Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD05-00253
StatusFinaled
Name PEPPERWOOD DEVELOPMENT CORP
Site Address 2501 S GATEWOOD LN
Project NamePepperwood Townhouse
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two bathroom 1591 sq. ft. single story town home on a zero lot line with a attached 546 sq. ft. two car garage. Per approved plans, engineering and requirement list. THIS LOT IS WITHIN THE FLOODPLAIN AREA. An Elevation Certificate is required before calling for a rough framing inspection. (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/13/2012  
(F) Reprint permit  10/5/2006 DONE
CHANGE STATUS TO (FNL)  5/18/2006 DONE
already fn on 10/11/05/mls
BLD-Final10/10/200510/10/200510/10/2005PPASS
DetailsTom Arcoraci
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final8/16/20058/16/20058/16/2005PCANC
DetailsMike Jordan
ben; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/16/20058/16/20058/16/2005PPASS
DetailsMike Jordan
###-#### - ben Note: please call 1/2 hr prior to inspection. 1hr wall const. ok.
BLD-Energy code compliance8/16/20058/16/20058/16/2005PPASS
DetailsMike Jordan
ben; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/11/20058/12/20058/12/2005APASS
DetailsTom Arcoraci
please call 30 min prior to meet//ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Other6/6/20056/6/20056/6/2005PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/6/2005 at 8:23:39 AM. Contact: ###-####. 1 hr wall nailing ok
BLD-Foundation4/12/20054/13/20054/13/2005APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/12/2005 at 6:22:17 PM. Contact: ###-####.
BLD-Footing4/7/20054/7/20054/7/2005PPASS
DetailsTom Arcoraci
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Plan assigned to (SAM)2/1/20053/18/20053/18/2005 PASS
3/18/2005 08:56:14 SAM - activity updated through activity BLDA022 from case BLD05-00253.
Routing - PLAN CHECK3/15/2005 3/18/2005 PASS
Case Summary (BLD)  3/18/2005  
PLANS/APPL TAKEN TO FRONT DESK  3/18/2005 DONE
Permit Ready to Issue  3/18/2005  
Inspection Record Card- Bld  3/18/2005  
Telephone call  3/18/2005 DONE
left mess that permit is ready
Issue PAID IN FULL permit  3/18/2005  
Routing - PUBLIC WORKS3/14/2005 3/15/2005 PASS
Routing - PLANNING3/14/2005 3/14/2005 PASS
Routing - PLANNING2/1/2005 3/3/2005 FAIL
Carl Miller. They show a side-entry garage with vehicle backup onto an adjacent lot. I have called Brian Blaser for a cross access agreement.

Application received  2/1/2005