Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD05-00057
StatusFinaled
Name COLLIER'S INTERNATIONAL
Site Address 4619 W EMERALD ST
Project NameCONTINENTAL PLAZA
Customer Number 
ePlanReviewNo
Description
(HOLLAND REALTY)(CONTINENTAL PLAZA-STE 103) To remodel an existing office space for new tenant per approved plans. First floor is 1,778 sq.ft. of office and basement is 1,224 sq.ft. of storage. Work to include remodel of basement and first floor, upgrading restroom for accessibility, installation of new threshold at entry door, removal of interior paritions, construction of new partitions, installation of new handrails on existing stairs, miscelaneous related interior finishes. (Rmh) PLAN MODIFICATION (5/13/05) Architect has removed partition that divided space, modified office areas and removed training room to create one open office space. (RMH)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/20053/15/2006 DONE
Second Notice has not been responded to.
Second Notice BLD9/14/20059/14/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 7/12/20059/14/2005 DONE
FIRE-Final Inspection6/16/20056/16/20056/16/2005PPASS
DetailsTroy Cobbley
fire life safety finaled
BLD-Final6/16/20056/16/20056/16/2005PFAIL
DetailsTom Arcoraci
bill; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa cn posted
BLD-Final6/16/20056/16/20056/16/2005PPASS
DetailsTom Arcoraci
ok for perm
Permanent Occupancy 6/16/20056/16/2005 DONE
Details
Permanent occupancy UNPAID FEE  6/16/2005 DONE
Perm. Occ. Cert. # 10638 issued 6-16-05 to Holland Realty in the Continental Plaza Bldg.
FIRE-Conference6/15/20056/15/20056/15/2005PDONE
DetailsTroy Cobbley
###-####; I clarified door hardware requirements with contractor.
BLD-Final6/2/20056/3/20056/3/2005ANR
DetailsMike Jordan
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection6/2/20056/3/20056/3/2005AFAIL
DetailsTroy Cobbley
Remove manual flush bolts. See IFC 1008.1.8.4 and provide approved door hardware on all doors. See IFC 1008.1.8 and 1008.1.8.1
BLD-Final4/19/20054/19/20054/21/2005PNR
DetailsJim Storey
bill --call 1st before insp --pending fire fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie no insp. pending fire
FIRE-Final Inspection4/19/20054/19/20054/19/2005PFAIL
DetailsTroy Cobbley
Revised approved plans not on site
Receive PAYMENT IN FULL PRINT  4/15/2005 DONE
CHANGE STATUS TO (ISS)  4/15/2005 DONE
changed status to issued because of a plan mod
Permit Ready to Issue  4/14/2005  
Inspection Record Card- Bld  4/14/2005 DONE
Telephone call  4/14/2005 DONE
left mess that permit is ready for dave bliss at ###-####
Plan assigned to (R_H)3/24/2005 4/13/2005 PASS
4/13/2005 06:47:25 RMH - activity updated through activity BLDA022 from case BLD05-00057.
Case Summary (BLD)  4/13/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/13/2005 DONE
Plan Modification Accepted  3/30/2005  
Plan Modification due to budget constraints ,Except for toilet room & handicap access improvements,revisions to existing suite layout are being omitted, a double door to room # 106 & new interior finishes per original permit application will be retained in project scope.Sheets beingrevised ( A0.0,A2.1,A2.3 ) Routed to Ron Hill
CHANGE STATUS TO (REV)  3/29/2005 DONE
plan modification
BLD-Framing/Rough-in2/23/20052/24/20052/24/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! ###-#### - bill Note: please call 1/2 hr prior to inspection on 2/23/2005 at 11:27:24 AM.
BLD-Framing/Rough-in2/23/20052/24/20052/24/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/23/2005 at 11:27:24 AM. ada mens restroom ok to cover 2/24/2005 9:00:09 AM
Permit Ready to Issue  2/14/2005 DONE
Inspection Record Card- Bld  2/14/2005 DONE
Print Occupancy Form  2/14/2005 DONE
Telephone call  2/14/2005 DONE
Spoke with Dave and told him that permit is ready & fees///9:25am BAS
Issue PAID IN FULL permit  2/14/2005 DONE
Routing - PLAN CHECK1/27/2005 2/11/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/11/2005 DONE
Plan assigned to (R_H)1/12/2005 2/11/2005 PASS
2/11/2005 10:11:53 RMH - activity updated through activity BLDA022 from case BLD05-00057.
Plan resubmittals received  2/7/2005 DONE
Received Letter,Plan Review Report & 2 Copys of E2.1, E2.1D Taken to Ron H.
1st review completed  1/27/2005 FAIL
failed Plan check.
Routing - FIRE1/20/2005 1/27/2005 PASS
Subject to inspection. No review comments required.
Case Summary (BLD)  1/20/2005 DONE
Routing - PLAN CHECK1/13/2005 1/20/2005 FAIL
Mailed corrections to architect, fax did not work, Routed plans to Fire for review on 1/20/04
Routing - PUBLIC WORKS1/12/2005 1/13/2005 PASS
Application received  1/11/2005  
Recd Pcfee & Taken To Pln CK  1/11/2005  
Plans ACCEPTED BY PLAN TECH  1/11/2005 DONE
Fee Review-notes1/11/20051/11/2005   
Routing - PLAN CHECK3/30/2005