BLD-Final | 4/3/2007 | 4/4/2007 | 4/4/2007 | A | PASS |
Dave Hannah
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
DOC - Permit Finaled | 4/4/2007 | 4/4/2007 | 4/4/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 3/30/2007 | 4/2/2007 | 4/2/2007 | A | PART |
Tony Young
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith conf on final,, need zoning, stairs/handrails/guardrails per code
|
BLD-Energy code compliance | 9/18/2006 | 9/19/2006 | 9/19/2006 | P | PASS |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 9/12/2006 | 9/14/2006 | 9/14/2006 | A | PASS |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 9/11/2006 | 9/12/2006 | 9/12/2006 | A | CANC |
Tony Young
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Conference | 8/31/2006 | 9/1/2006 | 9/1/2006 | A | PASS |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley frame walkthrough
|
BLD-Conference | 6/26/2006 | 6/26/2006 | 6/26/2006 | P | PART |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley conf on framing on moved house,, needs to consult w/ a structural engineer on fixes and as built
|
BLD-Foundation | 4/11/2006 | 4/12/2006 | 4/12/2006 | A | PART |
Tony Young
|
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong basement walls,, wip
|
BLD-Other | 4/11/2006 | 4/11/2006 | 4/10/2006 | P | PART |
Bob Archibald
|
|
|
Reinforcing steel for foundation walls being placed/tied.Concrete placement scheduled for 4/13.
|
BLD-Other | 4/6/2006 | 4/6/2006 | 4/6/2006 | A | PART |
Bob Archibald
|
|
|
Concrete scheduled to be placed at 10:30 today. Security fencing in place and site clean, owner also on property.
|
BLD-Footing | 4/4/2006 | 4/5/2006 | 4/5/2006 | P | PART |
Mike Jordan
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter footings for basement walls.
|
BLD-Other | 3/24/2006 | 3/24/2006 | 3/24/2006 | P | PART |
Tony Young
|
|
|
Structure has been located on site. Building site surrounded with orange safety fencing and posted "No Trespassing".
|
BLD-Other | 3/8/2006 | 3/8/2006 | 3/8/2006 | A | PART |
Bob Archibald
|
|
|
Structure has been relocated from 11th/fort to this location.Structure is being positioned for permanent placement.
|
Case Summary (BLD) | | | 2/23/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/23/2006 | | DONE |
|
|
|
|
BLD-Conference | 2/21/2006 | 2/21/2006 | 2/21/2006 | P | PASS |
Tony Young
|
|
|
jim ###-#### ok to keep active
|
Case Summary (BLD) | | | 11/17/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 9/21/2005 | | |
|
|
|
|
Telephone call | | | 9/21/2005 | | DONE |
|
|
|
Left voice message that permit is ready & fees///9/21/05 3:50pm BAS
|
BLD-Footing | 8/25/2005 | 8/26/2005 | 8/26/2005 | A | PART |
Tony Young
|
|
|
patial footing///mike harrison; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa porch ftgs
|
Inspection Record Card- Bld | | | 8/25/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/25/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/7/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/7/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/7/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 3/7/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/7/2005 | | |
|
|
|
|
Routing - PLAN CHECK | 2/17/2005 | | 3/6/2005 | | PASS |
|
|
|
|
Plan assigned to (SAM) | 3/4/2005 | | 3/6/2005 | | PASS |
|
|
|
3/6/2005 12:07:43 SAM - activity updated through activity BLDA022 from case BLD04-03003.
|
Case Summary (BLD) | | | 3/6/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/1/2005 | | DONE |
|
|
|
Spoke with Mike Harrison on the phone (###-####) and informed him that the $10,000 bond to bring the house up to code would need to be posted prior to us being able to issue the permit. As of this date we do not have this on file. He said he would pass this information on to the church folks.
|
Routing - PUBLIC WORKS | 2/16/2005 | | 2/17/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 1/10/2005 | | 2/16/2005 | | PASS |
|
|
|
Jeff N.\\plans pulled from hold drawer and approved by JAN. Appeal period is over 2/17/05 at 5:00pm. note - additional permit needed when applicant determines desired use for building residential vs office
|
Routing - PLANNING | 12/28/2004 | | 12/28/2004 | | FAIL |
|
|
|
Project will require a certificate of appropriateness. Directed applicant to speak w/ Jeff Neberman.
|
Application received | | | 12/27/2004 | | |
|
|
|
|