(F) Reprint permit | | | 10/5/2006 | | |
|
|
|
|
BLD-Final | 9/9/2005 | 9/9/2005 | 9/9/2005 | P | PASS |
Tom Arcoraci
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
DOC - Permit Finaled | 9/9/2005 | 9/9/2005 | 9/9/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 5/17/2005 | 5/18/2005 | 5/18/2005 | A | PASS |
Tom Arcoraci
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 5/13/2005 | 5/13/2005 | 5/13/2005 | P | PASS |
Tom Arcoraci
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Conference | 5/5/2005 | 5/5/2005 | 5/5/2005 | P | PASS |
Tom Arcoraci
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore may hve to do some creative 1 hr wall consrtuction otherwise ok
|
BLD-Conference | 4/12/2005 | 4/13/2005 | 4/13/2005 | A | DONE |
Troy James
|
|
|
conference with Stock building supply and contractor in regards to what the city of boise requirements for the fire walls. 4/13/2005 9:14:40 AM 4/13/2005 9:19:28 AM
|
BLD-Foundation | 3/15/2005 | 3/15/2005 | 3/15/2005 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 3/10/2005 | 3/11/2005 | 3/11/2005 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/10/2005 at 1:38:22 PM. Contact: ###-####. wip ok 3/11/2005 10:34:57 AM
|
Plan assigned to (SAM) | 2/1/2005 | 3/1/2005 | 3/8/2005 | | PASS |
|
|
|
3/8/2005 06:27:49 SAM - activity updated through activity BLDA022 from case BLD05-00256.
|
Routing - PLAN CHECK | 2/28/2005 | | 3/8/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2005 | | DONE |
|
|
|
Only one set of plans was approved due to excessive red-lining.
|
Inspection Record Card- Bld | | | 3/8/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/8/2005 | | |
|
|
|
|
Telephone call | | | 3/8/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 3/8/2005 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 2/24/2005 | | 3/7/2005 | | PASS |
|
|
|
Routed to PW on 2/24/2005: Incorrect elevation certificate, no finish floor evelvations on plans. Contact Jim Wyllie at ###-####
|
Case Summary (BLD) | | | 3/7/2005 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/1/2005 | | DONE |
|
|
|
15:30 I called and talked to Rob Thorton. I let him know that I need the engineering calculations for the wall bracing and that I had questions on the REScheck. He will have Brian call me for the REScheck questions. Plans are on hold.
|
Routing - PLANNING | 2/1/2005 | | 2/24/2005 | | PASS |
|
|
|
|
Application received | | | 2/1/2005 | | |
|
|
|
|