BLD-Final | 9/8/2005 | 9/9/2005 | 9/12/2005 | A | PASS |
Tony Young
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
DOC - Permit Finaled | 9/12/2005 | 9/12/2005 | 9/12/2005 | A | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 9/8/2005 | 9/8/2005 | 9/8/2005 | | BOND |
|
|
|
Rough grading is complete however fine grading and restoration of the disturbed hillside must still be done. For this a $500.00 bond is required. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Energy code compliance | 4/28/2005 | 4/29/2005 | 4/29/2005 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/28/2005 at 6:31:30 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/21/2005 | 4/22/2005 | 4/22/2005 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 5:19:48 PM. Contact: ###-####.
|
BLD-Other | 4/4/2005 | 4/5/2005 | 4/5/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/4/2005 at 3:47:58 PM. Contact: ###-####.
ext shear ok, pending staple conversion from engineer 4/5/2005 12:23:31 PM
|
BLD-Concrete | 2/10/2005 | 2/11/2005 | 2/11/2005 | A | PART |
Tony Young
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Jan Rice
walls ok 2/11/2005 11:34:06 AM
|
BLD-Footing | 2/4/2005 | 2/7/2005 | 2/7/2005 | A | PART |
Tony Young
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Grading Inspection | 2/4/2005 | 2/4/2005 | 2/4/2005 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer.
|
PubWorks Subgrade Approval | 12/21/2004 | 12/21/2004 | 2/4/2005 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
|
Override - Activity Holds | | | 1/28/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/28/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/28/2005 | | DONE |
|
|
|
|
Telephone call | | | 1/28/2005 | | DONE |
|
|
|
called Behrman Homes ###-#### left msg. permit ready & fees
|
Override - Activity Holds | | | 1/28/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 1/28/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 1/28/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/28/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/14/2005 | | 1/27/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 1/25/2005 | | 1/27/2005 | | PASS |
|
|
|
1/27/2005 15:18:42 SAM - activity updated through activity BLDA022 from case BLD04-02955.
|
Case Summary (BLD) | | | 1/25/2005 | | |
|
|
|
|
Plan Review Report | | | 1/25/2005 | | |
|
|
|
|
Plan Reviewer's activity | | | 1/25/2005 | | DONE |
|
|
|
1/25/05 14:00 I called and left a message for Lee H. to call me about his lateral engineering on the back of the house. Plans are on hold.
|
Pending Assignment by DJO | 12/20/2004 | | 1/25/2005 | | DONE |
|
|
|
1/24/2005 15:27:54 MYS - activity updated through activity BLDA183 from case BLD04-02955.
|
Routing - Erosion and Sediment | 1/13/2005 | | 1/14/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 1/14/2005 | | 1/14/2005 | | PASS |
|
|
|
No fire sprinklers required per Dave Miller. (Quail Ridge #6)
|
Routing - PLANNING | 1/12/2005 | | 1/12/2005 | | PASS |
|
|
|
based on information from applicant and discussion (01/11/05) with SRS, TR, and HBS - agreed to pass plan as shown / noted with condition - receive letter from adjacent neighbor indicating no issues with proposed rear patio and grade change to 10' building setback. Letter shall be received prior to permit issue.
|
Routing - PLANNING | 12/21/2004 | | 12/27/2004 | | FAIL |
|
|
|
12/27 - front porch in front setback and covered??
12/29 - left second message for applicant
|
Routing - PUBLIC WORKS | 12/21/2004 | | 12/21/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/20/2004 | | 12/21/2004 | | PASS |
|
|
|
Approved as Category 3
|
Application received | | | 12/20/2004 | | DONE |
|
|
|
|