Case Summary (BLD) | | | 4/29/2016 | | DONE |
|
|
|
|
Second Notice BLD | 8/2/2006 | 8/2/2006 | 8/2/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/29/2006 | 8/2/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/28/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11100 issued 6-28-06 to the Hampton Estates.
|
Permanent Occupancy | | 6/27/2006 | 6/27/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/12/2006 | | DONE |
|
|
|
|
BLD-Final | 9/13/2005 | 9/13/2005 | 9/13/2005 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/13/2005 at 10:31:39 AM. Contact: ###-####. Ok for perm occ when public works and code enforcement has finaled.
|
Temporary occupancy | | | 9/13/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5271 issued 9-13-05 to Hampton Estates.
|
BLD-Final | 9/2/2005 | 9/6/2005 | 9/6/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/2/2005 at 1:36:15 PM. Contact: ###-####.
|
FIRE-Final Inspection | 9/2/2005 | 9/6/2005 | 9/6/2005 | A | FAIL |
Forrest France
|
|
|
Door closures on apt. 202 needs adjustment.
|
FIRE-Final Inspection | 9/6/2005 | 9/6/2005 | 9/6/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety passed inspection.
|
BLD-Final | 8/31/2005 | 9/1/2005 | 9/1/2005 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 2:11:53 PM. Contact: ###-####.
|
FIRE-Final Inspection | 8/31/2005 | 8/31/2005 | 9/1/2005 | P | FAIL |
Forrest France
|
|
|
Smoke alarm installation must meet requirements of NFPA 72 2002, see fire code review notes #2 and #3.
|
Plan Reviewer's activity | | | 8/25/2005 | | DONE |
|
|
|
Non build agreement satified removed parcel hold.
|
BLD-Footing | 6/10/2005 | 6/10/2005 | 6/10/2005 | P | PART |
Mike Jordan
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Energy code compliance | 5/27/2005 | 5/27/2005 | 5/27/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/27/2005 at 9:27:36 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/26/2005 | 5/26/2005 | 5/26/2005 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/26/2005 at 10:15:39 AM. Contact: ###-####. ok by 316 to insulate
|
BLD-Framing/Rough-in | 5/25/2005 | 5/26/2005 | 5/26/2005 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/25/2005 at 3:15:16 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 26 2005 7:56AM.
|
BLD-Footing | 4/21/2005 | 4/22/2005 | 4/22/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 5:22:10 PM. Contact: ###-####. Fairview... N. on Hampton .. by Tates. 4/22/2005 11:57:40 AM
|
BLD-Footing | 4/19/2005 | 4/19/2005 | 4/19/2005 | P | PASS |
Jim Sly
|
|
|
ron ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--call 1st before insp
|
Issue PAID IN FULL permit | | | 4/15/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/7/2005 | | |
|
|
|
|
Print Occupancy Form | | | 4/7/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/7/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Permit Ready to Issue | | | 4/7/2005 | | |
|
|
|
|
Plan assigned to (M_P) | 12/28/2004 | 12/28/2004 | 4/6/2005 | | PASS |
|
|
|
4/6/2005 08:59:35 M_P - activity updated through activity BLDA022 from case BLD04-02991.
|
Routing - PLAN CHECK | 4/6/2005 | | 4/6/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2005 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/6/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/6/2005 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 3/31/2005 | | 4/5/2005 | | PASS |
|
|
|
final plat recorded 3/31/05
|
Routing - PLAN CHECK | 3/15/2005 | | 3/31/2005 | | |
|
|
|
Routing to Land Division.
|
Plan resubmittals received | | | 3/17/2005 | | |
|
|
|
Received Transmittal & 2 Copys of sheet A8.0 Taken to Mike P.
|
Routing - PLAN CHECK | 3/11/2005 | | 3/15/2005 | | FAIL |
|
|
|
Waiting for different design for stairway enclosures, penetration of trusses not permitted.
|
Plan resubmittals received | | | 3/15/2005 | | |
|
|
|
Received calculations.
|
Routing - PLANNING Land Div | 3/4/2005 | | 3/11/2005 | | FAIL |
|
|
|
MUST RECORD FINAL PLAT
|
Plan resubmittals received | | | 3/8/2005 | | DONE |
|
|
|
Received Transmittal Letter, 2 Project Calcs & 2 Copys of sheets A1.0,A2.0,A2.1,A3.0,A4.0,A4.1,A4.2,A5.0,A5.1,A5.2,A5.3,A8.0,A9.0 Taken to Mike P.
|
Routing - PLANNING | 2/14/2005 | | 3/4/2005 | | PASS |
|
|
|
2/28/05 - Approved per DRH04-00073 Mod. #1. Approved per CUP04-00024 Mod #1 - copies for CUP/DRH files submitted 3-4-2005. kg
|
Plan resubmittals received | | | 3/1/2005 | | DONE |
|
|
|
Received Transmittal & 2 Copys of sheet A1.0 Taken to Mike P.
|
Plan resubmittals received | | | 2/25/2005 | | DONE |
|
|
|
Received Transmittal & 2 Copys of sheet L1.0 Taken to Mike P.
|
Plan resubmittals received | | | 2/17/2005 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of sheets A1.0,A1.1,A5.0,A5.1,A5.2,A5.3 Taken to Mike P.
|
Routing - PLUMBING | 2/7/2005 | | 2/14/2005 | | PASS |
|
|
|
each unit in a 4 plex is to have its own water service. per plans and 2003 upc.
|
Routing - PLAN CHECK | 1/27/2005 | | 2/7/2005 | | |
|
|
|
Routing to plumbing.
|
Plan resubmittals received | | | 2/1/2005 | | DONE |
|
|
|
Received Transmittal , 2 Copys of sheets 1, 2 Copys of sheets A1.1, & 2 Copys of sheets L1.0 Taken to Mike P.
|
Plan resubmittals received | | | 2/1/2005 | | DONE |
|
|
|
Received Transmittal & 2 Copys of sheet P1.0 Taken to Mike P.
|
1st review completed | | | 1/27/2005 | | FAIL |
|
|
|
failed Planning Land Div, Planning, plumbing, and plan check.
|
Routing - FIRE | 1/21/2005 | | 1/27/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/5/2005 | | 1/21/2005 | | FAIL |
|
|
|
Plan review complete, sent correction report to architect requesting additional informatio be submitted for futher review prior to issuing permit.
|
Print permit w/o conditions | | | 1/21/2005 | | |
|
|
|
|
Routing - Erosion and Sediment | 1/3/2005 | | 1/4/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLUMBING | 1/4/2005 | | 1/4/2005 | | FAIL |
|
|
|
provide waste and vent riser diagram for building A (unit 1 per P1.0), size water system for each unit. civil plans show one 6" sewer stub to each building, plumbing plans show one 4". show pipe routing for each unit.
|
Routing - PUBLIC WORKS | 12/28/2004 | | 1/3/2005 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/28/2004 | | |
|
|
|
|
Routing - PLANNING Land Div | 12/28/2004 | | 12/28/2004 | | FAIL |
|
|
|
Do not issue permit until final plat of O'Neal is recorded.
|
Recd Pcfee & Taken To Pln CK | | | 12/28/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/28/2004 | | |
|
|
|
|
Application received | | | 12/27/2004 | | |
|
|
|
|
Routing - PLANNING | 1/4/2005 | | 1/5/2004 | | FAIL |
|
|
|
Sara S. DRH04-00073
Karen G. CUP04-00024
Failed both the DR and the CUP review. Landscape plan needs to be prepared by a licensed landscape architect and address the vegetation along Hampton Street. The trash enclosures are required to be CMU and the detail shows cedar fencing. No bike racks are shown. There are no notes regarding the amenities and Karen still needs documentation showing that a minimum of 30% of the site is open space.
|
Fee Review-notes | 12/28/2004 | 12/28/2004 | | | |
|
|
|
|