Third Notice BLD | 12/6/2005 | 12/6/2005 | 3/15/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 7/13/2005 | 7/13/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/23/2005 | 7/13/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/23/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10588 issued 5-23-05 to the American Institute of Health - Apollo College.
|
BLD-Final | 5/18/2005 | 5/19/2005 | 5/19/2005 | P | PASS |
Tom Arcoraci
|
|
|
bill Note: late afternoon - please call 1/2 hr prior to inpsection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm
|
FIRE-Final Inspection | 5/18/2005 | 5/19/2005 | 5/19/2005 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
Code Occupancy Approval | 5/19/2005 | 5/19/2005 | 5/19/2005 | P | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF 5/19/2005 2:36:39 PM
|
Permanent Occupancy | | 5/19/2005 | 5/19/2005 | | DONE |
|
|
|
|
BLD-Final | 5/5/2005 | 5/5/2005 | 5/5/2005 | P | NR |
Tom Arcoraci
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa needs fire zoning
|
BLD-Framing/Rough-in | 3/28/2005 | 3/28/2005 | 3/28/2005 | P | PASS |
Tom Arcoraci
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok pending mech ri 3/28/2005 2:41:37 PM
|
BLD-Footing | 3/25/2005 | 3/25/2005 | 3/25/2005 | P | PASS |
Tom Arcoraci
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Plan Reviewer's activity | | | 3/21/2005 | | PASS |
|
|
|
Reviewed revised drawings. Ramps and stairs will be of wood NOT concrete. An interior beam and columns will be installed.
|
BLD-Footing | 3/16/2005 | 3/16/2005 | 3/16/2005 | P | PASS |
Tom Arcoraci
|
|
|
Bill; Phone #: ###-#### Internet Inspection Request from: Jan Rice hds ok spec insp by mti 3/16/2005 3:45:01 PM
|
BLD-Framing/Rough-in | 3/14/2005 | 3/15/2005 | 3/15/2005 | P | PART |
Jim Sly
|
|
|
shear nail -- bill ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Shear nail OK at W. N. and E. walls only...... Architect to submit stamped detail for waterproofing bldg below grade. Fairview....S on Liberty at Zamzows. 3/15/2005 3:26:05 PM 3/15/2005 3:28:22 PM
|
Plan resubmittals received | | | 3/15/2005 | | DONE |
|
|
|
Received 2 Ccops of sheets RA2.1,RA4.1,RA8.1 Taken to Carl W.
|
Issue PAID IN FULL permit | | | 2/24/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/18/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/18/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/18/2005 | | DONE |
|
|
|
called Dave ###-#### advised plans ready & fees
|
Plan assigned to (CJW) | 1/25/2005 | | 2/18/2005 | | PASS |
|
|
|
2/18/2005 10:38:56 CJW - activity updated through activity BLDA022 from case BLD05-00115.
|
Routing - PLAN CHECK | 2/10/2005 | | 2/18/2005 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 2/17/2005 | | DONE |
|
|
|
Received 2 Project Memos & 2 Copys of sheets COVER,A0.1,A2.1,A4.1,A8.1,P1.0,P1.1 Taken to Carl W.
|
Plan resubmittals received | | | 2/17/2005 | | DONE |
|
|
|
Received Transmittal , & 2 Structural Calcs. Taken to Carl W.
|
Routing - PLANNING | 2/9/2005 | | 2/10/2005 | | PASS |
|
|
|
Approved per DRH05-00016.
|
Routing - PLAN CHECK | 2/8/2005 | | 2/9/2005 | | |
|
|
|
Sent back to Planning
|
1st review completed | | | 2/8/2005 | | FAIL |
|
|
|
failed Planning and plan check.
|
Routing - FIRE | 2/2/2005 | | 2/8/2005 | | PASS |
|
|
|
|
Routing - PLUMBING | 2/1/2005 | | 2/2/2005 | | PASS |
|
|
|
pipe water heater pan drain to exterior. verify premise cross connection protection with field inspector.
|
Routing - PLAN CHECK | 1/26/2005 | | 2/1/2005 | | FAIL |
|
|
|
The IBC plan review was started on January 28, 2005 and was finished on February 1, 2005. Resubmitted drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 1/25/2005 | | 1/26/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 1/26/2005 | | 1/26/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 1/26/2005 | | 1/26/2005 | | FAIL |
|
|
|
Sarah Schafer DRH05-00016
I am not yet finished with the Design Review on this project. I hope to have it finished by Monday, January 31, 2005. Once the application is finished I will let Carl know.
|
Pending Assignment by MYS | 1/20/2005 | | 1/25/2005 | | DONE |
|
|
|
1/25/2005 09:35:07 MYS - activity updated through activity BLDA172 from case BLD05-00115.
|
Plan resubmittals received | | | 1/25/2005 | | DONE |
|
|
|
Received 3 Copys of sheets P0.0, P0.1, P1.0,P1.1,P2.0, EN0.0, M0.0,M0.1, M1.0,E1.1, E0.1 Taken to Carl W.
|
Plans ACCEPTED BY PLAN TECH | | | 1/24/2005 | | DONE |
|
|
|
Letter from Sara S. attached to the Application. Mechanical Code -2000 , Lighting Code - 2000 They were told about the 2003 code when they submitted the plans.
|
Application received | | | 1/20/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/20/2005 | | |
|
|
|
|
Fee Review-notes | 1/20/2005 | 1/20/2005 | | | |
|
|
|
|