Permit Information
Permit NumberBLD05-00097
StatusFinaled
Name MICHAEL S HOMAN
Site Address 3645 N CARTWRIGHT RD
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, three and half bathroom 3189 sq. ft. two story single family dwelling (2229 sq. ft. first floor/960 sq. ft. second floor) with a attached 1152 sq. ft. four car garage and a 565 sq. ft. covered back porch. Per approved plans, engineering and requirement list. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible space will be required. (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/19/2010 DONE
BLD-Final10/4/200610/5/200610/5/2006ADONE
DetailsDave Hannah
don; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Final10/5/200610/5/200610/5/2006PPASS
DetailsDave Hannah
don; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
DOC - Permit Finaled10/5/200610/5/200610/5/2006PPASS
DetailsDave Hannah
BLD-Grading Inspection10/5/200610/5/200610/5/2006 DONE
The rough grading and drainage has been completed. However, revegetation and the drainage ponds have not been completed. For this the engineer has recommended a bond of $4,000.00. Upon receipt of this bond the grading and drainage is conditionally approved
BLD-Conference10/3/200610/3/200610/3/2006PDONE
DetailsDave Hannah
call 1 hour prior to going; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Final9/29/200610/2/200610/2/2006ANR
DetailsTony Young
don; Phone #: ###-#### Please call gate/garage code Internet Inspection Request from: Cathy Chiles
need trades,, hillside,, etc.. phone conf. w/ Don on this
BLD-Energy code compliance12/7/200512/8/200512/8/2005APART
DetailsTony Young
don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
need to finish or justify frame around fireplaces,, also need to re-inspect mech for fireplace
BLD-Energy code compliance12/5/200512/6/200512/6/2005PNR
DetailsTony Young
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
need mech pass 1st
BLD-Framing/Rough-in11/7/200511/8/200511/8/2005PPART
DetailsTony Young
don ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
c/n posted,, ok to insulate,, will need to get more trades
BLD-Framing/Rough-in11/7/200511/7/200511/7/2005PNR
DetailsTony Young
don//plans on on the main level on top of fireplace; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
need seal pack,, finish framing around b-vent,, etc
Plan resubmittals received  8/30/2005  
Received resubmittal of plans and structural calculations for revised second floor framing plan. Routed to Steve M.
BLD-Framing/Rough-in8/17/20058/18/20058/18/2005PPART
DetailsMike Jordan
shear wall//don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. All hold downs in place as per plans. All strapping in place and nailed as per plans. TONY- Check your box for the paper work approving the use og staples, 36 guage used 1 7/8 inches long. Gave ok to cover based on what contractor noted and noting that the patern was still over what he had noted. Paper work should be faxed by 8-19-05. Also had paper work on site.
BLD-Framing/Rough-in8/12/20058/15/20058/15/2005AFAIL
DetailsTony Young
shear wall//call for access code for gate//don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
need letter from structural engineer on " OK AS BUILT" or do as plans,, lots of detail,,, conf. only
BLD-Framing/Rough-in5/2/20055/3/20055/3/2005APART
DetailsTony Young
under floor inspection//don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
wip on underfloor,, point loads in/ marked 5/3/2005 12:26:51 PM
Case Summary (BLD)  4/25/2005  
BLD-Footing4/5/20054/6/20054/6/2005APART
DetailsTony Young
don ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Grading Inspection4/4/20054/4/20054/4/2005 DONE
footing subgrade approved by the geotyechnical engineer
PubWorks Subgrade Approval1/26/20051/26/20054/4/2005 DONE
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
Override - Activity Holds  3/18/2005  
Issue PAID IN FULL permit  3/18/2005 DONE
Plan assigned to (SAM)2/11/2005 3/15/2005 PASS
3/15/2005 13:54:24 SAM - activity updated through activity BLDA022 from case BLD05-00097.
Routing - FIRE3/15/2005 3/15/2005 PASS
Approved without fire sprinklers based on the following repsonse from Dave Miller. "The Fire Department finds that the water supply and access requirements stipulated for this project by the direction of Council appear to have been sufficiently satisfied for Fire to issue a preliminary approval. Therefore, Fire has no objection to the plat being finalized or to building construction permits being processed. Please note that the final acceptance of fire hydrants and any unfinished or temporary features is not possible at this time. In the interest of customer service however the fire department can issue this preliminary approval. Please note that this preliminary approval applies only to water supply and access requirements of the IFC. The requirements of other City departments, codes, permits, and ordinances (including the IFC) may not yet be completely satisfied. Specific items for which final approval has not been issued include, but are not limited to, temporary street signs; temporary access roads; actual building construction type, code requirements, and area; and hydrant depth and clearance as may be affected by landscaping."
Case Summary (BLD)  3/15/2005  
PLANS/APPL TAKEN TO FRONT DESK  3/15/2005 DONE
Inspection Record Card- Bld  3/15/2005 DONE
Print Occupancy Form  3/15/2005 DONE
Override - Activity Holds  3/15/2005  
Permit Ready to Issue  3/15/2005 DONE
Telephone call  3/15/2005 DONE
Telephone call  3/15/2005 DONE
called cory ###-#### advised permit is ready & quoted fees///JRR
Routing - PLAN CHECK1/31/2005 3/8/2005 PASS
Plan review is done. Plans are waiting for Fire to pass.
Plan Reviewer's activity  2/15/2005 DONE
2/15/05 16:35 I e-mailed Dave Miller to find out the progress of the fire department approval.
Routing - Erosion and Sediment2/12/2005 2/14/2005 PASS
ESC plan approved with attached conditions.
Routing - FIRE1/28/2005 1/31/2005 FAIL
1/28/05 - appears it will require AS due to inadequate FD access. Refered to D. Miller to review with architect. Dave will advise decision on AS within next day or two.
1/31/05 - emai from Dave Miller : "I just met with an architect on a proposed house for this lot. There are several problems. First there appears to be a non-build agreement on Lots 1 & 3 which has not yet been released. Second, there is no SAT memo for Lots 2 & 4. Lastly, the aforementioned house shows a sub standard fire access lane. The applicant's choices are to make the driveway 20 ft wide along the entire length and expand the turnaround to fire code standards; or fire sprinkler the house. Of course, these choices are mute until the SUB conditions of issuing a SAT memo and releasing the non-build are satisfied."
Routing - Erosion and Sediment1/28/2005 1/28/2005 FAIL
ESC plan not per requirements outlined in BMC 8-17. Informed PD. Checklist completed.
Routing - PLANNING1/26/2005 1/27/2005 PASS
Routed to Carl Miller per CFH02-00012.
Routing - PUBLIC WORKS GRADING1/20/2005 1/26/2005 PASS
Approved as Category 3
Routing - PUBLIC WORKS1/26/2005 1/26/2005 PASS
Application received  1/19/2005