Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-02971
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 12450 W EXECUTIVE DR
Project NameVAN AUKER CLOVERDALE #10
Customer Number 
ePlanReviewNo
Description
(MIDWEST FLOOR COVERING)(VAN AUKER CLOVERDALE #10 BLDG) New tenant to occupy entire 26,400 sq. ft. vacant shell building for warehouse use and constructing a new 1,660 sq. ft. accessory office area with light storage mezzanine above and a small 144 sq. ft. H-3 occupancy flammable liquid storage room all per approved plans and engineering. Work to include two new interior square pad footings, new steel column and girder, new wood column, new floor joists and sheathing, new stairway with handrails and guard, new guard at light storage mezzanine, new one-hour rated fire barrier walls with 3/4 hour rated doors and one-hour rated floor-ceiling assembly at H-3 occupancy, some new interior walls and doors, new interior finish, new suspended ceiling, two new accessible restrooms, fire sprinkler work, new mechanical work including a new furnace, new plumbing, and new electrical work. Special Inspection is required for steel construction (fabrication/welding), fabrication process of wood structural elements on premises of fabricator's shop, soils, and epoxy/adhesive anchor installations. Deferred submittal for compliance with the IFC for the H-3 flammable liquid storage room will be submitted into the office for approval prior to installation. Racking in the warehouse will be done under a separate permit. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/16/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice BLD5/20/20055/20/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 4/29/20055/20/2005 DONE
Permanent Occupancy 4/29/20054/29/2005 DONE
Details
BLD-Final4/28/20054/29/20054/29/2005APASS
DetailsJim Sly
per your request Internet Inspection Request from: Barbara Moore OK for Perm Occ :) 4/29/2005 10:33:51 AM
Permanent occupancy  4/29/2005 DONE
Perm. Occ. Cert. # 10565 issued 4-29-05 to Midwesst Floor covering.
CHANGE STATUS TO (ISS)  4/28/2005 DONE
pe Jim sly///4/28/05 BAS
FIRE-Final Inspection4/22/20054/25/20054/25/2005APASS
DetailsTroy Cobbley
Fire life safety finaled
FIRE-Final Inspection4/20/20054/21/20054/21/2005AFAIL
DetailsForrest France
Remove thumbturn from main office exit door. Flammable liquid storage room needs doors installed for hardware verification.
BLD-Framing/Rough-in4/12/20054/13/20054/13/2005APART
DetailsJim Sly
jim Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Grid OK. 4/13/2005 9:16:47 AM
Additional plans submitted  3/22/2005 PASS
Received required delayed submittal for the required non-sparking exhaust fan and emergency power supply for the flammable liquids storage room. Plans approved as annotated in "red". Faxed to G. Jensen, Van Auker. One copy sent to T. Cobbley for Fire inspection and one to Records for scanning.
BLD-Energy code compliance3/18/20053/18/20053/18/2005PPASS
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in3/17/20053/17/20053/17/2005PPART
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore int walls ok to insulate shear on ext walls on office ok to cover ok to insulate office area 3/17/2005 5:20:09 PM
Plan resubmittals received  3/10/2005 DONE
Some information on the H-3 occupancy has been provided and will be forwarded to the Fire Department.
BLD-Framing/Rough-in3/8/20053/8/20053/8/2005PFAIL
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N Eng to approve Simpson LBV316 joist hangers with 8 nails only ..... Complete shear walls and recall. Check sill fastening (8" oc) 3/8/2005 4:22:18 PM
BLD-Concrete2/28/20052/28/20052/28/2005PPART
DetailsLane Manuel
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice
2 interior piers ok 2/28/2005 3:04:10 PM
Issue PAID IN FULL permit  2/25/2005  
(F) Reprint permit  2/25/2005 DONE
Permit Ready to Issue  2/24/2005 DONE
Inspection Record Card- Bld  2/24/2005 DONE
Print Occupancy Form  2/24/2005 DONE
Telephone call  2/24/2005 DONE
left mess for gayle jensen at ###-#### permit is ready
Plan assigned to (JCB)12/23/2004 2/23/2005 PASS
2/23/2005 16:16:38 JCB - activity updated through activity BLDA022 from case BLD04-02971.
Routing - PLAN CHECK2/17/2005 2/23/2005 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  2/23/2005 PASS
Telephone call  2/22/2005  
Called Gayle Jensen concerning the classification of Storage Room #102 as an H-3 Occupancy by the Fire Dept. Discussed some issues and rated assemblies. Gayle is requesting the compliance with the Fire Code with this room be done as a deferred submittal (that will be provided through the office for quick review) which is acceptable to Sam Rogers of Fire Plan Review. Ventilation will go through the exterior wall and have emergency power. Spill control will be provided. He is also looking into other options for the rated door or doors into this room and said he would get back to me.
Routing - FIRE2/16/2005 2/17/2005 PASS
adequate information received from Midwest Flooring to allow approval of this permit subject to subsequent submittal of the flammable liquid storage room design details. Review faxed to archtiect and voice message left for him to call me to discuss our approach and any questions. Van Auker asked for copy-faxed to them also.
Routing - FIRE2/11/2005 2/15/2005 FAIL
everything is okay except for IFC classification of the flammable adhesives. Spoke with archtect and M. Larrabee who will fax the MSDS sheets to me for the brusable and spray grades. Holding plans for the fax to arrive today or tomorrow.
Routing - PLAN CHECK1/14/2005 2/11/2005 PEND
When approved by Fire Dept. permit can be issued. Plans to route to Fire Dept. to review resubmittals.
Plan resubmittals received  2/7/2005 DONE
Received Transmittal Letter, 2 Letters to Jason b. & 2 Letters to Sam R. , 2 Response to Items 39 & 40 1- 8 1/2 x 11 Floor Plan , & 2 Copys of sheets SP-1,A-1,,A-3 Taken to Jason B.
Routing - FIRE1/10/2005 1/14/2005 FAIL
Lacks storage , fire extinguisher and exit signage/lighting details. Review faxed to architect.
1st review completed  1/14/2005 FAIL
failed plan check and fire.
Routing - PLAN CHECK12/28/2004 1/10/2005 FAIL
Plan review report sent and faxed to Van Auker Construction. Plan resubmittals and written response required for further review. Plans to route to Fire Dept.
Routing - PUBLIC WORKS12/23/2004 12/28/2004 PASS
Plans ACCEPTED BY PLAN TECH  12/23/2004  
Application received  12/22/2004  
Recd Pcfee & Taken To Pln CK  12/22/2004  
Fee Review-notes12/22/200412/22/2004