BLD-Final | 8/12/2005 | 8/15/2005 | 8/15/2005 | A | PASS |
Tony Young
|
|
|
bob smith; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
DOC - Permit Finaled | 8/15/2005 | 8/15/2005 | 8/15/2005 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Conference | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | PART |
Tony Young
|
|
|
meeting with Terry Records at 10 if you can there on site////bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore,,, via, phone,, scheduled a final for monday am
|
BLD-Grading Inspection | 8/12/2005 | 8/12/2005 | 8/12/2005 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 5/27/2005 | 5/31/2005 | 5/31/2005 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/27/2005 at 11:45:44 AM.
|
BLD-Framing/Rough-in | 5/24/2005 | 5/25/2005 | 5/25/2005 | P | PASS |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
ok to insulate,, make sure rim openings are left open on cantalevier to help plumbing from freezing,, under master bed/bath 5/25/2005 3:16:33 PM
|
BLD-Framing/Rough-in | 5/24/2005 | 5/24/2005 | 5/24/2005 | P | FAIL |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | NR |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
call ziggy after inspection ,, no planson site 5/20/2005 11:09:12 AM
|
BLD-Framing/Rough-in | 5/20/2005 | 5/20/2005 | 5/20/2005 | P | NR |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
call ziggy after inspection
|
BLD-Foundation | 3/21/2005 | 3/21/2005 | 3/21/2005 | P | PART |
Tony Young
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
wip,, ok so far 3/21/2005 1:39:41 PM
|
BLD-Footing | 3/15/2005 | 3/16/2005 | 3/16/2005 | A | PART |
Tony Young
|
|
|
Donnie; Phone #: ###-#### Internet Inspection Request from: Jan Rice
wip 3/16/2005 10:22:46 AM
|
BLD-Grading Inspection | 3/15/2005 | 3/15/2005 | 3/15/2005 | | DONE |
|
|
|
footing subgrade approved by the geotechnical engineer
|
PubWorks Subgrade Approval | 1/14/2005 | 1/14/2005 | 3/15/2005 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Boise Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
|
Override - Activity Holds | 1/1/1900 | 1/1/1900 | 3/15/2005 | | |
|
|
|
|
Override - Activity Holds | 1/1/1900 | 1/1/1900 | 3/15/2005 | | |
|
|
|
|
Override - Activity Holds | | | 3/8/2005 | | |
|
|
|
|
Issue & PRINT permit | | | 3/8/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 3/7/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/7/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/7/2005 | | |
|
|
|
|
Override - Activity Holds | | | 3/7/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 3/7/2005 | | |
|
|
|
|
Telephone call | | | 3/7/2005 | | DONE |
|
|
|
tlk to kathy smith ###-#### that permit and fees are ready to be picked up
|
Routing - PLAN CHECK | 2/24/2005 | | 3/6/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 3/6/2005 | | |
|
|
|
|
Plan Review Report | | | 3/6/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 2/18/2005 | | 3/6/2005 | | PASS |
|
|
|
3/6/2005 15:05:27 SAM - activity updated through activity BLDA022 from case BLD04-02982.
|
Routing - Erosion and Sediment | 2/24/2005 | | 2/24/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 2/1/2005 | | 2/24/2005 | | FAIL |
|
|
|
Waiting to hear from engineer. Routed to Erosion.
|
Routing - FIRE | 1/31/2005 | | 2/1/2005 | | PASS |
|
|
|
No fire sprinklers required.
|
Routing - PLANNING | 1/14/2005 | | 1/31/2005 | | PASS |
|
|
|
Per CFH05-0004 Trellis is not approved in front of home -- must be behind or apply for CUP.
|
Routing - Erosion and Sediment | 1/31/2005 | | 1/31/2005 | | FAIL |
|
|
|
ESC plan failed. Contacted PD. Checklist completed.
|
Routing - PUBLIC WORKS | 1/14/2005 | | 1/14/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 1/14/2005 | | 1/14/2005 | | PASS |
|
|
|
Approved as Category 1
|
Application received | | | 12/23/2004 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/23/2004 | | 12/23/2004 | | FAIL |
|
|
|
Grading plan must be revised and setback from slope at rear must be reduced by engineer or grading modified to provide prescriptive setback.
|