Third Notice BLD | 12/6/2005 | 12/6/2005 | 2/13/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 10/27/2005 | 10/27/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 10/12/2005 | 10/12/2005 | 10/27/2005 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 10/11/2005 | 10/12/2005 | 10/12/2005 | A | PASS |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/C issued
|
DOC - Permit Finaled | 10/12/2005 | 10/12/2005 | 10/12/2005 | P | PASS |
Jim Sly
|
|
|
C/C issued
|
BLD-Final | 9/29/2005 | 9/30/2005 | 9/30/2005 | A | NR |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need Letter from Eng addressing discrepancies per special insp final report. and Fire/life safety final.
|
BLD-Final | 9/28/2005 | 9/28/2005 | 9/28/2005 | P | NR |
Mike Jordan
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 8/23/2005 | 8/24/2005 | 8/24/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety passed inspection.
|
FIRE-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | CANC |
Troy Cobbley
|
|
|
jamal; Phone #: ###-####
|
Code Occupancy Approval | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | FAIL |
Carol Montgomery
|
|
|
Landscape at the se corner of the building needs to be replaced/reworked. Also need to have a gate on the trash enclosure.
|
FIRE-Final Inspection | 8/17/2005 | 8/18/2005 | 8/18/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide the correct remote annunciators for the duct smoke detectors and turn the sample tubes per the manufacturers recommendations into the airstream for proper sampling.
|
PubWorks Occupancy Approval | 8/17/2005 | 8/17/2005 | 8/17/2005 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 8/17/05. G.Fitts
|
BLD-Wall cover | 8/3/2005 | 8/4/2005 | 8/4/2005 | A | PASS |
Jim Sly
|
|
|
###-#### - GIL NOTE: CEILING grid ok
|
Override - Condition Holds | | | 8/3/2005 | | |
|
|
|
|
BLD-Framing/Rough-in | 8/1/2005 | 8/1/2005 | 8/1/2005 | P | NR |
Jim Sly
|
|
|
###-#### - GIL NOTE: CEILING NR
|
Override - Condition Holds | | | 8/1/2005 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/15/2005 | 6/15/2005 | 6/15/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 7:29:49 AM. Contact: ###-####. Framing at Ext walls OK.
|
BLD-Framing/Rough-in | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/2/2005 at 12:40:38 PM. Contact: ###-####. Welding completed and special insp done on front Canopy.
|
BLD-Framing/Rough-in | 5/31/2005 | 6/1/2005 | 6/1/2005 | P | FAIL |
Jim Sly
|
|
|
per your request Internet Inspection Request from: Letitia Mesa C/N... Connection of vertical studs at awning (front) to cantilevered roof to be welded, not shot on. See S-2 detail 15.
|
BLD-Framing/Rough-in | 5/31/2005 | 5/31/2005 | 5/31/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 9:54:28 AM. Contact: ###-####. re-call for frame insp when all trades approved.
|
BLD-Conference | 4/20/2005 | 4/20/2005 | 4/20/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/20/2005 at 8:57:48 AM. Contact: ###-####. looked at re-submittal that they would like me to approve for changes in restroom locations and additional restroom added. 4/20/2005 4:11:33 PM
|
BLD-Footing | 4/8/2005 | 4/12/2005 | 4/12/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 9:42:35 AM. Contact: ###-####. Footing OK pending MTI special insp, tests, and approvals. 4/12/2005 10:37:46 AM
|
BLD-Conference | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 9:33:06 AM. Contact: ###-####. Met with Gil.....Next to Albertsons. 4/8/2005 2:57:15 PM
|
(F) Reprint permit | | | 3/31/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/30/2005 | | |
|
|
|
|
Telephone call | | | 3/10/2005 | | DONE |
|
|
|
tlk to jim marsh ###-#### that permit and fees are ready but does not copy for the ACHD
|
Inspection Record Card- Bld | | | 3/9/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/9/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/9/2005 | | DONE |
|
|
|
Received Transmittal & 1 Copy of sheet 1.1 Taken to John M . Plans are in the ready mode.
|
Telephone call | | | 3/9/2005 | | DONE |
|
|
|
lft vm with CSCQA that permit and fees are ready - had some questions concerning the permit
|
Routing - PLAN CHECK | 3/4/2005 | | 3/8/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 2/2/2005 | | 3/8/2005 | | PASS |
|
|
|
3/8/2005 09:59:03 JCM - activity updated through activity BLDA022 from case BLD05-00236.
|
Plan resubmittals received | | | 3/7/2005 | | DONE |
|
|
|
Received Transmittal Letter, 3 Structural Design Calcs, & 3 Copys of sheet S2 Taken to John M.
|
Routing Off Site - STRUCTURAL | 3/3/2005 | | 3/4/2005 | | FAIL |
|
|
|
Resubmittals sent via PDQ on 3/3/2005 - Received comment list from consulting structural engineer requesting addtional revisions.JCM
|
Plan resubmittals requested | | | 3/4/2005 | | DONE |
|
|
|
Faxed the engineer of record a ocpy of the comment list from the consulting structural engineer requesting additional revisions. JCM
|
Routing - PLAN CHECK | 3/3/2005 | | 3/4/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 3/4/2005 | | 3/4/2005 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - PLANNING | 3/4/2005 | | 3/4/2005 | | PASS |
|
|
|
Plans comply with CUP04-00089, which includes DR staff review per CUP conditions of approval.
|
1st review completed | | | 3/3/2005 | | FAIL |
|
|
|
failed planning, plan check, structural, ESC and fire.
|
Routing - FIRE | 2/24/2005 | | 3/3/2005 | | PASS |
|
|
|
resubmittal acceptable. Revised review faxed to architect.
|
Plan resubmittals received | | | 3/2/2005 | | DONE |
|
|
|
Received cover letter responding to resubmittals, 2 copies of supplemental structural design calcs, 1 copy soil & foundation evaluation, and 2 copies of sheets G0.1, A1.3, A4.1, A10.1, ASP1, S1, S2 and E1.1 and forwarded to John M. Received 1 copy of Site Development Plan and forwarded to Sam Rogers.
|
Plan resubmittals received | | | 2/25/2005 | | DONE |
|
|
|
Received ESC Application, 2 ESC Narratives & 2 Copys of sheet C1.1 Taken to John M.
|
Plan resubmittals requested | | | 2/24/2005 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 2/15/2005 | | 2/24/2005 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 2/22/2005 | | DONE |
|
|
|
Faxed the project engineer a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 2/2/2005 | | 2/21/2005 | | FAIL |
|
|
|
Called PDQ for pick up ---- Received a faxed copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - FIRE | 2/10/2005 | | 2/15/2005 | | FAIL |
|
|
|
lacks site plan showing FD access and hydrants, hardware issue.
|
Routing - PLANNING | 2/9/2005 | | 2/10/2005 | | FAIL |
|
|
|
Need site plan showing all easements, and need compliance with Design Review Staff comments (includes wall light height and 6' decorative wall). Karen G. CUP04-00089
|
Routing - PLUMBING | 2/7/2005 | | 2/9/2005 | | PASS |
|
|
|
Thermal expansion tank and Prv piped to approved location as required by 2003 UPC 608.3 Approved as noted,per plan and 2003 UPC
|
Routing - Erosion and Sediment | 2/7/2005 | | 2/7/2005 | | FAIL |
|
|
|
Incomplete application, no rp, no address and no applicant listed. Complete and re-submit. Plan is incomplete as well. Informed PD.
|
Routing - PUBLIC WORKS | 2/3/2005 | | 2/7/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 2/2/2005 | | 2/3/2005 | | PASS |
|
|
|
Lot 6, Block 1 of Lowell Plaza Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 2/2/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/2/2005 | | |
|
|
|
|
Application received | | | 2/1/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/1/2005 | | |
|
|
|
|
Fee Review-notes | 2/1/2005 | 2/1/2005 | | | |
|
|
|
|