Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD04-03049
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 111 N AVENUE C
Project NameWolf-Mistry Medical Office
Customer Number 
ePlanReviewNo
Description
Wolf-Mistry Medical Office Building - To construct a 3,287 sq. ft two story Type VB building with a 1, 520 sq. ft. basement. First floor of 1,767 sq. ft. will be used for a medical office with the 1,520 sq. ft. second floor and 1,520 sq. ft. basement used as private residences. Other work includes site demolition, site improvements, paving and landscaping per approved plans and attachements, CVA04-00041, CUP04-00118, DRH04-00041.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/14/2005 DONE
Second Notice has not been responded to.///singed off 2004 permit per Jenifer & Rita
Second Notice BLD10/27/200510/27/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 10/4/200510/27/2005 DONE
BLD-Final10/3/200510/4/200510/4/2005APASS
DetailsDave Hannah
russ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
Permanent occupancy UNPAID FEE  10/4/2005 DONE
Perm. Occ. Cert. # 10762 issued 10-4-05 to Wolf-Mistry Medical Office.
FIRE-Final Inspection9/30/200510/3/200510/3/2005PPASS
DetailsForrest France
Fire life safety passed inspection.
FIRE-Final Inspection9/29/20059/30/20059/30/2005PCANC
DetailsForrest France
Cancel inspection per Russ the general contractor.
FIRE-Final Inspection9/27/20059/29/20059/29/2005ANR
DetailsForrest France
Project is not ready for inspection, contractor to reschedule.
Code Occupancy Approval9/28/20059/28/20059/28/2005PPASS
DetailsWm. Michael Meloy
Permanent Occupancy 9/28/20059/28/2005 DONE
Details
PubWorks Occupancy Approval9/27/20059/27/20059/27/2005 DONE
Drainage project complete, signed permanent occupancy 9/27/05. G.Fitts
BLD-Other9/8/20059/9/20059/9/2005APART
DetailsDave Hannah
russ Note: ceiling suspended grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to drop panels
BLD-Framing/Rough-in9/1/20059/1/20059/2/2005PNR
DetailsDave Hannah
suspended ceiling grid inspection please///russ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/8/20058/9/20058/9/2005APART
DetailsDave Hannah
Russ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover around stairs in basement
BLD-Framing/Rough-in8/5/20058/5/20058/8/2005PPART
DetailsDave Hannah
steel stud ceiling inspection///russ ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ceil in basement ok to cover
BLD-Energy code compliance8/1/20058/2/20058/2/2005APASS
DetailsMike Jordan
russ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Lateral bracing at gable end has been repaired.
BLD-Framing/Rough-in7/27/20057/28/20057/28/2005APART
DetailsMike Jordan
russ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. OK to insulate. Need to rienspect gable ends for proper bracing. Also need to complete fire caulking of penetrations.
BLD-Energy code compliance7/20/20057/21/20057/21/2005PPART
DetailsJim Storey
russ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover basement and first floor.
BLD-Framing/Rough-in7/18/20057/19/20057/19/2005APART
DetailsJim Storey
russ ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie basement and first floor ok to insulate and one side to verify boxes back to back and less than 24 " horizontal spacing as well as hvac shaft interior drywall aplacation.
BLD-Framing/Rough-in7/15/20057/18/20057/18/2005APART
DetailsTony Young
russ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
exterior shear,,, need fix from engineer on strap call-out where cantilever
BLD-Other7/8/20057/11/20057/12/2005PDONE
DetailsDave Hannah
roof sheating inspection//rus; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in7/5/20057/6/20057/6/2005APART
DetailsDave Hannah
exterior shear nail inspection please////russ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore areas that need stone ok to cover
BLD-Framing/Rough-in6/29/20056/30/20056/30/2005PPART
DetailsDave Hannah
russ Note: 2nd floor only; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover firts floor ceiling
BLD-Energy code compliance6/22/20056/23/20056/23/2005APART
DetailsDave Hannah
russ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa basement rim ok to cover basement ceiling
BLD-Framing/Rough-in6/21/20056/22/20056/23/2005APART
DetailsDave Hannah
1st floor joist inspection please///russ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore basement ceiling ok to insulate rim
BLD-Foundation5/24/20055/25/20055/25/2005APASS
DetailsDave Hannah
russ--for stairwell ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Foundation5/17/20055/18/20055/18/2005PPART
DetailsDave Hannah
russ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore rebare ok crew will have spec inspection tomorrow be for pour
BLD-Concrete5/3/20055/4/20055/4/2005APART
DetailsDave Hannah
late am please///russ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore mti will also sign off pour
BLD-Footing4/21/20054/22/20054/22/2005PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 4/21/2005 at 1:09:45 PM. Contact: ###-####.
(F) Reprint permit  3/15/2005  
Issue PAID IN FULL permit  3/14/2005 DONE
Permit Ready to Issue  3/8/2005 DONE
Telephone call  3/8/2005 DONE
tlk to matthhew that permit and fees are ready to be picked up
Inspection Record Card- Bld  3/7/2005 DONE
Print Occupancy Form  3/7/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/4/2005 DONE
Plan assigned to (MLO)1/4/2005 3/4/2005 PASS
3/4/2005 15:14:09 MLO - activity updated through activity BLDA022 from case BLD04-03049.
Routing - FIRE2/23/2005 3/3/2005 PASS
route back to fire to check redesign MLO. Acceptable as non-sprinklered. Revised comments accordingly.
Plan resubmittals received  2/25/2005 DONE
Received Transmittal , & 2 Copys of sheets E1.0,E2.11F,E3.1 Taken to Mike O.
Plan resubmittals received  2/23/2005 DONE
Received Transmittal ,2 Letters & 2 Copys of sheets A0.01,A1.11,A2.11,A3.11,A3.21,A4.21,A5.11,A6.11 S2.1 Taken to Mike O.
Routing - PLAN CHECK2/23/2005 2/23/2005 PASS
Routing - PLAN CHECK2/14/2005 2/14/2005 PEND
Routing - PLUMBING2/14/2005 2/14/2005 PASS
per plans and 2003 upc.
Routing - FIRE2/4/2005 2/9/2005 PASS
Review comments faxed to architect due to conditions.
1st review completed  2/9/2005 FAIL
failed structural, plumbing, and plan check.
Routing - PLAN CHECK2/9/2005 2/9/2005 PEND
Routing Off Site - STRUCTURAL1/4/2005 2/4/2005 FAIL
correction sent to architect
Plan resubmittals requested  2/4/2005 DONE
IBC corrections
Routing - PLAN CHECK2/1/2005 2/4/2005 FAIL
corrections sent to architect
Routing - PLANNING1/19/2005 1/31/2005 FAIL
Sarah Schafer DRH04-00235. Passed DR with redlines on sheet A1.11. Will forward to Carl Miller for review of Variance and CUP information. 1/20/05

Carl Miller CVA04-00041 and CUP04-00118. Denied on 1/31/05. Need parking agreement.
Plan resubmittals received  1/27/2005 DONE
Received two copies of revised sheets m2.00 and m2.01. Routed to Mike O. kmm
Routing - PLUMBING1/13/2005 1/19/2005 FAIL
seperate waste in basement from the 1st and 2nd floor and install a backwater valve. 120 deg max hot water to all public lavs, requires a tempering valve. plumbing plans ahow a 1 1/2" water service, civil shows a 1".
Routing - Erosion and Sediment1/13/2005 1/13/2005 PASS
ESC plan approved with attached conditions, RP must be identified before permit is issued. adh.
Routing - PUBLIC WORKS1/4/2005 1/13/2005 PASS
Plan resubmittals received  1/12/2005 DONE
Received VIA fax 1 Transmittal & 1 United Water Sheet. Taken to Mike O.
(F) Reprint permit  1/4/2005 DONE
Plan routing begun/NEW & ADDTN  1/4/2005  
Plans ACCEPTED BY PLAN TECH  1/4/2005  
No United Water sheet.
Routing - PLANNING Land Div1/4/2005 1/4/2005 PASS
Parcel created prior to October 30, 1965.
Application received  12/30/2004  
Recd Pcfee & Taken To Pln CK  12/30/2004 DONE
Fee Review-notes12/30/200412/30/2004