Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-00205
StatusFinaled
Name LISA RIZZA
Site Address 4699 N SETTLERS RIDGE PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 4881 sq. ft. DUPLEX. The main unit has five bedrooms, four and quarter bathroom with 4283 sq. ft. (2579 sq. ft. first floor/1704 sq. ft. second floor) with a attached 1029 sq. ft. two car garage. The second unit is a one bedroom, one bathroom with 598 sq. ft. with a attached 752 sq. ft. two car garage. Per approved plans, engineering and requirement list. THIS STRUCTURE IS BEING BUILT TO ONLY MEET DUPLEX STANDARDS AND NOT TO BE SOLD AS INDIVIDUAL UNITS. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible space will be required. CAA05-18 per Angela Wood with Planning and Zoning. (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/21/200512/22/200512/22/2005APASS
DetailsTony Young
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled12/22/200512/22/200512/22/2005PPASS
DetailsTony Young
c of o issued
BLD-Grading Inspection12/21/200512/21/200512/21/2005 BOND
Rough grading complete and OK. Fine grading and downspouts are not complete. For this a $1,000.00 bond is recommended. Upon submission of the bond the grading and drainage is conditionally approved.
BLD-Final12/16/200512/19/200512/20/2005ANR
DetailsTony Young
gary; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
need hillside sign-off
BLD-Final12/15/200512/16/200512/16/2005APART
DetailsTony Young
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
walk through,, looks ok,, need hillside signoff,, not a formal inspection
BLD-Conference12/2/200512/5/200512/5/2005APART
DetailsTony Young
gary-- call 2 hrs before insp if possible ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
phone conf. on final
BLD-Conference12/2/200512/2/200512/2/2005PCANC
DetailsTony Young
BLD-Conference11/30/200512/2/200512/2/2005ACANC
DetailsTony Young
please call at least 1 hour prior to schedule time//gary; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Conference12/1/200512/1/200512/1/2005PCANC
DetailsTony Young
call Gary 1st; Phone #: ###-####
BLD-Energy code compliance8/1/20058/2/20058/2/2005APASS
DetailsTony Young
gary; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in7/29/20058/1/20058/1/2005APASS
DetailsTony Young
gary anderson-- re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in7/29/20057/29/20057/29/2005PPART
DetailsTony Young
gary anderson-- re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
met w/ Gary and framer,, worked things out
BLD-Framing/Rough-in7/26/20057/26/20057/26/2005PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 7/26/2005 at 11:27:00 AM.
c/n posted,,, ok to insulate
BLD-Framing/Rough-in7/25/20057/26/20057/26/2005ACANC
DetailsTony Young
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in7/18/20057/20/20057/21/2005ACANC
DetailsTony Young
gary; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in7/20/20057/20/20057/20/2005PFAIL
DetailsTony Young
###-#### per tony
conf. only,,, list on sight,,, not a formal inspection
BLD-Conference5/4/20055/5/20055/5/2005APART
DetailsTony Young
joel; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 10 am,,,joel; Phone #: ###-####
need to sheet rock exterior bearing walls and breezeway walls of mom in law suite to have 1 hour seperation,, over osb 5/5/2005 11:19:08 AM
BLD-Foundation4/25/20054/25/20054/25/2005PPART
DetailsTony Young
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Grading Inspection4/22/20054/22/20054/22/2005 DONE
Footing subgrade approved
BLD-Footing4/22/20054/22/20054/22/2005PPART
DetailsTony Young
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
wip 4/22/2005 4:03:42 PM
PubWorks Subgrade Approval1/28/20051/28/20054/22/2005 PASS
Footing subgrade approved by the geotechnical engineer. 4/22/05

A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
Override - Activity Holds  3/25/2005  
Issue PAID IN FULL permit  3/25/2005 DONE
Plan assigned to (SAM)3/2/20053/18/20053/24/2005 PASS
3/24/2005 11:05:59 SAM - activity updated through activity BLDA022 from case BLD05-00205.
Routing - PLAN CHECK3/2/2005 3/24/2005 PASS
Steve M.
Case Summary (BLD)  3/24/2005  
PLANS/APPL TAKEN TO FRONT DESK  3/24/2005 DONE
Override - Activity Holds  3/24/2005  
Permit Ready to Issue  3/24/2005  
Override - Activity Holds  3/24/2005  
Inspection Record Card- Bld  3/24/2005 DONE
Print Occupancy Form  3/24/2005 DONE
Telephone call  3/24/2005 DONE
left mess that permit is ready
Plan Reviewer's activity  3/21/2005 DONE
3/21/05 0758 I called and left a message for Robert Pedersen to call me. I have questions on the porch footing sizes, three 'BM2' call outs, shear line 4 and I need a detail for the one hour separation requirement for the "duplex". Plans are on hold.
Routing - FIRE2/23/2005 3/1/2005 PASS
No fire sprinklers required (Arrowhead Ridge sub.)
Routing - Erosion and Sediment2/22/2005 2/23/2005 PASS
ESC plan approved with attached conditions.
Routing - PLANNING2/22/2005 2/22/2005 PASS
Per CAA05-18 ADU approved. AKW
Routing - PUBLIC WORKS1/28/2005 1/31/2005 PASS
Routing - PLANNING1/31/2005 1/31/2005 FAIL
Fail: Applicant will need approval for an accessory dwelling unit prior to issuance of the building permit. Informed them at the front counter at 9:30 a.m. on 1/31/05.
Application received  1/28/2005  
Routing - PUBLIC WORKS GRADING1/28/2005 1/28/2005 PASS
Approved as Category 3