Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-00255
StatusFinaled
Name PEPPERWOOD DEVELOPMENT CORP
Site Address 2537 S GATEWOOD LN
Project NamePepperwood Townhouse
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two bathroom 1554 sq. ft. two story townhome on a zero lot line (1012 sq. ft. first floor/542 sq. ft. second floor) with a attached 483 sq. ft. two car garage. Per approved plans, engineering and requirement list. THIS LOT IS WITHIN THE FLOODPLAIN AREA. A Elevation Certificate is required before calling for a rough framing inspection. (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  10/5/2006 DONE
BLD-Final12/5/200512/6/200512/6/2005ADONE
DetailsTony Young
late am please////brian or ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final12/5/200512/6/200512/6/2005APASS
DetailsJim Storey
SCOTT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
DOC - Permit Finaled12/6/200512/6/200512/6/2005PPASS
DetailsJim Storey
BLD-Final12/2/200512/5/200512/5/2005PNR
DetailsJim Storey
SCOTT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance9/13/20059/14/20059/14/2005APASS
DetailsTom Arcoraci
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in9/9/20059/9/20059/9/2005PPASS
DetailsTom Arcoraci
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/17/20058/18/20058/18/2005APART
DetailsDave Hannah
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles walked project with contractor oked him to insulate and rock fire walls no plans on site
BLD-Framing/Rough-in7/8/20057/11/20057/12/2005PFAIL
DetailsDave Hannah
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs flood plain cert
BLD-Foundation3/25/20053/25/20053/25/2005PPART
DetailsDave Hannah
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie allready poured 3/25/2005 12:24:21 PM
BLD-Footing3/16/20053/17/20053/17/2005ADONE
DetailsTroy James
Scheduled by a contractor via Hello! on 3/16/2005 at 2:56:10 PM. Contact: ###-####. inspected on other permit # for lot 9 block 4 3/17/2005 8:35:14 AM
Plan assigned to (SAM)2/1/20053/2/20053/9/2005 PASS
3/9/2005 13:17:31 SAM - activity updated through activity BLDA022 from case BLD05-00255.
Routing - PLAN CHECK2/28/2005 3/9/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/9/2005 DONE
Only one set is approved due to excessive red-lining.
Inspection Record Card- Bld  3/9/2005 DONE
Issue PAID IN FULL permit  3/9/2005 DONE
Routing - PUBLIC WORKS2/24/2005 3/8/2005 PASS
Incorrect elevation certificate, no finish floor elevations. Contact Jim Wyllie at ###-####
Case Summary (BLD)  3/8/2005  
Routing - PLANNING2/1/2005 2/24/2005 PASS
Application received  2/1/2005