BLD-Final | 11/25/2005 | 11/28/2005 | 11/28/2005 | A | PASS |
Jim Sly
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/C issued
|
DOC - Permit Finaled | 11/28/2005 | 11/28/2005 | 11/28/2005 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 11/23/2005 | 11/25/2005 | 11/25/2005 | P | NH |
Tom Arcoraci
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Final | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | NR |
Jim Sly
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Verbal to contractor..... Egress ladder, wrap ductwork in basement, Top riser at stair to bsmnt 8 1/2 "...... Non complying Garage stairs (2 sets)
|
BLD-Framing/Rough-in | 8/24/2005 | 8/24/2005 | 8/24/2005 | P | PASS |
Jim Sly
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Energy OK
|
BLD-Energy code compliance | 8/22/2005 | 8/22/2005 | 8/22/2005 | P | NR |
Jim Sly
|
|
|
wayne; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 8/22/2005 | 8/22/2005 | 8/22/2005 | P | NR |
Jim Sly
|
|
|
wayne; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Conf with Contr
|
BLD-Energy code compliance | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | NR |
Jim Sly
|
|
|
dane--re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need Framing pass 1st
|
BLD-Framing/Rough-in | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | NR |
Jim Sly
|
|
|
dane--re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Complete corr.
|
BLD-Framing/Rough-in | 8/17/2005 | 8/17/2005 | 8/17/2005 | P | FAIL |
Jim Sly
|
|
|
dane -re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Complete corrections
|
BLD-Framing/Rough-in | 8/15/2005 | 8/16/2005 | 8/16/2005 | P | FAIL |
Jim Sly
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa C/N posted
|
BLD-Framing/Rough-in | 8/5/2005 | 8/8/2005 | 8/8/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/5/2005 at 12:30:00 PM. Contact: ###-####.
|
BLD-Foundation | 5/12/2005 | 5/13/2005 | 5/13/2005 | A | PASS |
Jim Sly
|
|
|
re-bar//cliff; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 5/9/2005 | 5/10/2005 | 5/10/2005 | A | PASS |
Jim Sly
|
|
|
cliff; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 5/6/2005 | 5/9/2005 | 5/9/2005 | P | CANC |
Jim Sly
|
|
|
cliff ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Override - People Holds | | | 4/21/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/21/2005 | | |
|
|
|
|
OVERRIDE | | | 4/19/2005 | | |
|
|
|
|
OVERRIDE | | | 4/19/2005 | | |
|
|
|
|
OVERRIDE | | | 4/19/2005 | | |
|
|
|
|
OVERRIDE | | | 4/19/2005 | | |
|
|
|
|
OVERRIDE | | | 4/19/2005 | | |
|
|
|
|
OVERRIDE | | | 4/19/2005 | | |
|
|
|
|
Plan assigned to (SRZ) | 3/29/2005 | 3/29/2005 | 4/19/2005 | | DONE |
|
|
|
I requested Engineering for two Concrete Pads. One in garage that has a estimated 20,000 lb. point load. The other is located over a basement/garage common wall that has a estimated 27,500 lb. point load. Plan Review is complete when I get Engineered Concrete Footing Details. (SRZ)
|
Plan assigned to (SAM) | 2/4/2005 | 2/4/2005 | 4/19/2005 | | PASS |
|
|
|
4/19/2005 09:23:21 SRZ - activity updated through activity BLDA022 from case BLD05-00272.
|
Routing - PLAN CHECK | 3/14/2005 | | 4/19/2005 | | PASS |
|
|
|
Public Works forgot to do electronic log out to plan review on 3-14-05, was done on 4-13-05, lw
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2005 | | DONE |
|
|
|
ONLY ONE SET RED-LINED DUE TO EXCESSIVE RED-LINING.
(SRZ)
|
Override - People Holds | | | 4/19/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/19/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/19/2005 | | DONE |
|
|
|
lft vm with matthhew that permit and fees are ready and verify his mailing address
|
Override - People Holds | | | 4/19/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 4/19/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/30/2005 | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/14/2005 | | 3/14/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 3/11/2005 | | 3/14/2005 | | PASS |
|
|
|
Okay per revised drawings submitted on Friday, March 11th.
|
Routing - PLANNING | 3/10/2005 | | 3/10/2005 | | FAIL |
|
|
|
Revised plans still indicate a driveway in excess of 33' wide within the front setback. Left a message w/ applicant at 10:00 a.m. today.
|
Application received | | | 2/4/2005 | | |
|
|
|
|
Routing - PLANNING | 2/4/2005 | | 2/4/2005 | | FAIL |
|
|
|
Driveway in excess of 50' wide in the front setback.
|