Telephone call | | | 1/27/2006 | | DONE |
|
|
|
tlk to glenn walker ###-#### about no ele, plum, mech values - said will fax to me 10:47 am cmc
|
Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/16/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice BLD | 9/29/2005 | 9/29/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/16/2005 | 9/29/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 8/11/2005 | | |
|
|
|
Perm. Occ. Cert. # 10690 issued 8-11-05 to the Lee Pesky Learning Center.
|
BLD-Final | 8/10/2005 | 8/10/2005 | 8/10/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/10/2005 at 10:04:09 AM. Contact: ###-####.
|
Code Occupancy Approval | 8/10/2005 | 8/10/2005 | 8/10/2005 | P | PASS |
Dena Gambrel
|
|
|
|
Permanent Occupancy | | 8/9/2005 | 8/9/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/5/2005 | 8/5/2005 | 8/5/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 8/4/2005 | 8/4/2005 | 8/4/2005 | P | FAIL |
Forrest France
|
|
|
Provide building street address numbers per plan review note # 1, repair exit discharge light at basement level, provide max occupant load sign in assembly area per note # 8, mount provided fire ext. in basement as discussed, repair remote annunciators at first floor level and test all HVAC detectors.
|
BLD-Other | 6/22/2005 | 6/24/2005 | 6/24/2005 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/22/2005 at 7:55:37 AM. Contact: ###-####.ceilling ok fire stopping misc repair and fd access
|
BLD-Framing/Rough-in | 5/6/2005 | 5/9/2005 | 5/9/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/6/2005 at 4:20:17 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/5/2005 | 5/6/2005 | 5/6/2005 | A | CANC |
Jim Storey
|
|
|
late am please////JR; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 5/4/2005 | 5/5/2005 | 5/5/2005 | P | CANC |
Jim Storey
|
|
|
prefer late please///jr; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Aging Inspection | 5/3/2005 | 5/3/2005 | 5/3/2005 | | PASS |
Jim Storey
|
|
|
wip
|
Issue PAID IN FULL permit | | | 2/1/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/28/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/28/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/28/2005 | | DONE |
|
|
|
|
Telephone call | | | 1/28/2005 | | DONE |
|
|
|
tlk to glen walker - ###-#### that permit and fees are ready to be picked up
|
Plan assigned to (CJW) | 12/23/2004 | | 1/27/2005 | | PASS |
|
|
|
1/27/2005 10:41:18 CJW - activity updated through activity BLDA022 from case BLD04-02979.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/13/2005 | | 1/27/2005 | | PASS |
|
|
|
Drawings approved, with clarifications, after the resubmittal review.
|
Plan resubmittals received | | | 1/26/2005 | | DONE |
|
|
|
Received Transmittal Letter, 1 Letter, 2 Structural Calcs & 2 Copys of sheets T0.00, A1.00 Taken to Carl W.
|
Routing - FIRE | 1/10/2005 | | 1/13/2005 | | PASS |
|
|
|
Review comments faxed to architect.
|
1st review completed | | | 1/13/2005 | | FAIL |
|
|
|
failed plan check
|
Routing - PLUMBING | 1/5/2005 | | 1/10/2005 | | PASS |
|
|
|
increase waste to 4" after 3rd toilet.
|
Routing - PLAN CHECK | 12/28/2004 | | 1/5/2005 | | FAIL |
|
|
|
The IBC plan review was started on January 3, 2005 and was finished on January 5, 2004. A response was required from the architect. See the plan review report.
|
Routing - PUBLIC WORKS | 12/23/2004 | | 12/28/2004 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 12/23/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/23/2004 | | DONE |
|
|
|
|
Application received | | | 12/23/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 12/23/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/23/2004 | | |
|
|
|
|
Fee Review-notes | 12/23/2004 | 12/23/2004 | | | |
|
|
|
|