Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-00198
StatusFinaled
Name TRI-NORTH BUILDERS INC
Site Address 350 N MILWAUKEE ST Unit: 2120
Project NameBTS - #2120
Customer Number 
ePlanReviewNo
Description
(AEROPOSTALE)(BOISE TOWNE SQUARE-SPACE 2120)To remodel a new 3526 sq ft tenant space located on the second floor for new retail tenant. Work to include interior demolition of selective partitions, restrooms, and finishes, construction of interior partition to create new storage area, sales area and restroom, construction of new corridor exit access, construction of new storefront system per attached engineering, installation of new roll down security grill, installation of new suspended ceiling system, new lighting and Hvac system, miscelaneous related interior finishes, and installation of 10 ft high storage racks per engineering this building is fully fire sprinklered and contains a smoke evacuation system. All alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. The smoke evacuation system must remain operational as originally installed. (rmh)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD5/20/20055/20/20055/26/2005 DONE
First Notice has not been responded to.
Second Notice BLD5/20/20055/20/20055/26/2005 DONE
First Notice has not been responded to.
First Notice 4/19/20055/20/2005 DONE
BLD-Final4/18/20054/19/20054/19/2005APASS
DetailsDave Hannah
late am ###-#### Michael ok for perm occ 4/19/2005 10:34:48 AM
Permanent occupancy UNPAID FEE  4/19/2005 DONE
Perm. Occ. Cert. # 10538 issued 4-19-05 to Aeropostale on the 2nd floor of Boise Towne Square.
BLD-Final4/15/20054/18/20054/18/2005PCANC
DetailsDave Hannah
###-####
Permanent Occupancy 4/18/20054/18/2005 DONE
Details
BLD-Final4/15/20054/15/20054/15/2005PNR
DetailsTony Young
BLD-Final4/14/20054/15/20054/15/2005ACANC
DetailsTom Arcoraci
late am ###-#### Michael
FIRE-Final Inspection4/14/20054/14/20054/14/2005PPASS
DetailsTroy Cobbley
fire life safety finaled
BLD-Final4/13/20054/14/20054/14/2005PCANC
DetailsDave Hannah
MICHAEL; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Sprinkler Rough-in3/31/20054/1/20054/1/2005APART
DetailsForrest France
Fire sprinkler rough in ok to cover heads in front soffit.
BLD-Framing/Rough-in3/26/20053/28/20053/28/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/26/2005 at 2:31:31 PM. Contact: ###-####. OK to cover all..... Check all firestopping at final....and include back side of rear wall beyond locked door. 3/28/2005 11:00:37 AM
BLD-Framing/Rough-in3/23/20053/24/20053/24/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/23/2005 at 3:27:37 PM. Contact: ###-####. ok to cover one side and furred out wall 3/24/2005 11:59:32 AM
Issue PAID IN FULL permit  3/15/2005 DONE
Permit Ready to Issue  3/14/2005  
Inspection Record Card- Bld  3/14/2005  
Print Occupancy Form  3/14/2005  
Telephone call  3/14/2005 DONE
talked to michael murry at ###-#### is ready
Routing - PLAN CHECK3/10/2005 3/11/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/11/2005 DONE
Case Summary (BLD)  3/11/2005 DONE
Plan assigned to (R_H)2/10/2005 3/11/2005 PASS
3/11/2005 09:06:52 RMH - activity updated through activity BLDA022 from case BLD05-00198.
Routing - FIRE3/5/2005 3/10/2005 PASS
resubmittal acceptable.
Routing - PLAN CHECK3/1/2005 3/2/2005 PEND
Resubmittals reviewed no corrections required by building department, Routed to fire on 3/2/05, permit pending fire department approval.
Routing - FIRE2/17/2005 3/1/2005 FAIL
A Fire review cannot be completed due to extensive plan deficiencies itemized on Building plan review. Review comments will be prepared after complete plans are resubmitted. A Brief report was faxed to architect.
Plan resubmittals received  3/1/2005 DONE
Received Transmittal, 1 Resopnse letter, 2 8 1/2 X 14sheets EXA-1, 2 Structural Calcs,& 2 Copys of sheets CS,A1,A2,A6,A7,A8,M1,E4,S1,S2 Taken to Ron Hill.
1st review completed  3/1/2005 FAIL
failed Plan check and Fire.
Routing - PLAN CHECK2/11/2005 2/17/2005 FAIL
Faxed and mailed requirements to the architect on 2/17/05, Routed plans to fire on the same day.
Routing - PUBLIC WORKS2/10/2005 2/11/2005 PASS
Application received  1/28/2005  
Recd Pcfee & Taken To Pln CK  1/28/2005 DONE
Plans ACCEPTED BY PLAN TECH  1/28/2005 DONE
Ok to take in plans per Ron H.
Fee Review-notes3/14/20053/14/2005