Permit Information
Permit NumberBLD04-02978
StatusFinaled
Name STERLING SAVINGS BANK
Site Address 420 W MAIN ST Unit: 101
Project NameVELTEX BLDG-1ST FLR
Customer Number 
ePlanReviewNo
Description
(STERLING SAVINGS BANK)(VELTEX BLDG-1ST FLR) To finish approximately 5,494 sq.ft. of interior tenant space for a bank. Work to include relocation of existing front entry door and add a new exterior door at entry, install interior partition walls and cabinets, counter tops and bank vault. All construction per the approved plans and attached comment list. NOTE: This building is fully fire sprinklered for story increase. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/22/2009  
Third Notice BLD12/6/200512/6/200512/15/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice BLD5/20/20055/20/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 4/25/20055/20/2005 DONE
BLD-Final4/25/20054/25/20054/25/2005PPASS
DetailsDave Hannah
Don, ###-#### needs elec hook ups and dissconnections
Permanent Occupancy 4/25/20054/25/2005 DONE
Details
Permanent occupancy UNPAID FEE  4/25/2005 DONE
Perm. Occ. Cert. # 10544 issued 4-25-05 to Sterling Savings Bank in the Veltex Bldg.
FIRE-Final Inspection4/21/20054/22/20054/22/2005APASS
DetailsTroy Cobbley
fire life finaled
BLD-Final4/20/20054/21/20054/21/2005PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/20/2005 at 11:08:13 AM. Contact: ###-####. needs fire life safty sign off and change locks front and back exit doors 4/21/2005 2:19:27 PM
FIRE-Final Inspection4/21/20054/21/20054/21/2005AFAIL
DetailsForrest France
Keyed hardware only allowed on one exterior door. Remaining doors in main entry/exit must have approved hardware. Pocket door on work room must have approved hardware. Approved hardware req. on teller gate.
FIRE-Final Inspection4/15/20054/18/20054/18/2005AFAIL
DetailsForrest France
Fail inspection. Keyed hardware is only allowed on one door. Main entry/exit has three. See building review note #14 and fire review note #6. Remove manual flush bolts from conference room doors, see bld. review note #15. Duct detectors are mounted o
FIRE-Sprinkler Rough-in4/14/20054/15/20054/15/2005APASS
DetailsTroy Cobbley
Ceilings and pendant sprinklers added in the three rooms that previously did not have ceilings. Sprinklers in these rooms ok to cover
BLD-Other3/31/20054/1/20054/1/2005PPART
DetailsDave Hannah
Don, ###-#### would like a ceiling inspectionok to cover front lobby area 4/1/2005 1:20:18 PM
BLD-Framing/Rough-in2/17/20052/18/20052/18/2005APASS
DetailsDave Hannah
Don, ###-####
Issue PAID IN FULL permit  2/3/2005 DONE
Telephone call  1/12/2005 DONE
will bring down in money
Inspection Record Card- Bld  1/11/2005 DONE
Print Occupancy Form  1/11/2005 DONE
Permit Ready to Issue  1/11/2005 DONE
Telephone call  1/11/2005 DONE
left mess for marvin meyer at ###-#### is ready
Routing - PLAN CHECK1/7/2005 1/10/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  1/10/2005 DONE
Print Pending Permit.LaserJet4  1/10/2005 DONE
Case Summary (BLD)  1/10/2005 DONE
Plan assigned to (M_P)12/23/2004 1/10/2005 PASS
1/10/2005 08:48:20 M_P - activity updated through activity BLDA022 from case BLD04-02978.
Routing - FIRE1/4/2005 1/7/2005 PASS
1st review completed  1/7/2005 PASS
Routing - PLAN CHECK12/28/2004 1/4/2005 PEND
Waiting for others to approve prior to issuing permit.
Routing - PUBLIC WORKS12/23/2004 12/28/2004 PASS
Application received  12/23/2004  
Recd Pcfee & Taken To Pln CK  12/23/2004  
Plans ACCEPTED BY PLAN TECH  12/23/2004 DONE
Fee Review-notes12/23/200412/23/2004