Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD05-00137
StatusFinaled
Name O'NEILL HOMES LLC
Site Address 2988 S ROOKERY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two and half bathroom 1953 sq. ft. three story townhome on a zero lot line (238 sq. ft. first floor/800 sq. ft. second floor/915 sq. ft. third floor) with a attached 532 sq. ft. two car garage and a 148 sq. ft. deck off the second floor. Per approved plans and requirement list. CUP04-00032 per Susan Riggs and DRH04-00103 Mod. 1 per Sarah Schafer with Planning and Zoning. THIS LOT IS WITHIN THE FLOODPLAIN AREA. A Elevation Certificate is required before calling for a rough framing inspection. An alternate approval letter by Bruce Chatterton, PDS Director, dated 2/3/05 is attached to this permit and approved plans which allows common access across property lines for both units. This alternate requires a two hour wall enclosure, protected eave overhangs, 90 minute rated assemblies and inspection requirements. (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/19/200512/19/200512/19/2005PPASS
DetailsMike Jordan
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled12/19/200512/19/200512/19/2005PPASS
DetailsMike Jordan
Plan Reviewer's activity  9/22/2005 DONE
Elevation Certificate recieved and approved. Inspections okay to be done.
BLD-Conference9/13/20059/14/20059/14/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/13/2005 at 5:21:22 PM. Contact: ###-####.gyp ok on 2 hr wall
BLD-Energy code compliance9/9/20059/9/20059/9/2005PPASS
DetailsJim Storey
craig; Phone #: ###-#### Internet Inspection Request from: Cathy Chil
BLD-Framing/Rough-in9/2/20059/2/20059/2/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/2/2005 at 9:54:18 AM. Contact: ###-####.
FIRE-Conference4/6/20054/6/20054/6/2005PCANC
DetailsForrest France
Fire life safety not required
BLD-Foundation3/29/20053/29/20053/29/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/29/2005 at 7:37:08 AM. Contact: ###-####.
BLD-Foundation3/10/20053/11/20053/11/2005APASS
DetailsDave Hannah
Greg; Phone #: ###-#### Internet Inspection Request from: Jan Rice
Issue PAID IN FULL permit  3/2/2005  
Inspection Record Card- Bld  2/16/2005 DONE
Permit Ready to Issue  2/16/2005 DONE
Telephone call  2/16/2005  
Left voice message and sent a fax that permit is ready and to call for fees information///2/16/05 11:00am BAS
Plan assigned to (SAM)1/24/20052/12/20052/14/2005 PASS
2/14/2005 16:20:34 SAM - activity updated through activity BLDA022 from case BLD05-00137.
Routing - PLAN CHECK2/1/2005 2/14/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/14/2005 DONE
Routing - Erosion and Sediment2/4/2005 2/7/2005 PASS
ESC plan approved (Master plan dated November 1, 2004) with attached conditions.
Routing - PUBLIC WORKS1/27/2005 2/1/2005 PASS
Routing - PLANNING1/24/2005 1/27/2005 PASS
Routed to S. Riggs per CUP04-00032. CUP OK per SR
Pending review by Sara S. in Design Review.

Approved per DRH04-00103 Mod. 1. 11x17 landscape plan attached to site plan. The address wall must maintain a height of less than 3' because of its position within the clear vision triangle. SMS 1/27/05
Application received  1/24/2005