Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-00259
StatusFinaled
Name JV GALLLERY
Site Address 2895 S FEDERAL WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
(JV GALLERY - SUITE 102) This building is fire sprinklered for area increase, story increase, and fire area. To create a 7,041 square foot 1st story tenant space (3,940 square foot showroom, 260 square foot office, 201 square foot breakroom, 260 square foot restroom core, and 2,380 square foot warehouse) and to construct interior tenant improvements. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, a new stairway to serve a future tenant on the 2nd floor, suspended ceilings, and interior finishes all per the approved drawings and the plan review report on file. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD7/13/20057/13/20057/28/2005 DONE
This permit finaled on the web by Brandon Sorensen
First Notice 5/23/20057/13/2005 DONE
Permanent occupancy UNPAID FEE  5/23/2005 DONE
Perm. Occ. Cert. #10591 issued 5-23-05 to the JV Gallery.
Permanent Occupancy 5/20/20055/20/2005 DONE
Details
BLD-Final5/17/20055/17/20055/17/2005PPART
DetailsJim Storey
odie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa auto flush bolts/12 handrail top of stair
FIRE-Final Inspection5/13/20055/13/20055/13/2005PPASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection5/6/20055/9/20055/9/2005AFAIL
DetailsForrest France
Need building suite address posted. Need approved door hardware installed, waiting on parts delivery per. contractor.
BLD-Energy code compliance4/20/20054/20/20054/20/2005PPASS
DetailsJim Storey
odie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in4/20/20054/20/20054/20/2005PPASS
DetailsJim Storey
ceiling grid inspection///odie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Energy code compliance4/6/20054/6/20054/6/2005PPART
DetailsDave Hannah
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore insulation under stairs ok still some question on sprinkler heads under stairs 4/6/2005 1:25:08 PM
BLD-Energy code compliance3/29/20053/30/20053/30/2005APASS
DetailsJim Storey
tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie r-15 on walls ok/pending other idems on c/n.
BLD-Framing/Rough-in3/24/20053/25/20053/25/2005PFAIL
DetailsJim Storey
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c/n 3/25/2005 5:16:07 PM
Issue PAID IN FULL permit  3/24/2005  
Inspection Record Card- Bld  3/23/2005 DONE
Print Occupancy Form  3/23/2005 DONE
Permit Ready to Issue  3/23/2005  
Routing - PLAN CHECK3/21/2005 3/22/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/22/2005 DONE
Plan assigned to (CJW)2/10/2005 3/22/2005 PASS
3/22/2005 14:21:55 CJW - activity updated through activity BLDA022 from case BLD05-00259.
Routing - PLAN CHECK3/17/2005 3/21/2005 DONE
Plan resubmittals received  3/21/2005 DONE
Received United Water fire flow information and passed it on to Carl and Mary.
Routing - FIRE3/21/2005 3/21/2005 PASS
Telephone call  3/18/2005 DONE
Called asn spoke to Wes. I informed him that I did locate the fire extinguisher and the only information required would be the water pressure and flow information from United Water.
Routing - FIRE3/12/2005 3/17/2005 FAIL
Fail, incorrect water information has been submitted. Resubmittal required.
Telephone call  3/17/2005 DONE
Called Bob Camp to request the proper information on item #2 and to inquire which sheet the fire extinguisher was shown on. He is on vacation until Monday, I left a message for Brandy to call me tomorrow morning.
Routing - PLAN CHECK3/12/2005 3/12/2005 DONE
Inserted resubmitted drawings. Sent back to Fire.
Plan resubmittals received  3/11/2005 DONE
Received 1 Transmittal, 1 United Water sheet & 2 Copys of sheets A0,A2.1,E.1 Taken to Carl W.
Routing - FIRE3/4/2005 3/9/2005 FAIL
No response provided to the previous fire review resubmittal reuqirements. No further review was done. Review comments again faxed to architect.
Routing - PLAN CHECK3/1/2005 3/4/2005 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  3/2/2005 DONE
Received cover letter, 2 copies of new certificates of value, structural responses and calculations, 2 copies of sheets A0, A2.1, A2.2, A4.1, A7.1 and E.1 and forwarded to Carl Westfall.
1st review completed  3/1/2005 FAIL
failed plan check and fire.
Routing - FIRE2/17/2005 3/1/2005 FAIL
Numerous deficiencies, see attached review. Review faxed to architect.
Routing - PLUMBING2/16/2005 2/17/2005 PASS
per plans and 2003 upc
Routing - PLAN CHECK2/11/2005 2/16/2005 FAIL
The IBC plan review report was started Feb. 14, 2005 and was finished Feb. 16, 2005. Resubmitted drawings were required. See the plan review report.
Routing - PUBLIC WORKS2/10/2005 2/11/2005 PASS
Plan resubmittals received  2/8/2005 DONE
Received Document Transmittal , 3 Copys of sheet E 1 . Inserted into main plans and taken back to Marlene.
Plan resubmittals received  2/7/2005 DONE
recvd 3 copies of E-1
Application received  2/2/2005  
Recd Pcfee & Taken To Pln CK  2/2/2005  
Plans ACCEPTED BY PLAN TECH  2/2/2005 DONE
Needs to have 2003 Lighting Comp.