Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/16/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice BLD | 5/20/2005 | 5/20/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/29/2005 | 5/20/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 4/29/2005 | 4/29/2005 | | DONE |
|
|
|
|
BLD-Final | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | PASS |
Jim Sly
|
|
|
per your request Internet Inspection Request from: Barbara Moore OK for Perm Occ :) 4/29/2005 10:33:51 AM
|
Permanent occupancy | | | 4/29/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10565 issued 4-29-05 to Midwesst Floor covering.
|
CHANGE STATUS TO (ISS) | | | 4/28/2005 | | DONE |
|
|
|
pe Jim sly///4/28/05 BAS
|
FIRE-Final Inspection | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
FIRE-Final Inspection | 4/20/2005 | 4/21/2005 | 4/21/2005 | A | FAIL |
Forrest France
|
|
|
Remove thumbturn from main office exit door. Flammable liquid storage room needs doors installed for hardware verification.
|
BLD-Framing/Rough-in | 4/12/2005 | 4/13/2005 | 4/13/2005 | A | PART |
Jim Sly
|
|
|
jim Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Grid OK. 4/13/2005 9:16:47 AM
|
Additional plans submitted | | | 3/22/2005 | | PASS |
|
|
|
Received required delayed submittal for the required non-sparking exhaust fan and emergency power supply for the flammable liquids storage room. Plans approved as annotated in "red". Faxed to G. Jensen, Van Auker. One copy sent to T. Cobbley for Fire inspection and one to Records for scanning.
|
BLD-Energy code compliance | 3/18/2005 | 3/18/2005 | 3/18/2005 | P | PASS |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 3/17/2005 | 3/17/2005 | 3/17/2005 | P | PART |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore int walls ok to insulate shear on ext walls on office ok to cover ok to insulate office area 3/17/2005 5:20:09 PM
|
Plan resubmittals received | | | 3/10/2005 | | DONE |
|
|
|
Some information on the H-3 occupancy has been provided and will be forwarded to the Fire Department.
|
BLD-Framing/Rough-in | 3/8/2005 | 3/8/2005 | 3/8/2005 | P | FAIL |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N Eng to approve Simpson LBV316 joist hangers with 8 nails only ..... Complete shear walls and recall. Check sill fastening (8" oc) 3/8/2005 4:22:18 PM
|
BLD-Concrete | 2/28/2005 | 2/28/2005 | 2/28/2005 | P | PART |
Lane Manuel
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice
2 interior piers ok 2/28/2005 3:04:10 PM
|
Issue PAID IN FULL permit | | | 2/25/2005 | | |
|
|
|
|
(F) Reprint permit | | | 2/25/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/24/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/24/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/24/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/24/2005 | | DONE |
|
|
|
left mess for gayle jensen at ###-#### permit is ready
|
Plan assigned to (JCB) | 12/23/2004 | | 2/23/2005 | | PASS |
|
|
|
2/23/2005 16:16:38 JCB - activity updated through activity BLDA022 from case BLD04-02971.
|
Routing - PLAN CHECK | 2/17/2005 | | 2/23/2005 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2005 | | PASS |
|
|
|
|
Telephone call | | | 2/22/2005 | | |
|
|
|
Called Gayle Jensen concerning the classification of Storage Room #102 as an H-3 Occupancy by the Fire Dept. Discussed some issues and rated assemblies. Gayle is requesting the compliance with the Fire Code with this room be done as a deferred submittal (that will be provided through the office for quick review) which is acceptable to Sam Rogers of Fire Plan Review. Ventilation will go through the exterior wall and have emergency power. Spill control will be provided. He is also looking into other options for the rated door or doors into this room and said he would get back to me.
|
Routing - FIRE | 2/16/2005 | | 2/17/2005 | | PASS |
|
|
|
adequate information received from Midwest Flooring to allow approval of this permit subject to subsequent submittal of the flammable liquid storage room design details. Review faxed to archtiect and voice message left for him to call me to discuss our approach and any questions. Van Auker asked for copy-faxed to them also.
|
Routing - FIRE | 2/11/2005 | | 2/15/2005 | | FAIL |
|
|
|
everything is okay except for IFC classification of the flammable adhesives. Spoke with archtect and M. Larrabee who will fax the MSDS sheets to me for the brusable and spray grades. Holding plans for the fax to arrive today or tomorrow.
|
Routing - PLAN CHECK | 1/14/2005 | | 2/11/2005 | | PEND |
|
|
|
When approved by Fire Dept. permit can be issued. Plans to route to Fire Dept. to review resubmittals.
|
Plan resubmittals received | | | 2/7/2005 | | DONE |
|
|
|
Received Transmittal Letter, 2 Letters to Jason b. & 2 Letters to Sam R. , 2 Response to Items 39 & 40 1- 8 1/2 x 11 Floor Plan , & 2 Copys of sheets SP-1,A-1,,A-3 Taken to Jason B.
|
Routing - FIRE | 1/10/2005 | | 1/14/2005 | | FAIL |
|
|
|
Lacks storage , fire extinguisher and exit signage/lighting details. Review faxed to architect.
|
1st review completed | | | 1/14/2005 | | FAIL |
|
|
|
failed plan check and fire.
|
Routing - PLAN CHECK | 12/28/2004 | | 1/10/2005 | | FAIL |
|
|
|
Plan review report sent and faxed to Van Auker Construction. Plan resubmittals and written response required for further review. Plans to route to Fire Dept.
|
Routing - PUBLIC WORKS | 12/23/2004 | | 12/28/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/23/2004 | | |
|
|
|
|
Application received | | | 12/22/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/22/2004 | | |
|
|
|
|
Fee Review-notes | 12/22/2004 | 12/22/2004 | | | |
|
|
|
|