Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-03007
StatusFinaled
Name HAMPTON ESTATES
Site Address 10010 W GARVERDALE LN
Project NameHampton Estates 4-plex
Customer Number 
ePlanReviewNo
Description
**Building Type B-2 lot 10 * To construct a new 5,016 sq.ft. two story, wood framed, four unit apartment building. Each unit is 1,200 sq.ft.. three bedroom and two bath, with a 60 sq.ft. covered deck. All construction per the approved plans and attached comment list. MJP DRH04-00073 Sarah Schafer CUP04-00024 Karen Gallagher.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/2/20068/2/20068/2/2006 DONE
First Notice has not been responded to.
First Notice 6/29/20068/2/2006 DONE
Permanent occupancy  6/29/2006 DONE
Perm. Occ. Cert. # 11107 issued 6-29-06 to the Hampton Estates.
Permanent Occupancy 6/27/20066/27/2006 DONE
Details
Temporary occupancy  11/10/2005 DONE
Temp. Occ. Cert. #5304 issued 11-10-05 to Hampton Estates.
BLD-Final11/4/200511/7/200511/7/2005PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/4/2005 at 4:24:25 PM. Contact: ###-####.
OK for Temp Occ......Perm Occ OK if all signatures and no bonds. ():
FIRE-Final Inspection11/4/200511/7/200511/7/2005APASS
DetailsTroy Cobbley
Fire life safety finaled.
Plan Reviewer's activity  8/25/2005 DONE
Non build agreement satified removed parcel hold.
BLD-Energy code compliance8/2/20058/3/20058/3/2005PPASS
DetailsJim Sly
pete; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in8/1/20058/1/20058/1/2005PPASS
DetailsJim Sly
PETE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Foundation6/9/20056/9/20056/9/2005PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/9/2005 at 11:01:50 AM. Contact: ###-####.
BLD-Footing6/8/20056/8/20056/8/2005PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/8/2005 at 6:11:56 AM. Contact: ###-####.
(F) Reprint permit  5/25/2005  
Issue PAID IN FULL permit  5/24/2005 DONE
Permit Ready to Issue  4/7/2005 DONE
Inspection Record Card- Bld  4/7/2005 DONE
Print Occupancy Form  4/7/2005  
Telephone call  4/7/2005 DONE
left mess that permit is ready
Plan assigned to (M_P)12/28/200412/28/20044/6/2005 PASS
4/6/2005 09:39:43 M_P - activity updated through activity BLDA022 from case BLD04-03007.
Routing - PLAN CHECK4/6/2005 4/6/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/6/2005 DONE
Print Pending Permit.LaserJet4  4/6/2005 DONE
Case Summary (BLD)  4/6/2005 DONE
Routing - PLANNING Land Div3/31/2005 4/5/2005 PASS
final plat recorded 3/31/05
Routing - PLAN CHECK3/15/2005 3/31/2005  
Routing to Land Division.
Routing - PLAN CHECK3/11/2005 3/15/2005 FAIL
Waiting for different design for stairway enclosures, penetration of trusses not permitted.
Plan resubmittals received  3/15/2005  
Received calculations
Routing - PLANNING Land Div3/4/2005 3/11/2005 FAIL
MUST RECORD FINAL PLAT
Routing - PLANNING2/14/2005 3/4/2005 PASS
2/28/05 - Approved per DRH04-00073 Mod. #1. Approved per CUP04-00024 Mod #1 - copies for CUP submitted 3-4-2005.kg
Routing - PLUMBING2/7/2005 2/14/2005 PASS
see bld04-02991
Routing - PLAN CHECK1/27/2005 2/7/2005  
Routing to plumbing.
1st review completed  1/27/2005 FAIL
failed planning land div., planning, plumbing, and plan check.
Routing - FIRE1/21/2005 1/27/2005 PASS
Print permit w/o conditions  1/21/2005  
Routing - PLAN CHECK1/5/2005 1/21/2005 FAIL
Plan review complete, sent correction report to architect requesting additional informatio be submitted for futher review prior to issuing permit.
Routing - PLANNING1/4/2005 1/5/2005 FAIL
DRH04-00073 Sarah Schafer
CUP04-00024 Karen Gallagher

Failed both the DR and the CUP review. Landscape plan needs to be prepared by a licensed landscape architect and address the vegetation along Hampton Street. The trash enclosures are required to be CMU and the detail shows cedar fencing. No bike racks are shown. There are no notes regarding the amenities and Karen still needs documentation showing that a minimum of 30% of the site is open space.
Routing - Erosion and Sediment1/3/2005 1/4/2005 PASS
ESC plan approved with attached conditions.
Routing - PLUMBING1/4/2005 1/4/2005 FAIL
see bld04-02991 for comments
Routing - PUBLIC WORKS12/28/2004 1/3/2005 PASS
Routing - PLANNING Land Div12/28/2004 12/28/2004 FAIL
Do not issue permit until final plat of O'Neal Sub is recorded
Plan routing begun/NEW & ADDTN  12/28/2004 DONE
Recd Pcfee & Taken To Pln CK  12/28/2004 DONE
Plans ACCEPTED BY PLAN TECH  12/28/2004 DONE
Application received  12/27/2004  
Fee Review-notes12/28/200412/28/2004