Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-00073
StatusFinaled
Name PJ SMITH
Site Address 4208 E TREKKER RIM DR
Project Name 
Customer Number 
ePlanReviewNo
Description
"THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a four bedroom, two and half bathroom 2541 sq. ft. two story single family dwelling (1543 sq. ft. first floor/998 sq. ft. second floor) with a attached 528 sq. ft. two car garage and a 148 sq. ft. covered front porch. Per approved plans, engineering and requirement list. (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/28/20056/29/20056/29/2005APASS
DetailsJim Storey
rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
DOC - Permit Finaled6/29/20056/29/20056/29/2005PPASS
DetailsJim Storey
BLD-Final6/27/20056/28/20056/28/2005AFAIL
DetailsJim Storey
please call when on way///rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need saftey glazing at front door/ need mech sign off.
BLD-Energy code compliance5/3/20055/3/20055/3/2005PPASS
DetailsJim Storey
rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in4/28/20054/28/20054/28/2005PPASS
DetailsJim Storey
ROB; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing2/9/20052/11/20052/11/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/9/2005 at 2:26:54 PM. Contact: ###-####.
BLD-Foundation2/9/20052/10/20052/10/2005APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/9/2005 at 2:27:31 PM. Contact: ###-####.
footings only ok 2/10/2005 12:02:05 PM
Issue PAID IN FULL permit  2/9/2005 DONE
Plan assigned to (SAM)1/12/20051/28/20052/3/2005 PASS
2/3/2005 13:51:03 SAM - activity updated through activity BLDA022 from case BLD05-00073.
Routing - PLAN CHECK1/18/2005 2/3/2005 PASS
Case Summary (BLD)  2/3/2005  
PLANS/APPL TAKEN TO FRONT DESK  2/3/2005 DONE
Permit Ready to Issue  2/3/2005 DONE
Inspection Record Card- Bld  2/3/2005 DONE
Telephone call  2/3/2005 DONE
Left a message for Rob that permit is ready & fees///2/3/05 2:40pm BAS
Plan Reviewer's activity  1/28/2005 DONE
I called and talked to the builder. He will get me engineering for the tall walls. Designer will get me a detail for upper deck. Plans are on hold.
Routing - PUBLIC WORKS1/14/2005 1/18/2005 PASS
Routing - PLANNING1/12/2005 1/14/2005 PASS
Application received  1/12/2005