|
|
|
Telephone call | | | 1/5/2005 | | DONE |
|
|
|
Spoke with Aaron and told him that permit is ready & fees///1/5/05 9:05am BAS
|
Plan assigned to (R_H) | 12/23/2004 | | 1/5/2005 | | PASS |
|
|
|
1/5/2005 07:47:29 RMH - activity updated through activity BLDA022 from case BLD04-02942.
|
Routing - FIRE | 12/28/2004 | | 1/4/2005 | | PASS |
|
|
|
|
1st review completed | | | 1/4/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 12/28/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/23/2004 | | 12/28/2004 | | PEND |
|
|
|
No corrections required by the building department review, routed plans to the fire department on 12/28/04, Permit pending fire departments review.
|
Plans ACCEPTED BY PLAN TECH | | | 12/20/2004 | | DONE |
|
|
|
|
Application received | | | 12/17/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/17/2004 | | |
|
|
|
|
Fee Review-notes | 12/17/2004 | 12/17/2004 | | | |
|
|
|
|