Case Summary (BLD) | | | 12/28/2005 | | DONE |
|
|
|
|
BLD-Final | 9/22/2005 | 9/23/2005 | 9/23/2005 | A | PASS |
Tom Arcoraci
|
|
|
karen; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
DOC - Permit Finaled | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 9/21/2005 | 9/22/2005 | 9/22/2005 | A | NR |
Mike Jordan
|
|
|
karen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Note: please call for code number. Needs electrical final
|
BLD-Energy code compliance | 7/10/2005 | 7/11/2005 | 7/11/2005 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/10/2005 at 5:44:55 PM. Contact: ###-####. Homeowner to install vapor barrier on walls.
|
BLD-Framing/Rough-in | 7/10/2005 | 7/11/2005 | 7/11/2005 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/10/2005 at 5:43:21 PM. Contact: ###-####. all items on c/n repaired.
|
BLD-Framing/Rough-in | 6/28/2005 | 6/29/2005 | 6/29/2005 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/28/2005 at 2:17:37 PM. Contact: ###-####. cn posted
|
BLD-Framing/Rough-in | 6/16/2005 | 6/17/2005 | 6/17/2005 | P | NR |
Tom Arcoraci
|
|
|
josh ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie left c/notice
|
BLD-Foundation | 2/23/2005 | 2/24/2005 | 2/24/2005 | A | PASS |
Lane Manuel
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
stemwalls, and electrode ok. #4 rebar 2/24/2005 9:48:11 AM
|
BLD-Footing | 2/22/2005 | 2/23/2005 | 2/23/2005 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/22/2005 at 2:07:59 PM. Contact: ###-####.
footings ok 2/23/2005 9:36:24 AM
|
BLD-Footing | 2/22/2005 | 2/23/2005 | 2/23/2005 | A | DONE |
Lane Manuel
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
inspection called in twice 2/23/2005 9:36:51 AM
|
Issue PAID IN FULL permit | | | 2/22/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/17/2005 | | |
|
|
|
|
Plan Review Report | | | 2/17/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/17/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/16/2005 | | 2/17/2005 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 2/17/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/17/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/17/2005 | | DONE |
|
|
|
Spoke with Carrie and told her that permit is ready & fees////2/17/05 2:50pm BAS
|
Plan assigned to (SAM) | 1/18/2005 | | 2/17/2005 | | PASS |
|
|
|
2/17/2005 09:36:34 SAM - activity updated through activity BLDA022 from case BLD04-02956.
|
Plan Reviewer's activity | | | 2/2/2005 | | DONE |
|
|
|
10:00 I called and left Josh a message. I let him know that I still need a roof framing plan with beam sizes. Also that adding two feet to the structure put him over the setbacks, NOT okay with P&Z.
|
Plan Reviewer's activity | | | 1/18/2005 | | DONE |
|
|
|
1/18/05 14:25 I called and talked to Jarred Price. He is going to have his forman come meet with me about the plans. Plans are being rejected due to the number of things missing.
|
Pending Assignment by DJO | 12/20/2004 | | 1/18/2005 | | DONE |
|
|
|
1/18/2005 11:27:18 SAM - activity updated through activity BLDA183 from case BLD04-02956.
|
Routing - PLAN CHECK | 1/10/2005 | | 1/18/2005 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 1/10/2005 | | 1/10/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 1/10/2005 | | 1/10/2005 | | PASS |
|
|
|
Lineweight on site plan is difficult to read. Building MUST meet the setbacks as the dimensions indicated. Based on the floor-plan dimensions, there is adequate room.
|
Routing - PLANNING | 1/4/2005 | | 1/4/2005 | | FAIL |
|
|
|
Applicant brought revised drawings to the front counter. They still fail to meet the setback requirements. Went through all applicable setback requirements. CER
|
Routing - PLANNING | 12/21/2004 | | 12/22/2004 | | FAIL |
|
|
|
Received new site plan. Driveway does not meet minimum sep. of 50' from the intersection. Left telephone message w/ applicant at 8:15 a.m. CER
|
Routing - PLANNING | 12/20/2004 | | 12/21/2004 | | FAIL |
|
|
|
Site plan is inadequate, and from the information submitted, it appears to not meet the City's R-1B setbacks. Left message w/ applican'ts receptionist at 9:00 a.m. today. CER
|
Application received | | | 12/20/2004 | | |
|
|
|
|