Second Notice BLD | 9/14/2005 | 9/14/2005 | 12/5/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
Telephone call | | | 12/5/2005 | | DONE |
|
|
|
Left message for Lloyd's ele (sub) regarding final value difference///12/05/05 BAS
|
First Notice | | 7/27/2005 | 9/14/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/27/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10664 issued 7-27-05 to SMARC, LLC, IDX Pathology.
|
BLD-Final | 7/25/2005 | 7/26/2005 | 7/26/2005 | A | PASS |
Tony Young
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for c of o,, (permanent)
|
FIRE-Final Inspection | 7/25/2005 | 7/25/2005 | 7/26/2005 | P | FAIL |
Forrest France
|
|
|
Repair exit discharge lighting.
|
FIRE-Final Inspection | 7/26/2005 | 7/26/2005 | 7/26/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 7/21/2005 | 7/22/2005 | 7/22/2005 | A | FAIL |
Forrest France
|
|
|
Related fire sprinkler and fire alarm permits must be scheduled, inspected, and approved prior to BLD life safety sign-off. Defficient life safety items include but are not limited to; repair non-functional emergency lights and exit signs, verify functionality of duct smoke detectors, provide building address, provide approved hardware at custodial room.
|
BLD-Final | 7/21/2005 | 7/22/2005 | 7/22/2005 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/21/2005 at 4:20:24 PM. Contact: ###-####.
|
Code Occupancy Approval | 7/22/2005 | 7/22/2005 | 7/22/2005 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met.
|
Permanent Occupancy | | 7/22/2005 | 7/22/2005 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 7/21/2005 | 7/21/2005 | 7/21/2005 | | DONE |
|
|
|
drainage project complete, signed permanent occupancy 7/21/05. D.Erskine
|
Additional plans submitted | | | 6/1/2005 | | |
|
|
|
Received (1) copy of structural calculations. Routed to Dan S.
|
BLD-Other | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/28/2005 at 3:19:15 PM. Contact: ###-####. ext wall insulation ok area with steel stud walls
|
BLD-Framing/Rough-in | 4/21/2005 | 4/22/2005 | 4/22/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 12:36:45 PM. Contact: ###-####.ok to cover int walls ok to insulate ext walls 4/22/2005 10:19:55 AM
|
Additional plans submitted | | | 3/25/2005 | | DONE |
|
|
|
Received fax from Barbara Stitt, permit desk, sent to me from ACHD with impact fees of $7,257.00 stated. Barbara made a copy to have with plans for assessment of fees when applicant comes in to pick up permit. Copy in file.
|
Telephone call | | | 3/25/2005 | | |
|
|
|
Left message for KEPHA Construction that permit is ready & fees///3/25/05 1:45pm BAS
|
Issue PAID IN FULL permit | | | 3/25/2005 | | |
|
|
|
|
Routing - PLAN CHECK | 3/14/2005 | | 3/15/2005 | | PASS |
|
|
|
Plans approved by all reviewing agencies as noted on plans and attached plan review comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2005 | | PASS |
|
|
|
To permit desk to issue.
|
Print Occupancy Form | | | 3/15/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/15/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/15/2005 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 12/29/2004 | | 3/15/2005 | | PASS |
|
|
|
3/15/2005 06:56:52 DRS - activity updated through activity BLDA022 from case BLD04-02988.
|
Routing - PLANNING | 3/14/2005 | | 3/14/2005 | | PASS |
|
|
|
Approved as noted on the plans and per conditions of DRH03-110 modification approved on February 25, 2005.
|
Routing - PUBLIC WORKS | 3/9/2005 | | 3/14/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 3/8/2005 | | 3/9/2005 | | PASS |
|
|
|
Plans returned to my desk approved by Aimee.
|
Plan resubmittals received | | | 3/9/2005 | | DONE |
|
|
|
Received 2 - copies of Sheet C6.0 for Bryan Murphy
|
Telephone call | | | 3/9/2005 | | DONE |
|
|
|
Called Mr. Davies to let him know plans had been approved by ESC reviewer and only re-submittals for planning modifications are required. He thought the planning items would be submitted this PM or tommorrow AM.
|
Routing - PLAN CHECK | 3/2/2005 | | 3/8/2005 | | FAIL |
|
|
|
Routing back to ESC with new C5 sheets & ESC summary with application for re-review.
|
Plan resubmittals received | | | 3/8/2005 | | DONE |
|
|
|
Received 2- C5 sheets, ESC summary & application for ESC permit. Inserted into plans & routed to ESC review.
|
CHANGE STATUS TO (REV) | | | 3/2/2005 | | |
|
|
|
per Dan changed status to REV
|
Routing - PLAN CHECK | 3/1/2005 | | 3/2/2005 | | PEND |
|
|
|
Re-routing plans ESC & Planning.
|
Routing - Erosion and Sediment | 3/2/2005 | | 3/2/2005 | | FAIL |
|
|
|
No ESC plan routed to review. RP not certified by Boise City.
|
1st review completed | | | 3/1/2005 | | FAIL |
|
|
|
failed plan check and Planning.
|
Routing - FIRE | 2/16/2005 | | 3/1/2005 | | PASS |
|
|
|
Review faxed to architect.
|
Plan resubmittals received | | | 2/28/2005 | | DONE |
|
|
|
Received 2 Copys of sheets 1.00,1.12,3.31,3.35,3.40,3.45,4.11,5.00,5.20,5.21,6.00,7.11 Taken to Dan S.
|
Routing - PLAN CHECK | 1/26/2005 | | 2/16/2005 | | FAIL |
|
|
|
E-mailed copy of plan eview report for items needing correction to David Davies.
|
Plan resubmittals requested | | | 2/16/2005 | | DONE |
|
|
|
E-mailed corrections required to David Davies.
|
Routing - PLANNING | 1/21/2005 | | 1/25/2005 | | FAIL |
|
|
|
Plans changed from original approvals, staff level DR modification needed (DRH03-110).
Plans approved by CM for CUP03-35.
|
Plan resubmittals received | | | 1/13/2005 | | DONE |
|
|
|
ESC re-submittals; routed to plans in planning: (Scott).
|
Routing - PLANNING | 1/10/2005 | | 1/11/2005 | | FAIL |
|
|
|
Tempra Wilson DRH03-00110. Tempra routed to Carl Miller to review CU compliance.
|
Routing - Erosion and Sediment | 1/7/2005 | | 1/10/2005 | | FAIL |
|
|
|
ESC plan does not meet requirements set forth in BMC 8-17. Notified PD.
|
Routing - PUBLIC WORKS | 12/29/2004 | | 1/7/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/28/2004 | | DONE |
|
|
|
Received two full sets.
|
Application received | | | 12/23/2004 | | |
|
|
|
|
Routing - PLUMBING | 1/25/2004 | | 1/26/2004 | | PASS |
|
|
|
3" min. floor sink in riser room, no floor sinks are to be installed with in cabinets, increase venting for sewer services at the west of building and the existing 3" to wb-1 to 3" or 7.07". if an eyewash or shower is to be installed, the water will need to be potable.
|