Second Notice BLD | 4/23/2008 | 4/23/2008 | 5/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/28/2008 | 4/23/2008 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/25/2008 | 2/25/2008 | 2/28/2008 | | PASS |
Dave Hannah
|
|
|
called office they will go pick up occ card
|
Permanent Occupancy | | | 2/28/2008 | | DONE |
|
|
|
|
BLD-Final | 9/18/2007 | 9/19/2007 | 9/19/2007 | A | PASS |
Dave Hannah
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
|
FIRE-Final Inspection | 9/17/2007 | 9/18/2007 | 9/18/2007 | A | PASS |
Forrest France
|
|
|
Items from the previous correction notice have been verified for completion, noted the provided PFE is past due annual certification-tenant has made arrangements for testing today, no card available for signature on site.
|
BLD-Final | 9/14/2007 | 9/17/2007 | 9/17/2007 | P | FAIL |
Dave Hannah
|
|
|
Please call at least 30 mins prior to inspection==bryan Phone #: ###-#### needs fire signoffs
|
BLD-Final | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/19/2005 at 8:07:59 AM. Contact: ###-####.
|
FIRE-Final Inspection | 7/18/2005 | 7/19/2005 | 7/19/2005 | A | FAIL |
Forrest France
|
|
|
Contact: ###-####. Provide fire extinguisher as required on review notes, provide suite address.
|
FIRE-Final Inspection | 7/12/2005 | 7/12/2005 | 7/12/2005 | P | NR |
Forrest France
|
|
|
Talked to Paul at ###-####, he will call in inspection for tomorrow.
|
BLD-Other | 6/15/2005 | 6/15/2005 | 6/15/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 7:28:30 AM. Contact: ###-####. ceiling grid ok to cover
|
BLD-Framing/Rough-in | 5/19/2005 | 5/19/2005 | 5/19/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 7:03:02 AM. Contact: ###-####.ok to cover
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2005 | | PASS |
|
|
|
Plan modifications taken to permit desk to process for issuing.
|
Inspection Record Card- Bld | | | 5/18/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/18/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/18/2005 | | DONE |
|
|
|
re-issued
|
(F) Reprint permit | | | 5/18/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/17/2005 | | DONE |
|
|
|
Received transmittal, (1) memo, (1) Lithonia Lighting & 2 copys of sheets e2.1L & e1.0. Taken to Dan S.
|
Routing - PLAN CHECK | 5/12/2005 | | 5/13/2005 | | FAIL |
|
|
|
E-MAILED CORRECTION TO MATT SIEGENTHALER, eta ARCHITECTS, CONCERNING ENERGY CODE COMPLIANCE FOR LIGHTING COMPLIANCE CERTIFICATE. WHAT WAS PRESENTED WAS DONE UNDER THE WRONG CODE YEAR AND WAS NOT CALCULATED IN ACCORDANCE TO CURRENT CODE, 2003 IECC.
|
Telephone call | | | 5/13/2005 | | DONE |
|
|
|
Call from Matt Siegenthaler, eta, concerning size of resubmittals. Need full size sheets to go into plans. 8-1/2" x 11" are not acceptable.
|
Plan resubmittals requested | | | 5/13/2005 | | DONE |
|
|
|
E-mailed to Matt Siegenthaler corrections pertaining to energy code complaince for the lighting. Need to be corrected and resubmitted to show code compliance.
|
BLD-Framing/Rough-in | 5/12/2005 | 5/12/2005 | 5/12/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/12/2005 at 8:21:13 AM. Contact: ###-####. Dan stwert with plan reveiw has a hold on this project no inspections ar o be done untill new plans are resubmitted
|
Plan Modification Accepted | | | 5/12/2005 | | DONE |
|
|
|
RECEIVED PLAN MODIFICATION APPLICATION TO ACCOMPANY PLANS OF 5/3/05.
|
Plan resubmittals received | | | 5/4/2005 | | DONE |
|
|
|
Received Transmittal & 3 Copys of sheets A0.01,A0.02,A0.03,A0.04,A2.11,A2.31,A5.11,A6.11,M1.00,M2.00,M3.00,P1.00,P2.00,EC1.0,E0.0,E1.0,E2.1F,E2.1L,E2.1P,E2.1S,E3.0,E3.1,E3.2 Taken to Dan S.
|
Issue PAID IN FULL permit | | | 4/19/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/3/2005 | | DONE |
|
|
|
lft vm bill ###-#### that permit and fees are ready to be picked up
|
Routing - PLAN CHECK | 2/1/2005 | | 2/2/2005 | | PASS |
|
|
|
Approved as noted on and attached plan review reports.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/2/2005 | | PASS |
|
|
|
To permit desk to issue.
|
Inspection Record Card- Bld | | | 2/2/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/2/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/2/2005 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 1/7/2005 | | 2/2/2005 | | PASS |
|
|
|
2/2/2005 07:11:38 DRS - activity updated through activity BLDA022 from case BLD05-00038.
|
Routing - FIRE | 1/27/2005 | | 2/1/2005 | | PASS |
|
|
|
|
1st review completed | | | 2/1/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/10/2005 | | 1/27/2005 | | PEND |
|
|
|
No resubmittals required. routing to fire code analyst for review.
|
Telephone call | | | 1/27/2005 | | DONE |
|
|
|
Called ETA and talked with Richard Honsinger concerning required clear floor space on breakroom side of pocket door per section 404.2.4.2, ICC/ANSI A117.1-98. This will require modification of base cabinet layout. I have red-lined on plans & Richard will follow up with contractor on his end. To be verified by structural inspector.
|
Routing - PUBLIC WORKS | 1/7/2005 | | 1/10/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/7/2005 | | DONE |
|
|
|
Received transmittal letter with three sets of sheets E1.0 put with plans.
|
Plans ACCEPTED BY PLAN TECH | | | 1/6/2005 | | DONE |
|
|
|
Lighting compliance needs to be resubmitted to the 2003IECC applicant will resubmitt.
|
Application received | | | 1/6/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/6/2005 | | DONE |
|
|
|
|
Fee Review-notes | 1/6/2005 | 1/6/2005 | | | |
|
|
|
|