Case Summary (BLD) | | | 1/22/2009 | | |
|
|
|
|
Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/15/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice BLD | 5/20/2005 | 5/20/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/25/2005 | 5/20/2005 | | DONE |
|
|
|
|
BLD-Final | 4/25/2005 | 4/25/2005 | 4/25/2005 | P | PASS |
Dave Hannah
|
|
|
Don, ###-#### needs elec hook ups and dissconnections
|
Permanent Occupancy | | 4/25/2005 | 4/25/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 4/25/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10544 issued 4-25-05 to Sterling Savings Bank in the Veltex Bldg.
|
FIRE-Final Inspection | 4/21/2005 | 4/22/2005 | 4/22/2005 | A | PASS |
Troy Cobbley
|
|
|
fire life finaled
|
BLD-Final | 4/20/2005 | 4/21/2005 | 4/21/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/20/2005 at 11:08:13 AM. Contact: ###-####. needs fire life safty sign off and change locks front and back exit doors 4/21/2005 2:19:27 PM
|
FIRE-Final Inspection | 4/21/2005 | 4/21/2005 | 4/21/2005 | A | FAIL |
Forrest France
|
|
|
Keyed hardware only allowed on one exterior door. Remaining doors in main entry/exit must have approved hardware. Pocket door on work room must have approved hardware. Approved hardware req. on teller gate.
|
FIRE-Final Inspection | 4/15/2005 | 4/18/2005 | 4/18/2005 | A | FAIL |
Forrest France
|
|
|
Fail inspection. Keyed hardware is only allowed on one door. Main entry/exit has three. See building review note #14 and fire review note #6. Remove manual flush bolts from conference room doors, see bld. review note #15. Duct detectors are mounted o
|
FIRE-Sprinkler Rough-in | 4/14/2005 | 4/15/2005 | 4/15/2005 | A | PASS |
Troy Cobbley
|
|
|
Ceilings and pendant sprinklers added in the three rooms that previously did not have ceilings. Sprinklers in these rooms ok to cover
|
BLD-Other | 3/31/2005 | 4/1/2005 | 4/1/2005 | P | PART |
Dave Hannah
|
|
|
Don, ###-#### would like a ceiling inspectionok to cover front lobby area 4/1/2005 1:20:18 PM
|
BLD-Framing/Rough-in | 2/17/2005 | 2/18/2005 | 2/18/2005 | A | PASS |
Dave Hannah
|
|
|
Don, ###-####
|
Issue PAID IN FULL permit | | | 2/3/2005 | | DONE |
|
|
|
|
Telephone call | | | 1/12/2005 | | DONE |
|
|
|
will bring down in money
|
Inspection Record Card- Bld | | | 1/11/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/11/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/11/2005 | | DONE |
|
|
|
|
Telephone call | | | 1/11/2005 | | DONE |
|
|
|
left mess for marvin meyer at ###-#### is ready
|
Routing - PLAN CHECK | 1/7/2005 | | 1/10/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2005 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/10/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/10/2005 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 12/23/2004 | | 1/10/2005 | | PASS |
|
|
|
1/10/2005 08:48:20 M_P - activity updated through activity BLDA022 from case BLD04-02978.
|
Routing - FIRE | 1/4/2005 | | 1/7/2005 | | PASS |
|
|
|
|
1st review completed | | | 1/7/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/28/2004 | | 1/4/2005 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Routing - PUBLIC WORKS | 12/23/2004 | | 12/28/2004 | | PASS |
|
|
|
|
Application received | | | 12/23/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/23/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/23/2004 | | DONE |
|
|
|
|
Fee Review-notes | 12/23/2004 | 12/23/2004 | | | |
|
|
|
|