Second Notice BLD | 5/25/2006 | 5/25/2006 | 6/12/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/5/2006 | 5/25/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/5/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10965 issued 4-5-06 to Hurtado Futniture in the Plaza 121 Bldg.
|
BLD-Final | 5/31/2005 | 6/1/2005 | 6/1/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 1:08:10 PM. Contact: ###-####.ok for temp occ ok for perm after fire gos perm
|
FIRE-Final Inspection | 5/31/2005 | 6/1/2005 | 6/1/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Permanent Occupancy | | 6/1/2005 | 6/1/2005 | | DONE |
|
|
|
|
BLD-Final | 5/26/2005 | 5/26/2005 | 5/27/2005 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/24/2005 at 2:40:53 PM. Contact: ###-####.
|
BLD-Final | 5/24/2005 | 5/25/2005 | 5/27/2005 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/24/2005 at 2:40:53 PM. Contact: ###-####. needs fire l/f signoff
|
FIRE-Final Inspection | 5/27/2005 | 5/27/2005 | 5/27/2005 | P | PART |
Forrest France
|
|
|
Fire life safety OK. Final pending water curtain at exit discharge basement level. Temp. occupancy given for first floor only, basement NOT to be occupied per Sam Rogers.
|
BLD-Final | 5/20/2005 | 5/23/2005 | 5/24/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/20/2005 at 4:19:04 PM. Contact: ###-####.needs other trades finaled first
|
FIRE-Final Inspection | 5/20/2005 | 5/23/2005 | 5/23/2005 | P | CANC |
Forrest France
|
|
|
Duplicate inspection, was meant for alarms already called in, per Dave GC.
|
FIRE-Alarm Testing | 5/20/2005 | 5/23/2005 | 5/23/2005 | A | FAIL |
Forrest France
|
|
|
Fail inspection, alarm and fire sprinkler need inspection and sign-off prior to bld. permit final. This inspection was for life safety final, of which several outstanding issues still need addresed.
|
BLD-Wall cover | 4/14/2005 | 4/14/2005 | 4/14/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/14/2005 at 7:41:44 AM. Contact: ###-####. shaft around evev and mec ok to cover 4/14/2005 4:27:19 PM
|
BLD-Framing/Rough-in | 4/5/2005 | 4/5/2005 | 4/5/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 10:17:49 AM. Contact: ###-####.soffites need to be self supporting 4/5/2005 3:17:01 PM
|
BLD-Framing/Rough-in | 3/28/2005 | 3/29/2005 | 3/29/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/28/2005 at 1:40:28 PM. Contact: ###-####.walls ok to cover 3/29/2005 9:57:09 AM
|
Issue PAID IN FULL permit | | | 3/15/2005 | | |
|
|
|
|
(F) Reprint permit | | | 3/15/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/23/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/23/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/23/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/23/2005 | | DONE |
|
|
|
talked to cory nelson at ###-#### that permit is ready
|
Plan assigned to (CJW) | 1/12/2005 | | 2/23/2005 | | PASS |
|
|
|
2/23/2005 08:05:40 CJW - activity updated through activity BLDA022 from case BLD05-00053.
|
Routing - FIRE | 2/11/2005 | | 2/22/2005 | | PASS |
|
|
|
Passed subject to comments; review faxed to architect.
|
1st review completed | | | 2/22/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/14/2005 | | 2/11/2005 | | PASS |
|
|
|
(1-20-04) The IBC plan review report was started on January 19 and was finished the next day. A response was required from the architect. See the plan review report. Project is "on hold" until drawings that show the basement expansion are submitted.
(2-11-05) Drawings showing the basement and the stairway connecting the basement and 1st story were reviewed. The drawings were approved with clarifications.
|
Plan resubmittals received | | | 2/7/2005 | | DONE |
|
|
|
Recvd transmittal letter, 2 copies of Structural Calculations and Plan review responses, 3 copies of A0.0, A0.1, A1.0, A1.1, A2.0, A2.1, A3.0, A4.0, and taken to Carl Westfall
|
Telephone call | | | 1/20/2005 | | DONE |
|
|
|
Was informed by the Architect's Rep. that this tenant will expand into the basement. Drawings will be submitted to show this. The project is "on hold" until such drawings are provided.
|
Routing - PUBLIC WORKS | 1/12/2005 | | 1/14/2005 | | PASS |
|
|
|
|
Application received | | | 1/11/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/11/2005 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/11/2005 | | DONE |
|
|
|
|
Fee Review-notes | 1/11/2005 | 1/11/2005 | | | |
|
|
|
|
Routing - PLAN CHECK | 2/22/2005 | | | | |
|
|
|
|