Case Summary (BLD) | | | 1/27/2009 | | |
|
|
|
|
Third Notice BLD | 4/2/2007 | 4/2/2007 | 8/15/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 1/3/2005 | 1/3/2005 | 8/15/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/23/2007 | | DONE |
|
|
|
lft vm with glenda hidleborant ###-#### regarding final values
|
Telephone call | | | 7/20/2007 | | DONE |
|
|
|
lft wm with larrry sundell regarding the boarding house - who to contact and get hold of for the final values
|
Second Notice BLD | 3/21/2007 | 3/21/2007 | 4/2/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/2/2007 | 3/21/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 3/2/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11464 issued 3-2-07 to the Leku Ona Hotel.
|
BLD-Conference | 2/23/2007 | 2/26/2007 | 2/26/2007 | P | PASS |
Dave Hannah
|
|
|
Please call Cathy when you confirm handrails to basement have been installed. Go next door to restaurant for access to boarding house. Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
|
Permanent Occupancy | | 2/26/2007 | 2/26/2007 | | DONE |
|
|
|
|
BLD-Final | 12/22/2005 | 12/22/2005 | 12/22/2005 | P | PART |
Dave Hannah
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for temp occ needs hand rail for basement stairs
|
FIRE-Final Inspection | 12/21/2005 | 12/22/2005 | 12/22/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety is acceptable, c/n items have been completed.
|
Temporary occupancy | | | 12/22/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5344 issued 12-22-05 to the Boarding House.
|
FIRE-Final Inspection | 12/20/2005 | 12/21/2005 | 12/21/2005 | A | CANC |
Forrest France
|
|
|
Per contractor the fire alarm is not ready for final inspection, life safety cannot be approved prior to alarm final.
|
FIRE-Final Inspection | 11/21/2005 | 11/21/2005 | 11/21/2005 | A | FAIL |
Forrest France
|
|
|
Need to install emergency lighting as required, repair hardware at the main entry/exit.
|
Code Occupancy Approval Temp | 11/3/2005 | 11/3/2005 | 11/3/2005 | P | DONE |
Wm. Michael Meloy
|
|
|
Requirement for 1" plywood around tree, due to backorder on grates.
|
BLD-Conference | 8/9/2005 | 8/10/2005 | 8/10/2005 | A | DONE |
Dave Hannah
|
|
|
set up for 9:00am??? Larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 7/11/2005 | 7/12/2005 | 7/12/2005 | P | DONE |
Dave Hannah
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore rob is taking over project went over that has beeen looked at
|
(F) Reprint permit | | | 7/11/2005 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 3/23/2005 | 3/24/2005 | 3/24/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/23/2005 at 3:16:01 PM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 2/9/2005 | | |
|
|
|
|
Telephone call | | | 2/8/2005 | | DONE |
|
|
|
left mess for larry sundell at ###-#### is ready
|
Permit Ready to Issue | | | 2/4/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/4/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/4/2005 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 1/31/2005 | | 2/3/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/3/2005 | | 2/3/2005 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2005 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/5/2005 | | 2/3/2005 | | PASS |
|
|
|
2/3/2005 16:14:37 CJW - activity updated through activity BLDA022 from case BLD05-00011.
|
Routing - PLAN CHECK | 1/28/2005 | | 1/31/2005 | | |
|
|
|
|
Routing - FIRE | 1/21/2005 | | 1/28/2005 | | PASS |
|
|
|
review comments faxed to architect.
|
1st review completed | | | 1/28/2005 | | FAIL |
|
|
|
failed public works and plan check.
|
Plan resubmittals received | | | 1/26/2005 | | DONE |
|
|
|
Received 2 Structural Calcs, & 3 Copys of sheet 6 Taken to Carl W.
|
Routing - PLUMBING | 1/18/2005 | | 1/21/2005 | | PASS |
|
|
|
increase vtr's to 12.56. install a 1 1/2" dcva on premise in place of 1"rp. increase cw to wc above stairs to 1 1/4". install rp on equipment makeup water.
|
Routing - PLAN CHECK | 1/7/2005 | | 1/18/2005 | | FAIL |
|
|
|
The IBC plan review was started on January 7, 2005 and was finished on January 18, 2005. A response from the architect was required. See the plan review report.
|
Routing - PLANNING | 1/7/2005 | | 1/7/2005 | | PASS |
|
|
|
Jeff Neberman DRH05-00006.
|
Routing - PUBLIC WORKS | 1/5/2005 | | 1/7/2005 | | FAIL |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/4/2005 | | |
|
|
|
|
Application received | | | 1/3/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/3/2005 | | DONE |
|
|
|
|
BLD-Final | 8/29/2006 | 8/30/2006 | | A | |
Bob Archibald
|
|
|
Pls confirm handrails for basement stairs in place & let me know, thanks. Cathy W.
|