Expired/Cancelled | 3/17/2014 | 3/17/2014 | 3/17/2014 | | FAIL |
Bob Archibald
|
|
|
No requests for required inspections. No activity or contractors on site has exceeded time limitations on permit since renewal.
|
BLD-Aging Inspection | 12/5/2013 | 12/5/2013 | 12/10/2013 | | NR |
Bob Archibald
|
|
|
No request for inspections. No new activity at site.
|
BLD-Aging Inspection | 9/5/2013 | 9/5/2013 | 9/9/2013 | | NR |
Bob Archibald
|
|
|
No request for inspection
|
BLD-Conference | 5/28/2013 | 5/29/2013 | 5/29/2013 | A | PEND |
Tony Young
|
|
|
status review,, 325 in charge of
|
BLD-Conference | 5/28/2013 | 5/29/2013 | 5/29/2013 | A | PEND |
Tony Young
|
|
|
status review
|
FIRE-Conference | 2/19/2013 | 2/21/2013 | 2/21/2013 | A | DONE |
Forrest France
|
|
|
On site conference with contractor regarding project related fire alarm and sprinkler trade work, finish schedule, plan review, conditions for occupancy, IFC and NFPA requirements.
|
BLD-Other | 2/19/2013 | 2/19/2013 | 2/19/2013 | A | PEND |
Bob Archibald
|
|
|
Conference with Noah on requirements to obtain letter of compliance on shell. No occupancy approved.
|
BLD-Aging Inspection | 12/4/2012 | 12/4/2012 | 12/11/2012 | | PEND |
Tony Young
|
|
|
|
Inspection Record Card- Bld | | | 12/10/2012 | | DONE |
Tisha Gallop
|
|
|
|
Fees Due Hold | 12/1/2012 | | 12/3/2012 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/3/2012 | | DONE |
Tisha Gallop
|
|
|
reopen permit per Bob A., fee paid - same contractor still on job
|
(F) Reprint permit | | | 12/3/2012 | | DONE |
Tisha Gallop
|
|
|
|
DOC - Permit Expired | | | 2/4/2011 | | DONE |
Bob Archibald
|
|
|
Spoke with Brian, superintendant, and informed him of outstanding issues and that permit would have to be reactivated to obtain final inspection sign off.
|
BLD-Conference | 1/3/2011 | 1/3/2011 | 1/3/2011 | A | PASS |
Bob Archibald
|
|
|
Spoke with architect Larry Sundell and also left voice message with Bill Strack. Project completion required by January 31st or permit will be expired.
|
BLD-Conference | 11/15/2010 | 11/15/2010 | 11/15/2010 | P | FAIL |
Bob Archibald
|
|
|
Conference with Bradley (###-####) the superintendent and informed him that this permit must have a final inspection prior to January 1, 2011.
Failure to complete remaining items required for a final will result in expiration of permit
|
BLD-Aging Inspection | 11/8/2010 | 11/8/2010 | 11/9/2010 | | PEND |
Tony Young
|
|
|
325 is handling this
|
Case Summary (BLD) | | | 9/23/2010 | | DONE |
|
|
|
|
BLD-Aging Inspection | 9/8/2010 | 9/8/2010 | 9/9/2010 | | PEND |
Tony Young
|
|
|
325 in charge of
|
Case Summary (BLD) | | | 9/2/2010 | | |
|
|
|
|
BLD-Aging Inspection | 7/7/2010 | 7/7/2010 | 7/7/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 5/7/2010 | 5/7/2010 | 5/7/2010 | P | PART |
Bob Archibald
|
|
|
Status unchanged only minor improvements.
|
BLD-Aging Inspection | 4/19/2010 | 4/19/2010 | 4/20/2010 | | PEND |
Tony Young
|
|
|
|
DOC - Permit Expired | 4/20/2010 | 4/20/2010 | 4/20/2010 | A | CANC |
Tony Young
|
|
|
|
BLD-Conference | 2/11/2010 | 2/11/2010 | 2/11/2010 | P | PART |
Bob Archibald
|
|
|
Discussed with new superintendant requirements for obtaining a final on shell permit. No noticable improvements since last inspection (1 worker).
|
BLD-Aging Inspection | 11/20/2009 | 11/20/2009 | 11/27/2009 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/9/2009 | 9/9/2009 | 9/15/2009 | | PEND |
Tony Young
|
|
|
|
BLD-Other | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | PART |
Bob Archibald
|
|
|
Reviewed site, finish work in progress (Slow)
|
Meeting | | | 2/25/2009 | | PART |
Bob Archibald
|
|
|
Site review of elevator shaft requirements.
|
BLD-Other | 2/5/2009 | 2/5/2009 | 2/5/2009 | A | PART |
Bob Archibald
|
|
|
Slow progress. Finish work going on. Further discussion of purchasing adjavent building.
|
BLD-Conference | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PART |
Bob Archibald
|
|
|
Conference with owner and contractor on requirements for final. Provided occupancy request card for signatures.
|
Print Occupancy Form | | | 12/1/2008 | | DONE |
|
|
|
|
BLD-Aging Inspection | 11/10/2008 | 11/10/2008 | 11/14/2008 | | DEFR |
Tony Young
|
|
|
325 is taking care of this
|
BLD-Conference | 9/10/2008 | 9/10/2008 | 9/10/2008 | P | PART |
Bob Archibald
|
|
|
Site conference with mechanical inspector and job super on duct openings and rated construction. No openings/penetrations allowed in stair enclosure from basement to first floor.
|
BLD-Other | 7/16/2008 | 7/16/2008 | 7/16/2008 | A | PART |
Bob Archibald
|
|
|
Review of basement and main floor. still have outstanding issues on mechanical systems and exterior windows (COA). Also discussed fire alarm progress and relocation of sprinkler lines. Fire blocking and south soffit made ok sheetrock installation in progress.
|
BLD-Other | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PASS |
Bob Archibald
|
|
|
Exterior patio stairs to upper level made ok rise/run.
|
BLD-Framing/Rough-in | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PART |
Bob Archibald
|
|
|
CN issued for cover of basement and main floor, reinspection required prior to complete cover.
|
BLD-Other | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PART |
Bob Archibald
|
|
|
Work in progress (slow) noncomplying stairway to upper patio has been removed. Electrical contractor on site performing work in basement mechanical room, service drop on north end has been run underground and violtions corrected so that Idaho Power can contect new service drop to building.Plans for 2nd floor are still under review (pending fire and structural).
|
BLD-Conference | 4/23/2008 | 4/23/2008 | 4/23/2008 | A | PART |
Bob Archibald
|
|
|
Phone conference with Noah on elevator shaft requirements. State regulates car and mechanics.
|
BLD-Other | 4/1/2008 | 4/1/2008 | 4/1/2008 | P | PART |
Bob Archibald
|
|
|
Elevator shaft framing approved for cover.
|
BLD-Other | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | FAIL |
Bob Archibald
|
|
|
CN issued on outstanding issues. Reviewed site with Noha phone conference with Bill.
|
(F) Reprint permit | | | 2/25/2008 | | |
|
|
|
|
BLD-Aging Inspection | 2/18/2008 | 2/18/2008 | 2/21/2008 | | DEFR |
Tony Young
|
|
|
325 is taking care of this
|
BLD-Other | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | PART |
Bob Archibald
|
|
|
Review of elervator shaft construction and overall status of construction. 1st story shaft construction in progress. 1 carpenter on site, no new progress elsewhere.
|
Telephone call | | | 2/14/2008 | | PART |
Bob Archibald
|
|
|
Phone conference with Bill Strack reminded him that resubitted plans are ready to pick up and addresses elevator requirements. When plans are issued we can field review requirements.
|
(F) Reprint permit | | | 2/14/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/14/2008 | | DONE |
|
|
|
picked up and paid for plan modification
|
Routing - FIRE | 1/29/2008 | | 1/29/2008 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans. Routed to plan check.
|
Routing - PLAN CHECK | 1/29/2008 | | 1/29/2008 | | PASS |
Bob Archibald
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/29/2008 | | |
|
|
|
|
Telephone call | | | 1/29/2008 | | DONE |
|
|
|
called Larry Sundell and told him permit is ready and fee
|
Override - Parcel Holds | | | 1/29/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 1/29/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/25/2008 | | 1/29/2008 | | PASS |
Bob Archibald
|
|
|
PLAN MODIFICATION routing for plans received on 1/9/08. To be reviewed by Bob Archibald. Routed to fire.
|
Plan assigned to (MYS) | 1/9/2008 | | 1/29/2008 | | PASS |
Bob Archibald
|
|
|
1/29/2008 15:58:34 325 - activity updated through activity BLDA022 from case BLD05-00128.
|
Routing - PLANNING | 1/23/2008 | | 1/25/2008 | | PASS |
Julie Archambeault
|
|
|
PLAN MODIFICATION routing for plans received on 1/9/08. To be reviewed by Julie Archambeault.
The fence can only be 48" tall from the front property line to the front setback-see condition of approval on C of A.
|
Routing - Erosion and Sediment | 1/22/2008 | | 1/23/2008 | | PASS |
Steven Webb
|
|
|
original esc still approved with the attached conditions.
|
Routing PW Sewer Rating | 1/22/2008 | | 1/22/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PUBLIC WORKS | 1/22/2008 | | 1/22/2008 | | PASS |
Beverly Hall
|
|
|
|
Meeting | | | 1/15/2008 | | PART |
Bob Archibald
|
|
|
1 hour construction of south sofit in progress. Slow work in progress 1 carpenter on site no significant work since last inspection. Resubittals submitted and are being routed through PDS. Informed super to contact me when any rough ins are approved or any work requiring inspection is completed.
|
Plan Modification Accepted | | | 1/9/2008 | | |
|
|
|
Plan modification accepted to add 190 sf. to second level. Add elevator shaft, enlarge fron entry canopy, add back fence. Plan shows mechanical areas and recesses in st.; Submitted on pages One A, Three A, Four, Eight, Ten, Eleven, M-1, S3, S4; routed to Marlene S.
|
Override - Parcel Holds | | | 1/9/2008 | | |
|
|
|
|
BLD-Other | 12/5/2007 | 12/5/2007 | 12/5/2007 | A | FAIL |
Bob Archibald
|
|
|
CN issued for south soffit, 1 hour construction not verified before covering. Inspection opening requested.
|
BLD-Conference | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | PART |
Bob Archibald
|
|
|
Conference with architect on revised plan requirements.
|
BLD-Other | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PART |
Bob Archibald
|
|
|
Welding inspection report from G3 all welding in compliance to date. Exterior railing welding to be completed.
|
BLD-Other | 11/13/2007 | 11/13/2007 | 11/13/2007 | A | FAIL |
Bob Archibald
|
|
|
Phone conference with Noah on stair run requirements 11" minimum required, 10" not allowed on exterior stairs to patio. Correction Required.
|
BLD-Conference | 11/1/2007 | 11/1/2007 | 11/1/2007 | A | FAIL |
Bob Archibald
|
|
|
CN issued requesting revised plans be submitted to plan review on as builts and DR approvals to date. No framing cover will be allowed until submitted and approved.
|
BLD-Aging Inspection | 10/22/2007 | 10/22/2007 | 10/29/2007 | | PEND |
Tony Young
|
|
|
325 taking care of
|
Meeting | | | 10/10/2007 | | PART |
Bob Archibald
|
|
|
Phone conference on status.
|
Meeting | | | 9/12/2007 | | PART |
Bob Archibald
|
|
|
Review of interior stairway to 2nd floor risers at bottom are not correct. Will be recalled for inspection.
|
MISC ACTIONS | | | 9/10/2007 | | PART |
Bob Archibald
|
|
|
Review of current status
|
CHANGE STATUS TO (ISS) | | | 7/18/2007 | | |
|
|
|
picked up plans
|
Routing - PLUMBING | 7/12/2007 | | 7/16/2007 | | PASS |
|
|
|
no notes provided with this plumbing project. assume tank type toilets. and all pipe sizing per upc.
|
Plan resubmittals received | | | 7/12/2007 | | |
|
|
|
Received 1 cover letter from Larry Sundel, 2 copies of sheets 1-A, 1st floor water & gas plan, 1st floor waste & vent plan for additional rest room and given to Bob Archibald
|
Meeting | | | 6/27/2007 | | PART |
Bob Archibald
|
|
|
General conference on construction schedule.
|
Meeting | | | 6/15/2007 | | PART |
Bob Archibald
|
|
|
Site meeting to discuss stairs, rated construction, guardrails, window openings. Soffit had been covered on south wall without inspection soffit will be reopened to allow installation and inspection of fire protection, requested engineering on tourch cut beams in basement and doug fir in contact with concrete.
|
Meeting | | | 6/12/2007 | | PART |
Bob Archibald
|
|
|
MEETING WITH PLUMBING CONTRACTOR AND INSPECTOR ON PLUMBING INSTALLATIONS. SITE REVIEW OF CURRENT PROGRESS.
|
Telephone call | | | 6/7/2007 | | PART |
Bob Archibald
|
|
|
Phone conference with plumbing contractor on permit reguirements.
|
BLD-Other | 5/24/2007 | 5/24/2007 | 5/24/2007 | A | PART |
Bob Archibald
|
|
|
Resubmittals approved and plans are ready to be picked up.
|
CHANGE STATUS TO (ISS) | | | 5/24/2007 | | |
|
|
|
changed status - already issued - plan mod
|
(F) Reprint permit | | | 5/24/2007 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 12/22/2006 | 12/22/2006 | 5/22/2007 | | PASS |
|
|
|
5/22/2007 08:41:00 M_P - activity updated through activity BLDA022 from case BLD05-00128.
|
Routing - PLAN CHECK | 4/18/2007 | | 5/22/2007 | | PASS |
|
|
|
PLAN MODIFICATION *
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2007 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 5/22/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 5/22/2007 | | |
|
|
|
|
Telephone call | | | 5/22/2007 | | DONE |
|
|
|
left mess for larry sundell at ###-#### that plans are ready
|
Plan resubmittals received | | | 5/16/2007 | | |
|
|
|
received response letter from sundell arch & "2" sets of structural calcs (13) pages each & "2" sheets each of eight, E-1, & E-2--plans taken to Mike Phillips
|
Telephone call | | | 5/8/2007 | | PART |
Bob Archibald
|
|
|
Phone conference with Bill S. on plumbing, retaining wall and plan resubmittal.
|
Meeting | | | 5/7/2007 | | PART |
Bob Archibald
|
|
|
Conference with super (Noah) and Lee R. (plumbing super) regarding water supply line. A maintanance plumbing permit is authorized for installation of supply line only no interior building plumbing is allowed.
|
BLD-Concrete | 4/20/2007 | 4/20/2007 | 4/20/2007 | P | PART |
Bob Archibald
|
|
|
Parapet wall on north patio also reviewed furr out framing in basement.
|
Routing - PLAN CHECK | 1/24/2007 | | 4/18/2007 | | FAIL |
|
|
|
PLAN MODIFICATION * Sent correction report to the architect requesting additional information to be submitted for further review prior to issuing permit.
|
Plan resubmittals received | | | 4/12/2007 | | PART |
Bob Archibald
|
|
|
Requested resubmittals received.
|
Plan resubmittals received | | | 4/10/2007 | | |
|
|
|
Recieved 1 response letter (2pgs), 1 copy of response letter from Stapley Engineering, 1 copy of Project Start up for Special Inspections, 2 copies of Structural Calcs, 2 copies of the following sheets, 1A, 3A, 4, 8, M-1, M-2, P-1, P-2, E-1, E-2 and taken to Mike Phillips
|
BLD-Other | 3/29/2007 | 3/29/2007 | 3/29/2007 | P | PART |
Bob Archibald
|
|
|
Conference on riser heights, headroom clearance in main building and resubmittals
|
BLD-Concrete | 3/23/2007 | 3/23/2007 | 3/23/2007 | A | PART |
Bob Archibald
|
|
|
Interior concrete stairs/landing (Headroom Clearance to be addressed). Exterior patio wall, special inspection performed
|
BLD-Foundation | 3/12/2007 | 3/12/2007 | 3/12/2007 | P | PART |
Bob Archibald
|
|
|
Last section of north wall. special inspection and engineering review had been performed. Remined Bill that plan review still waiting on resubmittals.
|
Meeting | | | 3/2/2007 | | PART |
Bob Archibald
|
|
|
Onsite meeting with Noah on project scheduling, reviewed framing, siding and north exterior below grade stair (footing/foundation). Resubmittals still required before revised permit issued.
|
BLD-Other | 2/14/2007 | 2/14/2007 | 2/14/2007 | A | PART |
Bob Archibald
|
|
|
Site review, conference with contractor on roof/soffit, 2nd story windows on south end, stairs etc..
|
BLD-Other | 2/7/2007 | 2/7/2007 | 2/7/2007 | P | PART |
Bob Archibald
|
|
|
Site review.
|
Routing - FIRE | 1/22/2007 | | 1/24/2007 | | PASS |
|
|
|
PLAN MODIFICATION * Attached updated fire review comments to approved plans.
|
Routing - PLAN CHECK | 1/12/2007 | | 1/22/2007 | | FAIL |
|
|
|
PLAN MODIFICATION *4) Sent correction report to the architect, requesting additional information to be submitted for further review prior to issuing permit.
|
Routing - PLANNING | 1/5/2007 | | 1/12/2007 | | PASS |
|
|
|
PLAN MODIFICATION * 2) Julie A
|
Routing - PLANNING Land Div | 1/3/2007 | | 1/5/2007 | | PASS |
|
|
|
PLAN MODIFICATION * 1)
|
Routing - PUBLIC WORKS | 1/5/2007 | | 1/5/2007 | | PASS |
|
|
|
PLAN MODIFICATION * 3)
|
MISC ACTIONS | | | 1/2/2007 | | PART |
Bob Archibald
|
|
|
Blocking of shear panel edges completed on 1st floor only.
|
Plan Modification Accepted | | | 12/22/2006 | | |
|
|
|
plan mod excepted for bld05-00128 for the redesign -add approximately 220 sq. ft. of space to 2nd level, add exterior deck space, reconfigure basement access, add approximately 200 sq.ft. to basement, & design ada ramp to building. received one A,three A, four, eight, SO,S1*, S1, S2*, S2, S3*, S3, S4*, S4, S5, S6, S7, S8, S9*, M-1, M-2, E-1. E-2. P-1, & P-2. plans taken to mike phillips
|
BLD-Wall cover | 12/19/2006 | 12/19/2006 | 12/19/2006 | P | PART |
Bob Archibald
|
|
|
Exterior shear walls, CN issued.
|
BLD-Conference | 11/15/2006 | 11/15/2006 | 11/15/2006 | P | PART |
Bob Archibald
|
|
|
Met with architect and discussed requirements for resubmittals for all trades/aspects of structure, new structural, architectual, electrical, plumbing and mechanical drawings required. Framing crew has been hired and framing is progressing quickly on exterior of structure.
|
BLD-Concrete | 11/8/2006 | 11/8/2006 | 11/8/2006 | P | PART |
Bob Archibald
|
|
|
Remainder of 2nd floor concrete slab placed today. Requested revised details reflecting changes and Historic approvals.
|
BLD-Conference | 10/18/2006 | 10/18/2006 | 10/18/2006 | P | PART |
Bob Archibald
|
|
|
Discussion on schedule and current status. Reinforcing steel being placed for secound floor concrete placement.
|
BLD-Other | 10/4/2006 | 10/4/2006 | 10/4/2006 | P | PART |
Bob Archibald
|
|
|
Ground level floor slab placed last week special inspection and engineer reviewed prior to concrete placement. 5/8ths type X gypsum applied to exterior south wall and OSB placed on exterior, shear nailing has not been completed(1st floor level only).
|
BLD-Other | 9/22/2006 | 9/22/2006 | 9/22/2006 | P | PART |
Bob Archibald
|
|
|
Site conference with Bill Strack and Larry Sundell on required resubmittals reflecting changes approved by historic commision and as builts, also discussed stair requirements, rise/run. Phone conference with engineer on south wall requirements to meet shear and fire rating. OSB will be removed gyp rock installed and OSB applied over gyp and nailed at 4" oc.. 1st floor slab to scheduled to be placed 9/25/06.
|
BLD-Other | 9/6/2006 | 9/6/2006 | 9/6/2006 | A | PART |
Bob Archibald
|
|
|
COnference with engineer of record and Bill Strack on concrete slabs, shear walls and misc. details. Basement floor slab was placed 9/01/06 except northeast corner, exterior wall framing scheduled to commence with 1st and 2nd floor concrete placement in concurance. Special inspection required on all concrete, reinforcing steel and site welding.
|
BLD-Foundation | 7/12/2006 | 7/12/2006 | 7/12/2006 | P | PART |
Bob Archibald
|
|
|
Concrete placement on remaining north foundation wall placed, special inspector on site. Perimeter footing/foundation now complete.
|
Code Occupancy Approval | 6/30/2006 | 6/30/2006 | 7/3/2006 | P | CANC |
Wm. Michael Meloy
|
|
|
|
BLD-Conference | 6/6/2006 | 6/6/2006 | 6/6/2006 | A | PART |
Bob Archibald
|
|
|
Slow progress, only one worker on site. North foundation wall framing nearly complete and concrete placement scheduled for the near future. Additional structural steel framing has been placed and 1st floor pan deck installation near completion.
|
BLD-Footing | 4/6/2006 | 4/6/2006 | 4/6/2006 | A | PASS |
Bob Archibald
|
|
|
Remaining north wall footing placed 3/31/06, special inspection was provided. Foundation wall reinforcing being placed at this time.
|
BLD-Other | 3/24/2006 | 3/24/2006 | 3/24/2006 | P | PART |
Bob Archibald
|
|
|
Construction of footing formwork for north wall in progress.
|
BLD-Other | 3/3/2006 | 3/3/2006 | 3/8/2006 | P | PART |
Bob Archibald
|
|
|
Metal pan deck being placed for floors, Foundation walls have been backfilled against (west, south and part of east). Excavation in progress for north foundation wall.
|
BLD-Conference | 2/10/2006 | 2/10/2006 | 2/10/2006 | P | PART |
Bob Archibald
|
|
|
Issued CN requesting resubmittals (structural and architectual). Also required separate application ands permit for patio on north end of structure.
|
BLD-Foundation | 2/1/2006 | 2/1/2006 | 2/1/2006 | A | PART |
Bob Archibald
|
|
|
Remainder of south wall and east wall placed, both engineer and special inspection had reviewed. This concrete placement completes 3/4 of footing and foundation with only the north wall remaining to be placed.
|
MISC ACTIONS | | | 1/24/2006 | | PART |
Bob Archibald
|
|
|
Second story addition on south half of structure approved by Historic Commission, DR05-00415. Revised plans must be submitted for review prior to construction.
|
BLD-Footing | 1/23/2006 | 1/23/2006 | 1/23/2006 | P | PART |
Bob Archibald
|
|
|
Remainder of south wall and south 1/2 of east wall formed and ready for concrete placement. When placed this will complete 2/3rds of footing and foundation. Work in progress on northeast corner to plumb structural steel.
|
BLD-Footing | 12/2/2005 | 12/2/2005 | 12/2/2005 | A | PART |
Bob Archibald
|
|
|
Remainder of 13th street, northwest corner, footing has been placed and special inspection was provided. Excavation and formwork placement for footing in progress on southeast corner of project.
|
BLD-Concrete | 11/18/2005 | 11/18/2005 | 11/18/2005 | P | PART |
Bob Archibald
|
|
|
1st floor pan deck being installed, footing being formed at northwest corner.
|
BLD-Concrete | 11/10/2005 | 11/10/2005 | 11/10/2005 | P | PART |
Bob Archibald
|
|
|
Basement slab placement in progress, observed special inspection report and witnessed concrete testing.
|
BLD-Foundation | 11/2/2005 | 11/2/2005 | 11/2/2005 | P | PART |
Bob Archibald
|
|
|
Met with structural engineer and reviewed foundation wall reinforcement on southwest corner of building, concrete placement scheduled for 11/03/05. Requested a entire stamped engineering package when concrete work was completed as design requirements had changed. Craig said he would provide.
|
BLD-Foundation | 10/28/2005 | 10/28/2005 | 10/28/2005 | P | PART |
Bob Archibald
|
|
|
Foundation reinforcement and forms in place, special inspection has been performed and passed (1/2 of south wall and 1/2 of 13th street wall). Also received special inspection reports on welding, concrete breaks and reinforcing inspection
|
BLD-Footing | 10/11/2005 | 10/11/2005 | 10/11/2005 | P | PART |
Bob Archibald
|
|
|
Reinforcing steel being placed in south west corner of structure ~ half the length of 13th street and have the length of south wall. Special inspection has been requested/scheduled by permit holder.
|
BLD-Footing | 9/28/2005 | 9/28/2005 | 9/28/2005 | P | PASS |
Bob Archibald
|
|
|
Special inspection has been performed on the 4 main interior column footing pads. Special inspection reported reinforcing steel exceeded approved plans. Concrete placement scheduled for 9/29/05.
|
BLD-Other | 9/27/2005 | 9/27/2005 | 9/27/2005 | P | PASS |
Bob Archibald
|
|
|
Historic Preservation Commission approved DRH05-00290 for the construction of a second story patio and brick support wall on the north end of this structure. Resubmittals must be provided to plan review for code anaysis.
|
BLD-Conference | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | |
Bob Archibald
|
|
|
Excavation and formwork in progress for the 4 center column footings. Concret placement scheduled for 9/27/05.
|
BLD-Other | 9/16/2005 | 9/16/2005 | 9/16/2005 | P | PART |
Bob Archibald
|
|
|
Excavation near completion. Reported that pit run would be delivered later for footing base.
|
BLD-Other | 9/9/2005 | 9/9/2005 | 9/9/2005 | P | PART |
Bob Archibald
|
|
|
Cable bracing installed for stability of structural frame. No new excavation in progress or placement of formwork for footings.
|
BLD-Conference | 9/1/2005 | 9/1/2005 | 9/1/2005 | P | PART |
Bob Archibald
|
|
|
Site conference with Bill, informed him that schedule must be increased as project is behind schedule. Excavation of basement in progress and Bill informed me that 13th street side foundation will be placed 1st and frame should be on foundation by 15th with remainder to follow shortly after.
|
BLD-Other | 8/26/2005 | 8/26/2005 | 8/26/2005 | P | PART |
Bob Archibald
|
|
|
Excavation of basement in progress, slow.Steel frame outfitted with jacks and has been slightly raised to finished floor elevation.
|
BLD-Conference | 8/1/2005 | 8/1/2005 | 8/1/2005 | P | PART |
Bob Archibald
|
|
|
Met with super, architect and engineer on site to resolve skylight issue. Engineer provided design for structural framing.
|
BLD-Other | 7/28/2005 | 7/28/2005 | 7/28/2005 | P | PART |
Bob Archibald
|
|
|
Site visit. Single story portion of structure on south end has been demo'd and removed, excavation for basement in progress. Structural steel of 2 story near completion.
|
BLD-Other | 7/20/2005 | 7/20/2005 | 7/20/2005 | A | PART |
Bob Archibald
|
|
|
Issued CN on south basement walls listing requirements for window installation. Structural steel roofing near completion.
|
BLD-Other | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | PART |
Bob Archibald
|
|
|
Site review of construction progress to date. Conference with Bill Strack. Structural steel installation near complete in two story roof area, demolition of exterior patio area and removal of roof covering on south single story area in progress. Requested wall stabalization in patio area , northwest corner, diagonal bracing and bearing.
|
BLD-Other | 6/29/2005 | 6/29/2005 | 6/29/2005 | P | PART |
Bob Archibald
|
|
|
Reinforcing of roof still in progress.
|
BLD-Other | 6/23/2005 | 6/23/2005 | 6/23/2005 | P | PART |
Bob Archibald
|
|
|
Site visit. Reinforcing of roof in progress, new framing members being installed along-side existing members. Phone conference with Bill informed him all resubmittals must have signature on wet stamp( architect/engineer).
|
BLD-Conference | 6/17/2005 | 6/17/2005 | 6/17/2005 | A | PART |
Bob Archibald
|
|
|
Conference on below grade windows on southside of structure. Spoke with Mike P. and Jeff N., below grade windows would be allowed on south side provided windows are entirely below finished grade and provided with a protective screening over window well. Window well must remain entirely on property and not cross adjacent property line.Windows would not be a required means of egress. Explained these conditions to Bill S. and requested a resubmittal if windows are to be installed.
|
BLD-Other | 6/17/2005 | 6/17/2005 | 6/17/2005 | A | PART |
Bob Archibald
|
|
|
Notes for activities prior to issuance of this permit are contained in permit # MIS05-00013.
|
Issue PAID IN FULL permit | | | 6/14/2005 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/21/2005 | 1/21/2005 | 6/1/2005 | | PASS |
|
|
|
6/1/2005 11:11:50 M_P - activity updated through activity BLDA022 from case BLD05-00128.
|
Routing - PLAN CHECK | 5/24/2005 | | 6/1/2005 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 6/1/2005 | | DONE |
|
|
|
Parcel tag removed, ok to issue permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2005 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/1/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/1/2005 | | DONE |
|
|
|
lft vm with ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 6/1/2005 | | DONE |
|
|
|
|
Routing - FIRE | 5/18/2005 | | 5/24/2005 | | PASS |
|
|
|
Review comments modified to reflect the installation of fire sprinklers; faxed to architect.
|
Plan resubmittals received | | | 5/20/2005 | | |
|
|
|
Received (2) copies of sheet 3. Routed to Mike P.
|
Routing - PLAN CHECK | 3/30/2005 | | 5/18/2005 | | FAIL |
|
|
|
Second review failed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit. Called architect to request sheet 3 with corretions noted be submitted for review.
|
Plan Reviewer's activity | | | 5/18/2005 | | DONE |
|
|
|
Routing back to fire for another review, architect has specified fire sprinklers will be installed in this structure.
|
Routing - FIRE | 3/23/2005 | | 3/30/2005 | | PASS |
|
|
|
review faxed to architect
|
1st review completed | | | 3/30/2005 | | FAIL |
|
|
|
failed plan check
|
Routing - PLAN CHECK | 3/10/2005 | | 3/23/2005 | | FAIL |
|
|
|
Plan review complete, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing - PLANNING | 3/10/2005 | | 3/10/2005 | | PASS |
|
|
|
Jeff N. Routing to Plan Check.
|
Routing - PLUMBING | 3/9/2005 | | 3/10/2005 | | PASS |
|
|
|
no plumbing no review when plumbing is to be installed in this building submit plans for review.
|
Routing - FIRE | 1/31/2005 | | 2/22/2005 | | |
|
|
|
Misrouted to fire; never showed up on task list due to "pending" status. Advised Darla to investigate the "pending" status and routed plans to Mike P for building review.
|
Routing - Erosion and Sediment | 1/28/2005 | | 1/31/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 1/26/2005 | | 1/28/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 1/25/2005 | | 1/26/2005 | | PASS |
|
|
|
Lots 12 and 13 of Block 10 of Bryon Addition. Lots are described under one tax parcel number.]
|
Plan resubmittals received | | | 1/26/2005 | | DONE |
|
|
|
Received 2 United Water Sheets, & 2 Calcs Taken to Mike P.
|
Plans ACCEPTED BY PLAN TECH | | | 1/25/2005 | | DONE |
|
|
|
Accepted per Bob A. Per Brian M. do not need any of his requirements. Missing Fire Flow Sheet.
|
Application received | | | 1/21/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/21/2005 | | |
|
|
|
|
Fee Review-notes | 1/21/2005 | 1/21/2005 | | | |
|
|
|
|