Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-02970
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 1835 W COMMERCE AVE
Project NameTrimco Millwork
Customer Number 
ePlanReviewNo
Description
Trimco Mill Works Addition - To add 15,000 sq.ft of new interior storage area and enclose 3,840 sq.ft. of covered exterior storage area to an existing 38,942 sq.ft. storage, office and wharehouse building. Note this building is being considered as a unlimited area building with 60' of yards on all sides around the building. A separate permit and bond will be required to demo the existing structure to the west of this building. Note: This building is fully fire sprinklered for area increase to meet the requirements for an unlimited area building. All construction per the approved plans and attached comment list. MJP DRH04-00203
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD4/14/20064/14/20067/27/2006 DONE
Second Notice has not been responded to.
Second Notice BLD3/29/20063/29/20064/14/2006 DONE
First Notice has not been responded to.
First Notice 3/7/20063/29/2006 DONE
Permanent occupancy  3/7/2006 DONE
Perm. Occ. Cert. # 10928 issued 3-7-06 to Trimco Mill Works.
BLD-Final2/22/20062/22/20062/22/2006PPASS
DetailsJim Storey
Tim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
Code Occupancy Approval2/9/20062/9/20062/9/2006PPASS
DetailsDena Gambrel
Permanent Occupancy 2/9/20062/9/2006 DONE
Details
BLD-Final2/3/20062/6/20062/6/2006AFAIL
DetailsJim Storey
Jim -- for permanent occupancy; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Aging Inspection1/30/20061/30/20062/3/2006 FAIL
DetailsJim Storey
notafied to requist final insp. provide all docs.
FIRE-Final Inspection11/28/200511/29/200511/30/2005APASS
DetailsForrest France
Fire life safety approved on 6/13/05.
FIRE-Final Inspection11/22/200511/23/200511/23/2005ACANC
DetailsForrest France
No time available for this inspection today, to be rescheduled per agreement.
PubWorks Occupancy Approval11/23/200511/23/200511/23/2005 DONE
Drainage project complete, signed permanent occupancy 11/23/05. R.Rokovitz
BLD-Aging Inspection11/14/200511/14/200511/14/2005 PASS
DetailsJim Storey
wip
BLD-Aging Inspection9/12/20059/12/20059/12/2005 PASS
DetailsJim Storey
wip
BLD-Foundation7/11/20057/11/20057/11/2005PPASS
DetailsJim Storey
robert; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing7/7/20057/7/20057/7/2005PPASS
DetailsJim Storey
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
FIRE-Final Inspection6/13/20056/13/20056/13/2005PPASS
DetailsForrest France
Fire life safety passed inspection. Sign off card for CO not available on site at the time of inspection, notified the general contractor.
BLD-Final6/9/20056/10/20056/10/2005PNR
DetailsJim Storey
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection6/9/20056/10/20056/10/2005AFAIL
DetailsForrest France
Provide building address numbers of approved size, provide documentation of current annual inspection on existing fire sprinkler systems in the attatched building, provide fire ext. at bay door as shown on plans.
BLD-Conference4/13/20054/14/20054/14/2005APASS
DetailsJim Storey
scott --call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieresubmit accessable route.
BLD-Footing4/13/20054/13/20054/13/2005PPART
DetailsTom Arcoraci
re-bar slab inspection please///jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore si 4/13/2005 2:06:27 PM
BLD-Foundation3/23/20053/24/20053/24/2005PPART
DetailsJim Storey
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore si 3/24/2005 2:06:31 PM
BLD-Footing3/15/20053/17/20053/17/2005APASS
DetailsJim Storey
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice rebar ok pending special insp. report.
Issue PAID IN FULL permit  2/25/2005  
Inspection Record Card- Bld  2/18/2005 DONE
Print Occupancy Form  2/18/2005 DONE
Permit Ready to Issue  2/18/2005 DONE
Telephone call  2/18/2005 DONE
tlk to gail ###-#### that their permit and fees are ready to be picked up
Routing - PLAN CHECK2/16/2005 2/17/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/17/2005 DONE
Print Pending Permit.LaserJet4  2/17/2005 DONE
Case Summary (BLD)  2/17/2005 DONE
Plan assigned to (M_P)12/23/2004 2/17/2005 PASS
2/17/2005 13:25:30 M_P - activity updated through activity BLDA022 from case BLD04-02970.
Routing Off Site - STRUCTURAL2/11/2005 2/16/2005 PASS
Called PDQ for pick -up
Routing - PLAN CHECK2/15/2005 2/16/2005  
Routing to ESC
Routing - Erosion and Sediment2/16/2005 2/16/2005 PASS
ESC plan approved with attached conditions.
Routing - FIRE2/11/2005 2/15/2005 PASS
resubmittal acceptable. revised comments faxed to architect.
Routing - PLANNING2/10/2005 2/11/2005 PASS
Approved per DRH04-00203 and letter dated January 11, 2005.
Plan resubmittals received  2/7/2005 DONE
Received Transmittal Letter, 2 Letters to Sam R. , 2 Letters to Mike P., 2 Unite Water sheets , 3 Certificate of Accreditation, 2 Letters to Sara S. , 3 Structural Review Comments, 2 Copys of sheets SP-1,A-0,A-1,E-1, & 3 Copys of sheet S-1 Taken to Mike P.
Routing - FIRE1/14/2004 1/21/2005 FAIL
lacks hydrant, PFE, storage info. Review faxed to architect.
1st review completed  1/21/2005 FAIL
failed plan check, planning, ESC and Fire.
Case Summary (BLD)  1/14/2005  
Routing Off Site - STRUCTURAL12/23/2004 1/14/2005 FAIL
Contacted PDQ to take plans to outside engineering. kmm
Plan review failed second review required by outside engineering firm.
Routing - PLAN CHECK1/4/2005 1/14/2005 FAIL
Plan review completed, sent correction report to contractor requesting additional information be submitted for further review prior to issuing permit.
Plan resubmittals received  1/5/2005 DONE
Received 2 S.W.P.P. & Erosion & Sediment Control Plan and 2 Copys of sheet ES1.0 Taken to Mike P.
Routing - PLANNING12/29/2004 1/4/2005 FAIL
drh04-00203 - Applicant must provide a letter stating that the project is going to be phased and the timeline. (The phasing deals with the landscape and new parking. This information is not included in these documents.) Once the letter is received, DR can sign off.
Routing - PUBLIC WORKS12/23/2004 12/29/2004 PASS
Routing - Erosion and Sediment12/29/2004 12/29/2004 FAIL
ESC plan waiver request denied. Informed Mr. Jensen with Van Auker Construction.
Routing - PLANNING Land Div12/23/2004 12/23/2004 PASS
Parcel approved by ROS 5684.
Plans ACCEPTED BY PLAN TECH  12/23/2004 DONE
Plan routing begun/NEW & ADDTN  12/23/2004 DONE
Application received  12/22/2004  
Recd Pcfee & Taken To Pln CK  12/22/2004  
Fee Review-notes12/22/200412/22/2004