BLD-Final | 7/13/2005 | 7/14/2005 | 7/14/2005 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/13/2005 at 11:44:08 PM. Contact: ###-####.
|
DOC - Permit Finaled | 7/14/2005 | 7/14/2005 | 7/14/2005 | P | PASS |
Tony Young
|
|
|
|
BLD-Grading Inspection | 7/13/2005 | 7/13/2005 | 7/13/2005 | | DONE |
|
|
|
final grading and drainage approved
|
BLD-Framing/Rough-in | 4/12/2005 | 4/13/2005 | 4/13/2005 | A | PASS |
Tony Young
|
|
|
Heather ###-####
|
BLD-Energy code compliance | 4/12/2005 | 4/13/2005 | 4/13/2005 | A | PASS |
Tony Young
|
|
|
Heather ###-####
|
BLD-Final | 4/8/2005 | 4/12/2005 | 4/12/2005 | A | NR |
Tony Young
|
|
|
Heather ###-####
|
BLD-Energy code compliance | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | PART |
Tony Young
|
|
|
Heather ###-####
need full signoff on sprinklers,, add insulation to rim joist by front door 4/12/2005 4:52:32 PM
|
FIRE-Final Inspection | 4/8/2005 | 4/11/2005 | 4/11/2005 | P | PART |
Troy Cobbley
|
|
|
Heather ###-#### Finish tenting in the master bedroom and in the first floor office. Master bedroom has sprinkler pendant installed too close to the fire place. There is exposed 1" CPVC pipe on top of the arch entry ot the master bedroom. Must meet requi
|
FIRE-Final Inspection | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | CANC |
Troy Cobbley
|
|
|
heather Note: request after 3:00 pm; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | NR |
Tony Young
|
|
|
heather Note: request after 4:00 pm; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 4/4/2005 | 4/5/2005 | 4/5/2005 | A | FAIL |
Tony Young
|
|
|
heather ; Phone #: ###-#### Note: please call 1/2 hr prior to inspection Internet Inspection Request from: Cathy Chiles
c/n posted,,, need sprinkler sign off,,, ok to insulate walls only 4/5/2005 11:23:11 AM
|
BLD-Framing/Rough-in | 3/18/2005 | 3/18/2005 | 3/18/2005 | P | PART |
Troy James
|
|
|
please call prior to inspection///heather; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
pre-frame inspection and shear ok 3/18/2005 1:59:02 PM
|
BLD-Framing/Rough-in | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | PART |
Tony Young
|
|
|
retaining wall --ben ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
wip on 2' retaining wall,,, ftgs already poured 2/22/2005 2:56:06 PM
|
BLD-Foundation | 2/15/2005 | 2/15/2005 | 2/15/2005 | P | PART |
Tony Young
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Grading Inspection | 2/14/2005 | 2/14/2005 | 2/14/2005 | | DONE |
|
|
|
footing subgrade approved 4 inches of loose material is removed
|
BLD-Footing | 2/14/2005 | 2/14/2005 | 2/14/2005 | P | PART |
Tony Young
|
|
|
Ben; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
PubWorks Subgrade Approval | 1/28/2005 | 1/28/2005 | 2/14/2005 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
|
Override - Activity Holds | | | 2/14/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/14/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 1/20/2005 | 2/8/2005 | 2/11/2005 | | PASS |
|
|
|
2/11/2005 13:46:17 SAM - activity updated through activity BLDA022 from case BLD05-00107.
|
Routing - PLAN CHECK | 1/31/2005 | | 2/11/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 2/11/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 2/11/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/11/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/11/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 2/11/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 2/11/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/11/2005 | | DONE |
|
|
|
tlk heather rice ###-#### that her permit and fees are ready to be picked up
|
Routing - Erosion and Sediment | 1/28/2005 | | 1/31/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 1/31/2005 | | 1/31/2005 | | PASS |
|
|
|
This house requires an NFPA 13D automatic fire sprinkler system, modified to include the installation of a single row of dry sidewall sprinklers along the wall common to the attached garage and the living space.
|
Routing - PUBLIC WORKS GRADING | 1/28/2005 | | 1/28/2005 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS | 1/28/2005 | | 1/28/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 1/28/2005 | | 1/28/2005 | | PASS |
|
|
|
Site Plan/Setbacks are approved based on the grading plan, as initialed.
|
Routing - PUBLIC WORKS GRADING | 1/20/2005 | | 1/20/2005 | | FAIL |
|
|
|
Grading plan needs revision
|
Application received | | | 1/20/2005 | | |
|
|
|
|