BLD-Final | 10/27/2005 | 10/27/2005 | 10/27/2005 | P | PASS |
Tony Young
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c of o issued
|
DOC - Permit Finaled | 10/27/2005 | 10/27/2005 | 10/27/2005 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 10/26/2005 | 10/26/2005 | 10/26/2005 | P | NR |
Tony Young
|
|
|
troy or office at ###-####; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Grading Inspection | 10/3/2005 | 10/3/2005 | 10/3/2005 | | PASS |
|
|
|
Final grading and drainage approved
|
BLD-Framing/Rough-in | 5/24/2005 | 5/25/2005 | 5/25/2005 | A | PASS |
Tony Young
|
|
|
ralph ###-#### cell; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Energy code compliance | 5/24/2005 | 5/25/2005 | 5/25/2005 | A | PASS |
Tony Young
|
|
|
ralph ###-#### cell; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 5/20/2005 | 5/23/2005 | 5/23/2005 | A | FAIL |
Tony Young
|
|
|
troy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
c/n posted,, ok to insulate un affected areas, need mech sign off 5/23/2005 12:52:35 PM
|
BLD-Framing/Rough-in | 5/11/2005 | 5/11/2005 | 5/11/2005 | P | PART |
Tony Young
|
|
|
shear wall re-inspection//troy or office at ###-####; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
ext. shear ok 5/11/2005 2:18:01 PM
|
BLD-Framing/Rough-in | 4/29/2005 | 5/2/2005 | 5/2/2005 | P | FAIL |
Tony Young
|
|
|
shear wall inspection please//Ralph; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
c/n posted 5/2/2005 1:48:21 PM
|
Case Summary (BLD) | | | 4/4/2005 | | |
|
|
|
|
BLD-Foundation | 3/31/2005 | 4/1/2005 | 4/1/2005 | A | PART |
Troy James
|
|
|
doug Note: late morning; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
wip 4/1/2005 10:40:27 AM
|
BLD-Foundation | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/30/2005 at 1:29:42 PM. Contact: ###-####. need approval from zoning for the change, plans required footing to be attached to the house with the casita 3/31/2005 2:15:28 PM
|
BLD-Footing | 3/25/2005 | 3/25/2005 | 3/25/2005 | P | PASS |
Troy James
|
|
|
chris--; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Grading Inspection | 3/14/2005 | 3/14/2005 | 3/14/2005 | | DONE |
|
|
|
FOOTING SUBGRADE APPROVED BY THE GEOTECHNICAL ENGINEER
|
PubWorks Subgrade Approval | 2/11/2005 | 2/11/2005 | 3/14/2005 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
|
Override - Activity Holds | | | 3/8/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/8/2005 | | |
|
|
|
|
Override - Activity Holds | | | 3/7/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/7/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/7/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 3/7/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 3/7/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 1/25/2005 | 1/25/2005 | 3/4/2005 | | PASS |
|
|
|
3/4/2005 11:51:39 SRZ - activity updated through activity BLDA022 from case BLD05-00143.
|
Routing - PLAN CHECK | 2/25/2005 | | 3/4/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 3/4/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/18/2005 | | 2/25/2005 | | PASS |
|
|
|
ESC approved with attached conditions. Records indicates plan to ESC on 2/18/05, this was a error. Plan was found in S. Munroe's office on 2/25/05.
|
Routing - FIRE | 2/16/2005 | | 2/18/2005 | | PASS |
|
|
|
No fire sprinklers required (Afton sub, Villa Norte )
|
Routing - PLANNING | 2/14/2005 | | 2/17/2005 | | PASS |
|
|
|
2/14: Spoke with Dave, ARCH: I am still waiting for revised plans showing connected casita. Plans are in failed drawer / please route them back to me so I can complete review.
2/16 Revisions showing connected casita -- casita and home must physically attach per approvals as discussed. Must be doored+ liveable space -- not a gate or courtyard. Must have 4 sides and a structural roof.
|
Routing - Erosion and Sediment | 2/17/2005 | | 2/17/2005 | | FAIL |
|
|
|
No narrative submitted. Informed contractor via voice mail.
|
Plan resubmittals received | | | 2/17/2005 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Stromwater Pollution Prevention Narrative and Specification.
|
Routing - PUBLIC WORKS GRADING | 2/8/2005 | | 2/11/2005 | | PASS |
|
|
|
APPROVED AS CATEGORY 3
|
Routing - PUBLIC WORKS | 2/11/2005 | | 2/11/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 2/8/2005 | | 2/8/2005 | | FAIL |
|
|
|
per request from SRS and HS, eeg worked with architect for solution to attach cassita to primary structure maintaining interior courtyard. Received and approved revised sketch 02/07/05. Informed applicant that revised floor plan, foundation plan and roof plan were needed for Steve Munroe. Per discussion with Angela Wood, continue to route plans for review but hold planning approval until revised documents are received. Spoke with applicant 02/07/05 eeg. 02/08/08 routed to Terry Records per AW
|
Routing - PLANNING | 1/25/2005 | | 1/26/2005 | | FAIL |
|
|
|
Discussed casita in front of dwelling with J. Glancey, ARCH, wanted to speak with Scott, forwarded plans to Scott.
|
Routing - PUBLIC WORKS GRADING | 1/25/2005 | | 1/26/2005 | | FAIL |
|
|
|
Plan must be revised. Casitas is not allowed in proposed location.
|
Application received | | | 1/25/2005 | | |
|
|
|
|