Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-03034
StatusFinaled
Name JORDAN-WILCOMB CO
Site Address 2960 S WISE WAY
Project NameIDAHO SHAKESPEARE FESTIVAL
Customer Number 
ePlanReviewNo
Description
(IDAHO SHAKESPEARE FESTIVAL) To remodel an existing 17,175 sq.ft. warehouse, production shops & fabrication facility for making of the stage props and scenery, costumes, general offices and laundry area. Work to include remodel to divide up production activities, installation of partial HVAC systems, new lighting, construct 2 new accessible restrooms and install new accessible ramp and landing on the east side of building per approved plans. NOTE: This building is fully fire sprinklered with an one site water storage pond and the sprinkler system is used for area increase MJP CZC04-00029
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/14/20066/14/200611/7/2007 DONE
Second Notice has not been responded to.
Second Notice BLD5/25/20065/25/20066/14/2006 DONE
First Notice has not been responded to.
First Notice 5/12/20065/25/2006 DONE
Permanent occupancy  5/12/2006 DONE
Perm. Occ. Cert. # 11018 issued 5-12-06 to the Idaho Shakespeare Festival warehouse.
BLD-Final5/10/20065/10/20065/10/2006PPASS
DetailsDave Hannah
kevin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for perm occ
Permanent Occupancy 5/10/20065/10/2006 DONE
Details
BLD-Final5/8/20065/9/20065/9/2006PFAIL
DetailsDave Hannah
Kevin, ###-#### needs signage at restrooms and mirrir lowered
FIRE-Final Inspection5/8/20065/9/20065/9/2006APASS
DetailsForrest France
Inspection passed, fire life safety is acceptable. No permit card available on site for sign-off at the time of inspection.
Code Occupancy Approval5/9/20065/9/20065/9/2006PPASS
DetailsWm. Michael Meloy
compliance met.
FIRE-Final Inspection5/1/20065/2/20065/2/2006ADONE
DetailsForrest France
Duplicate inspection request already completed.
FIRE-Final Inspection5/1/20065/2/20065/2/2006AFAIL
DetailsForrest France
The project related fire sprinkler permit must be finaled prior to life safety approval, some items noted on walk through include exit sign at the SW door needs repaired, manual flush bolts on the inactive leaf at the north exit are not allowed, need to test emergency lights, provide lever hardware at the paint room door, provide approved building plans and review notes at the next inspection, not all items reviewed at this time.
BLD-Framing/Rough-in2/17/20062/17/20062/17/2006PPASS
DetailsTom Arcoraci
ceiling insp kevin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in2/15/20062/15/20062/15/2006PFAIL
DetailsDave Hannah
Kevin -- for ceiling; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong fail wire not 1in6 and one side rivited
BLD-Framing/Rough-in1/9/20061/10/20061/11/2006PPASS
DetailsDave Hannah
kevin ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover int walls
BLD-Framing/Rough-in12/29/200512/30/200512/30/2005PPART
DetailsTony Young
kevin ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok to cover interior single walls,, need a fix /detail from architect on fire blocking and window openings,,, etc,,my note is on plans
BLD-Aging Inspection10/5/200510/5/200510/5/2005 PASS
DetailsDave Hannah
Issue PAID IN FULL permit  7/6/2005 DONE
Inspection Record Card- Bld  6/16/2005 DONE
Print Occupancy Form  6/16/2005 DONE
Permit Ready to Issue  6/16/2005 DONE
Telephone call  6/16/2005 DONE
Spoke with Jackie and told her that permit is ready & fees///6/16/05 1:30pm BAS
Plan assigned to (M_P)12/30/2004 6/15/2005 PASS
6/15/2005 09:47:26 M_P - activity updated through activity BLDA022 from case BLD04-03034.
Routing - PLAN CHECK6/14/2005 6/15/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/15/2005 DONE
Print Pending Permit.LaserJet4  6/15/2005 DONE
Case Summary (BLD)  6/15/2005 DONE
Routing - FIRE6/9/2005 6/14/2005 PASS
resubmittal acceptable. Revised comments faxed to architect.
Routing - PLAN CHECK1/31/2005 6/9/2005  
Routing to fire.
Plan resubmittals received  6/6/2005 DONE
Received 1 Transmittal,2 Structural Calcs,& 2 Copys of sheets A1,A2,A3,A4,M1,M2,M3,M4 Taken to Mike P.
1st review completed  1/31/2005 FAIL
failed plan review and fire.
Routing - FIRE1/25/2005 1/31/2005 FAIL
lacks information regarding haz mat's, storage, and painting op's. Review faxed to architect.
Routing - PLAN CHECK1/10/2005 1/25/2005 FAIL
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing - PLANNING1/4/2005 1/10/2005 PASS
Approved.
Routing - Erosion and Sediment1/3/2005 1/4/2005 PASS
ESC plan waiver request approved with attached conditions.
Plan resubmittals received  1/3/2005 DONE
Received ESC waiver letter with application and letter to Karen G. Taken to Mike P.
Routing - PUBLIC WORKS12/30/2004 1/3/2005 PASS
Application received  12/29/2004  
Recd Pcfee & Taken To Pln CK  12/29/2004 DONE
Plans ACCEPTED BY PLAN TECH  12/29/2004 DONE
ok per Mike P. Lighting compliance is on 81/2 X 11 not plan size & needs esc application with waiver request letter.